If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

RTC 2026

Discussion in 'What's Going On' started by 2857Harry, Aug 13, 2025.

  1. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Joined:
    Sep 11, 2005
    Messages:
    37,591
    Likes Received:
    10,702
    Gender:
    Male
    Occupation:
    Retired-ish, Part time rail tour steward.
    Location:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can't comment as I know nothing about that.
     
  2. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    16,821
    Likes Received:
    20,934
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s not a correct description though and it’s important for the crew to know how the braking system works. If we take a Bulleid Pacific as an example, the air will come on a tad before the vacuum with the steam brake on the engine last. If the engine just has an airbraked support coach in tow any fierce braking could cause the wheels to lock resulting flats. LNER and GWR engines are all vacuum so the same applies, I’m not sure about how the all steam braked LMS and BR Standard locos are set up.
     
  3. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    16,821
    Likes Received:
    20,934
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are correct, 5593 is an earlier engine with a short firebox vertical throatplate boiler. The boilers won’t be interchangeable without modifying the frames. Some engines were modified in this way to speed up overhauls but not 5593. The later long firebox boilers were fitted from 5654 onwards.
     
  4. GWR4707

    GWR4707 Nat Pres stalwart

    Joined:
    May 12, 2006
    Messages:
    20,146
    Likes Received:
    19,245
    Gender:
    Male
    Location:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When, there are photos of her still at Carlisle this AM, one would assume she will need a careful inspection in the light before any decision re recovery via rail or road?
     
  5. neildimmer

    neildimmer Resident of Nat Pres

    Joined:
    Jun 6, 2008
    Messages:
    10,154
    Likes Received:
    1,636

    Thanks, when I posted that message I had no knowledge it was still at Carlisle
     
  6. acorb

    acorb Part of the furniture

    Joined:
    Jul 17, 2007
    Messages:
    3,856
    Likes Received:
    6,889
    Location:
    Powys
    Very limited use since 2023 as well, so hopefully she can come back with a completely new ticket.
     
  7. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    9,564
    Likes Received:
    6,360
    Anyone know how (a) the train and (b) the loco were moved?
     
  8. Rander

    Rander Member

    Joined:
    Feb 24, 2007
    Messages:
    457
    Likes Received:
    232
    Reported that Kirtlebridge - Carlisle was undertaken at 20mph last night with 47746 on the rear propelling. 57314 went on the front at Carlisle.

    47804 en route to Carlisle now to recover 45699.
     
  9. twr12

    twr12 Well-Known Member

    Joined:
    Sep 2, 2007
    Messages:
    1,853
    Likes Received:
    1,092
    The requirements for dual braking of locomotives are set out in BR document:
    MT31 Specification of Brake Equipment for Air Braked & Dual Braked Main Line Locomotives.
    This document was published in 1970 and is still current.

    MT31 specifies in great detail installation and performance requirements. Eg: capacity of main reservoir, material, bore and wall thickness of pipework, distance between pipe clips. Compressor performance, proportionality of air/vacuum relay valve.

    The air brake fitted LMS locos, eg 45407 & 44871; have the same Westinghouse M8 auto air brake valve as your own 35028. And a air/vacuum relay valve to control the vacuum train pipe in proportion to the auto air brake pipe. Control of the steam brakes on loco and tender remaining with the standard LMS vacuum brake valve.
     
    Devonbelle likes this.
  10. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    16,821
    Likes Received:
    20,934
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I knew that but I didn’t know how the braking sequence was set up. I assume there must be some reason why the owners of 6233 and 60103 converted the engine to air braking dispensing with the part of the original design. At least have retained a vacuum ejector to work on heritage lines
     
  11. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    10,225
    Likes Received:
    8,642
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not much different at LSL is it?
    70000 replaced by 71000 and then by 60007
    60007 then replaced by 61306 on the next tour.
    Everyone just seems to be going through one of those cycles.
     
  12. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Joined:
    Sep 12, 2005
    Messages:
    10,858
    Likes Received:
    11,317
    Gender:
    Male
    Location:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    thank you John . having dug out the Jubilee books I'd come to the same conclusion
     
  13. neildimmer

    neildimmer Resident of Nat Pres

    Joined:
    Jun 6, 2008
    Messages:
    10,154
    Likes Received:
    1,636

    seen a report on Railcam 47804 removed 45627 to Upperby yard, then returned to Carnforth solo
     
  14. twr12

    twr12 Well-Known Member

    Joined:
    Sep 2, 2007
    Messages:
    1,853
    Likes Received:
    1,092
    Roland Kennington told me that he had 60103 converted to air brake only to prevent it running on heritage railways, which had then and now; predominantly vacuum only coaches.
    At some point after Kennington’s involvement, a vacuum ejector, air/vacuum relay valve, dual braked distributors, pipework and gauges were added to the loco and tender.
     
    barnsley2857 and Johnb like this.
  15. Chris86

    Chris86 Well-Known Member

    Joined:
    Oct 31, 2011
    Messages:
    2,002
    Likes Received:
    2,923
    Occupation:
    Safety, technical and vehicle trainer
    Location:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whilst a boiler swap wouldn't be possible, is 5593 similar enough that the inside motion & con rod would be interchangeable as a stop gap to enable 5699 to be repaired in a timely manner (assuming there isn't further collateral damage)

    Chris
     
    green five likes this.
  16. Oli15

    Oli15 Member

    Joined:
    Jul 15, 2009
    Messages:
    363
    Likes Received:
    55
    Location:
    Northamptonshire
    I wonder if LSL have returned the favour and let them into their new upperby site after 10A allowed the brit to use their turntable after recent woes / testing??

    With the jube not going back with 804, you can only summarise that road transport might be required to get Galatea back to base for repair. Such a shame for all involved.
     
  17. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    16,821
    Likes Received:
    20,934
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As far as I know they are the same, it looks that way on the drawing
     
    Chris86 likes this.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    29,823
    Likes Received:
    73,837
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm sure it it is too early to speculate, until there has been a detailed examination and assessment of the damage. Replacing a bent motion part is one thing; replacing a damaged middle cylinder something else entirely.

    Tom
     
    Chris86, green five and Johnb like this.
  19. torgormaig

    torgormaig Part of the furniture Friend

    Joined:
    Jul 17, 2007
    Messages:
    5,545
    Likes Received:
    9,737
    WCR have been using the facilities at Upperby for tanking and servicing trains for some weeks now just as LSL have used the facilities at Carnforth when needed.
    I'm sure the depot at Upperby is a far more suitable location the examine and assess the damage to the 5X than a siding next to the live railway at the station.

    Peter
     
  20. torgormaig

    torgormaig Part of the furniture Friend

    Joined:
    Jul 17, 2007
    Messages:
    5,545
    Likes Received:
    9,737
    I dont know what you mean by a photobomb (never heard of such a thing) but I can tell you that we stewards were asked to assist in keeping people back behind the yellow line during the loco change over so that the train crew had a clear and unobstructed line of sight down the platform while performing this task. As far as I was concerned it was a simple and trouble free task met with cooperation and understanding by the bystanders present. Part of the reasoning behind being asked to do this was to reduce the unseemingly shouting across the station by platform staff trying to control the situation. On this occasion I think it worked quite well.

    Peter
     
    Waterbuck and Chris86 like this.

Share This Page