Mid-Hants Boiler Shop: Speedy Progress.

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем 46118, 24 авг 2009.

  1. 73129

    73129 Part of the furniture

    Дата регистрации:
    24 сен 2007
    Сообщения:
    4.547
    Симпатии:
    1.183
    Адрес:
    Winchester
    I took this photo last weekend.
     
  2. 34007

    34007 Part of the furniture

    Дата регистрации:
    16 мар 2007
    Сообщения:
    3.166
    Симпатии:
    2
    Пол:
    Мужской
    Адрес:
    Hampshire
    That is looking really good!! I wonder how long it will take before things start happening in there and the overall look getting messed up? (Meant in the nicest possible way, with bits of metal here and there etc..)
     
  3. 73129

    73129 Part of the furniture

    Дата регистрации:
    24 сен 2007
    Сообщения:
    4.547
    Симпатии:
    1.183
    Адрес:
    Winchester
    Boiler shop containers have already been moved back in to the shop this week. Can't be to long before the next part of the project starts. With cladding of the existing boiler shop.
     
  4. cct man

    cct man Part of the furniture

    Дата регистрации:
    15 янв 2007
    Сообщения:
    3.220
    Симпатии:
    49
    Род занятий:
    CONSTRUCTION
    Адрес:
    LONDON
    Mid-Hants Boiler Shop

    However it will take a little longer to dig out the old concrete floor as this part is much deeper.

    Regards
    Chris
     
  5. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Here's hoping the recladding of the existing boiler shop has been done before the dry spell ends, like tonight!
    Will be a superb facility when completed.
     
  6. 73129

    73129 Part of the furniture

    Дата регистрации:
    24 сен 2007
    Сообщения:
    4.547
    Симпатии:
    1.183
    Адрес:
    Winchester
  7. 34007

    34007 Part of the furniture

    Дата регистрации:
    16 мар 2007
    Сообщения:
    3.166
    Симпатии:
    2
    Пол:
    Мужской
    Адрес:
    Hampshire
    Looking good! be great to see the finished product!!
     
  8. 73129

    73129 Part of the furniture

    Дата регистрации:
    24 сен 2007
    Сообщения:
    4.547
    Симпатии:
    1.183
    Адрес:
    Winchester
    An update on Ropley boiler shop is that both internal roller shutter doors have now been installed and the side wall roller door has also been installed. The cladding from the existing boiler shop has now been completely removed to allow the new cladding to be installed. Work has also started on the extension to the front of the existing boiler shop with the digging of the footings and pouring of concrete in to the footings. Once completed this will put another twenty feet on to the front of the existing boiler shop.
     

Поделиться этой страницей