If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Non - Stop BRISTOLIAN 17/4/2010!

Тема в разделе 'What's Going On', создана пользователем campainr, 7 янв 2010.

  1. david1984

    david1984 Resident of Nat Pres

    Дата регистрации:
    13 сен 2005
    Сообщения:
    12.910
    Симпатии:
    1.387
    Пол:
    Мужской
    Адрес:
    Birmingham
    I've had a text from someone on board saying 1 Hour 48 mins Temple Mead - Paddington, sounds like a belting return run.
     
  2. KentYeti

    KentYeti Guest

    108 minutes for 118.3 miles sounds good!
     
  3. KEYHAMTRAIN

    KEYHAMTRAIN Member

    Дата регистрации:
    6 окт 2005
    Сообщения:
    225
    Симпатии:
    2
    SOME PHOTOS FROM CHIPPENHAM TODAY AT htt://keyhamtrain.fotopic.net
     
  4. gwr4090

    gwr4090 Part of the furniture

    Дата регистрации:
    8 авг 2005
    Сообщения:
    2.847
    Симпатии:
    222
    Пол:
    Мужской
    Род занятий:
    Scientist (Rtd)
    Адрес:
    Dorset
    wow what a trip ! 118 miles Bristol Temple Meads to Padd booked 154 mins actual 109 mins 16secs arrived 44 mins early, main line all the way, non stop, not a single signal check (after Bristol Parkway).
     
  5. free2grice

    free2grice Part of the furniture Friend

    Дата регистрации:
    19 сен 2005
    Сообщения:
    5.625
    Симпатии:
    3.615
    Пол:
    Мужской
    Род занятий:
    Retired Rolls-Royce engineer
    Адрес:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have read somewhere that The Earl once achieved 98 mph on the up Bristolian. It sounds as if they've tried to better that this evening .
    What a marvellous spectacle the train made today. Well done to the Tyseley folk and to First Great Western. <BJ>
     
  6. Steve from GWR

    Steve from GWR Well-Known Member

    Дата регистрации:
    18 фев 2010
    Сообщения:
    1.292
    Симпатии:
    14
    Well done to FGW, Network Rail, Vintage Trains, everyone involved. What a great way to really kick off GWR175. What a lot of effort must have gone in to making it happen. The water carrier, the clear path for the up train, everything. Fantastic stuff.
     
  7. kelal

    kelal New Member

    Дата регистрации:
    26 окт 2005
    Сообщения:
    60
    Симпатии:
    0
    Brilliant! Just brilliant! A huge thank you to all concerned for making this happen.
     
  8. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Дата регистрации:
    11 сен 2005
    Сообщения:
    36.449
    Симпатии:
    9.908
    Пол:
    Мужской
    Род занятий:
    Retired-ish, Part time rail tour steward.
    Адрес:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just goes to show what can be done if everybody works together, congratulations to all concerned, sounds like it was a great run.
    How about a non stop Caledonian, Euston to Carlisle, 6233 or 6201 with just the borrowed water carrier and 8 on like it was.
     
  9. 05micfis

    05micfis Member

    Дата регистрации:
    3 апр 2009
    Сообщения:
    226
    Симпатии:
    0
    5043 has put up an amazing achievement today, definately shows what can be done. It should definately be repeated on the WCML with 6233 or 6201 at the helm!!
     
  10. hatherton hall

    hatherton hall Well-Known Member

    Дата регистрации:
    27 май 2007
    Сообщения:
    1.068
    Симпатии:
    351
    I find this quite astounding. Absolutely unbelieable. 108 minutes from Bristol to Paddington - only 3 minutes longer than the steam hauled Bristolian of the 50's when speeds in the 80's and 90's were necessary to keep to the schedule.

    I am sure I will wake up in a minute and it has all been a dream.......................!

    Brilliant and Beautiful.

    Does anyone know if Mike Notley was on board? Even at this early point in 2010, I find it hard to imagine any other train will win Mike's "Railtour of the Year".

    A massive pat on the back for everyone involved including NR and FGW but most of all, the Tyseley boys for providing a magnificent spectacle in the form of 5043!
     
  11. Paul42

    Paul42 Part of the furniture

    Дата регистрации:
    17 июл 2006
    Сообщения:
    6.096
    Симпатии:
    4.484
    Пол:
    Мужской
    Адрес:
    East Grinstead
    It was a superb run, thanks to FGW, Vintage Trains, West Coast, and Network Rail.
     
  12. spindizzy

    spindizzy Member

    Дата регистрации:
    21 май 2009
    Сообщения:
    899
    Симпатии:
    44
    Bittern is going to have a crack at York-Kings Cross in September, looks like strings are being pulled on that trip too

    Sounds a cracking run today, there's nowt like being on the fast overtaking standard timetabled trains on a steam hauled special.
     
  13. D1059

    D1059 Member

    Дата регистрации:
    25 сен 2008
    Сообщения:
    426
    Симпатии:
    320
    Well done to all involved - when we heard that the train might run a bit early I don't think anyone was expecting it to be 20 mins up on schedule by Cholsey.

    STEVE
     
  14. Matt35027

    Matt35027 Well-Known Member

    Дата регистрации:
    16 окт 2009
    Сообщения:
    1.122
    Симпатии:
    143
    Пол:
    Мужской
    Род занятий:
    Builder
    Адрес:
    Near 74D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Massive well done to every one who made this tour happen. Only 3 minutes longer than the 50s Bristolian is an amazing achievement.
     
  15. No.7

    No.7 Well-Known Member

    Дата регистрации:
    7 сен 2005
    Сообщения:
    1.632
    Симпатии:
    122
    Well what a day. Vintage Trains team were excellent, FGW pulled out all the stops, stewards were wonderful, WCRC did their bit. Only small down is I feel very very sorry for those on the down journey. Fortunately I had raided the piggy bank and was on both runs.

    The return trip was superb. Yes Mike Notley was on the train. Two stop watches in our house got 1 hour 49min 58 sec. That’s an average of 64.2 mph over 117.64 miles.
    We retained the Fast Line all the way. Yes ALL the way, no trundling along between Challow and Wantage, no problem with all the restrictions on the slow beyond Reading, 75 mph all the way.

    My highlight of the run was racing through Slough at 77 mph passing a HST running on the slow line. Many very bemused passanges staring at our progress on the station. Congratulation to Ray Poole, Alistair Meanley and Andy Taylor for a true credit to the memory of the GWR.

    I would close betting on this years ‘Mikes’ now.

    Thanks to all involved
     
  16. Phil K

    Phil K Member

    Дата регистрации:
    8 сен 2005
    Сообщения:
    614
    Симпатии:
    77
    Адрес:
    Ewell, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just got home from this. in a state of shock to be honest. We were expecting to be looped somewhere and it didn't happen. we overtook a HST at Reading, but it transpired that train was late due to a technical fault (due into Pad at 1814 and we passed it at Reading at about that time), but it meant our run was unimpeded.

    Dad says it was the best main line run we have ever done - I think it must be , the timings mentioned are what we were told when we got off on the platform! Also we were told Mike Notley was on the train too. My pics from today.

    [​IMG]
    [​IMG]
    [​IMG]
     
  17. Devonbelle

    Devonbelle New Member

    Дата регистрации:
    1 сен 2007
    Сообщения:
    128
    Симпатии:
    163
    Пол:
    Мужской
    Род занятий:
    Railwayman
    Адрес:
    Buggleskelly!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was a cracking return run. The HST to which people referred (on the relief/slow line) was 1A25 which had experienced brake difficulties at Reading, this helped create a situation whereby the return special could go Main Line from Reading rather than Relief line.

    No.7 mentions excellent work by FGW, West Coast and Tyseley, but overlooked (not intentionally I am sure) the NR people in control and the signal boxes on route. As the run unfolded, people started looking how the train could best be pathed to give a non stop run and find a platform at Padd for a 46 early arrival! The 18.51 arrival at Padd says it all. Quite a day. As Steve says, well done to all involved.
     
  18. spindizzy

    spindizzy Member

    Дата регистрации:
    21 май 2009
    Сообщения:
    899
    Симпатии:
    44
    Just had a look back through my old times. Bittern's 1st run with its second tender in July last year managed 109 miles from York to just outside Peterborough in 96minutes yet this run didn't even get a mention in the press. Oh and that trip was steam both ways and only £74!
     
  19. No.7

    No.7 Well-Known Member

    Дата регистрации:
    7 сен 2005
    Сообщения:
    1.632
    Симпатии:
    122
    Indeed, rightly thanks are very much due in that area, I understand people from NR were on the train to help us get the best path. We understood the aim of trying to go under 2 hours was pre-planned if we could get ahead of X-country at Didcot, which we achieved -just what we were told by the Stewards.
     
  20. Steve from GWR

    Steve from GWR Well-Known Member

    Дата регистрации:
    18 фев 2010
    Сообщения:
    1.292
    Симпатии:
    14
    Well I guess the main publicity aspects of this trip, and the things that distinguish it from Bittern's trip, were
    - making it non-stop for the whole journey
    - resurrecting a famous name for the train
    - getting FGW's buy-in and then more their enthusiasm for it
    - tying it into the 175th
    and possibly an extra one
    - being on God's Wonderful Railway anyway

    It all combined to make it more than "just" another steam mainline tour.
     

Поделиться этой страницей