    No it's not the only reason, it's an insurance to avoid swinging penalties from NR. Example, recently there was a delay of less than 10 minutes on one steam hauled charter. NR then calculated the knock on effect and came up with 99 minutes which at over £30 a minute comes to over £3,200. Now in this case I believe that the original delay was in fact due to a signal fault, but NR had ignored this in an attempt to get someone else to pay the delayed operators their delay costs.
    So you are an operator, do you risk this fine for causing a delay when the timings don't leave any leeway, or do you stick an insurance on the back? which then enables easier shunting moves as well.
     
  2. dp266

    dp266 Member Account Suspended

    Joined:
    Oct 21, 2008
    Messages:
    374
    Likes Received:
    0
    Occupation:
    Project Management
    Location:
    County Palatine of Lancaster
    You deliver what you are contracted to do... you have sold a steam hauled tour. As a Project Manager I would ensure all risks have been properly assesed so it would be the right loco with the right load at the right time of year with the right paths. Thats the point of this tour, it was with a different loco than planned. Assistance was required because the laod was too great.
     
  3. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Joined:
    May 30, 2009
    Messages:
    21,176
    Likes Received:
    21,007
    Location:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sadly what seems to cause the problem is when it is wrongly assumed all steam locomotives are the same, can do similar things and handle similar loads over any route. That's never been the case. The moment you move to Plan B (C or D!) be it the route or the locomotive, you may be heading for trouble. Surely 7/10/10 was just a good example of this.Take it to a logical conclusion and you may get someone trying to substitute a Class 5 for a Class 8....or hasn't that happened already?!
    (This thread could go on forever. Perhaps an administrator should close it?)
     
  4. dp266

    dp266 Member Account Suspended

    Joined:
    Oct 21, 2008
    Messages:
    374
    Likes Received:
    0
    Occupation:
    Project Management
    Location:
    County Palatine of Lancaster
    As I said in a previous post, I can accept that a less powerfull loco was used as a substitute at very late notice and something had to be done. It is to the operators and oweners credit that 60019 was made available. However, it should have been made clear to the paying passengers that assitance was needed for just that reason. That does not detract from the flawed policy on other tours of sticking a box on the back just in case. If that was sensible virtually every train on the mainline should have a box there just in case!
     
  5. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Joined:
    Sep 11, 2005
    Messages:
    35,528
    Likes Received:
    9,200
    Gender:
    Male
    Occupation:
    Retired-ish, Part time rail tour steward.
    Location:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This thread seems to have been going in circles for some time now, so a decision has been made that it has run its useful life and will be closed.
     