If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bluebell track laying South from EG?

Discussie in 'Heritage Railways & Centres in the UK' gestart door 45141, 5 okt 2009.

  1. RichardSalmon

    RichardSalmon Member

    Lid geworden:
    27 mrt 2006
    Berichten:
    200
    Leuk Bevonden:
    350
    Geslacht:
    Man
    Beroep:
    Engineer
    Locatie:
    75B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The reason we cannot use larger wagons for the Waste by Rail trains is that there are load limits on the line (particularly some of the viaducts, I think). We had to do a lot of work behind the scenes to even be allowed to run a limited number of class-66 plus 1000 ton payload trains, since they would not routinely be allowed on the EG line.
     
  2. pmh_74

    pmh_74 Part of the furniture

    Lid geworden:
    28 jan 2009
    Berichten:
    2.423
    Leuk Bevonden:
    1.707
    What confuses me is this suggestion of removing enough material for a single-line cutting. Surely running alongside a big pile of partially exposed rubbish, which could easily slip back down into the cutting, is never going to be allowed?
     
  3. Christopher125

    Christopher125 Part of the furniture

    Lid geworden:
    30 nov 2005
    Berichten:
    2.846
    Leuk Bevonden:
    581
    Locatie:
    Isle of Wight
    It seems unlikely doesnt it? At least the lack of shunting would make removal more efficent if the worst happened and it all had to go. Im sure its all in hand though.

    Anyway, good news on progress now up on the Bluebell website - Report on the completed "Waste by Rail 3" operation

    Chris
     
  4. philw2

    philw2 Member

    Lid geworden:
    30 apr 2011
    Berichten:
    494
    Leuk Bevonden:
    86
    Richard,

    What is the bulkage factor of the waste? Have you tried to ascertain it by filling a wagon and compacting it in layers before weighing it?

    Just interested..
     
  5. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When doing calcs for ballast train estimates in the 90s for BR or that bit of the former BR I used to work for.
    We used 1.2 as the bulking factor I seem to remember for loading spoil material into trains.
     
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.798
    Leuk Bevonden:
    64.475
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not a civil engineer, so forgive me if I have missed the point. But why is bulking factor important? The trains are limited by weight. Even if the waste could be made denser (e.g more compact) we'd still be limited to a maximum load of 1000 tons. The current wagons are big enough to take 50 tons per wagon, so bigger capacity wagons or more compacted waste wouldn't actually help.

    Tom
     
  7. philw2

    philw2 Member

    Lid geworden:
    30 apr 2011
    Berichten:
    494
    Leuk Bevonden:
    86
    James,

    The waste to be removed can be accurately quantified in volume but to determine the number of trains, and hence the cost, one must know the weight of the undisturbed waste. This can only be ascertained by knowing the loose density, easily calculated, and the undisturbed density. The ratio of each gives the bulkage factor.
    The only way to try to emulate the waste weight undisturbed is to compact a wagonload with a roller or compactor, in layers, weigh it, and compare it to the loose weight.
     
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.798
    Leuk Bevonden:
    64.475
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah, OK, I get you - you mean to properly quantify the weight of the tip remaining undisturbed in the ground.

    I haven't heard of a factor; however, the estimated number of trains required hasn't AFAIK changed significantly since the first Waste by Rail pilot (except for the change in plan from total to partial removal, which was driven by financial considerations, not a sudden change in the estimated weight in the tip). So I'd imagine that the project has a figure they are using for the purposes of making estimates.

    The generally quoted weight was about 115,000 tons, of which about 46,000 tons has gone and around 69,000 tons remain. During the next phase, which starts August 15th, we will get pretty close to half the tip removed.

    Amounts removed; 10,386 tons in the initial lorry dig in 2008
    WBR 1 - July 2010 - 5 days, ca 4,000 tons (I can't find an exact figure)
    WBR 2 - March 2011 - 19 days, 16,837 tons
    WBR 3 - July 2011 - 15 days, 14,657 tons

    Tom (not James...)
     
  9. Zoomeg

    Zoomeg New Member

    Lid geworden:
    3 sep 2010
    Berichten:
    143
    Leuk Bevonden:
    29
    well I had a look from the field yesterday morning and if that's just 69k tons left even in a single line cutting I'm a Dutchman, but like the hated Mr Philpot I'm keen to be proved wrong
     
  10. kesr

    kesr Member

    Lid geworden:
    26 mrt 2007
    Berichten:
    237
    Leuk Bevonden:
    0
    Geslacht:
    Man
    Beroep:
    Owner
    Locatie:
    deal
    Can anyone tell me where any photos or even footage of the works is laying around
     
  11. Christopher125

    Christopher125 Part of the furniture

    Lid geworden:
    30 nov 2005
    Berichten:
    2.846
    Leuk Bevonden:
    581
    Locatie:
    Isle of Wight
    I posted a link to a progress report higher up which has photo's from the tip itself, and explanations for various issues which people have dragged up.

    Chris
     
  12. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.455
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
  13. kesr

    kesr Member

    Lid geworden:
    26 mrt 2007
    Berichten:
    237
    Leuk Bevonden:
    0
    Geslacht:
    Man
    Beroep:
    Owner
    Locatie:
    deal
    Many thanks for that
     
  14. domeyhead

    domeyhead Member

    Lid geworden:
    16 mei 2007
    Berichten:
    399
    Leuk Bevonden:
    166
    There seem to be one or two people here with good knowledge of the project - why is capping material leaving the site by road (the cost per load of which willl be considerable) - rather than being moved to the south end of the site for disposal by rail to the Ardingly triangle or even to other areas where it could be levelled and landscaped (eg Kingscote)? If there were (say) 10-20k tonnes of capping still on site the cost of relocating it elsewhere on Bluebell land as groundwork rather than by road as a commercial operation must be cost beneficial to the railway - and if the capping spoil trains were coincided to run on in-steam days there would be an added attraction for the enthusiast-visitor. I know this will have been costed of by the project team - I don't regard them as fools unlike some on this thread - but I am interested in the economics of this decision.
     
  15. Paul42

    Paul42 Part of the furniture

    Lid geworden:
    17 jul 2006
    Berichten:
    6.096
    Leuk Bevonden:
    4.484
    Geslacht:
    Man
    Locatie:
    East Grinstead
    From a Richard Salmon post "The trucks taking away clay capping/soil cost us nothing. We actually, I gather, have been making a very small amount of profit on the material shipped out by road."
     
  16. steamdream

    steamdream Member

    Lid geworden:
    5 mei 2011
    Berichten:
    285
    Leuk Bevonden:
    15
    Beroep:
    Teacher
    Locatie:
    Avranches(france)
    How is it possible to make a profit with a merry go round of trucks:suspicious:??where is going this capping clay??
    regards
    noel
     
  17. philw2

    philw2 Member

    Lid geworden:
    30 apr 2011
    Berichten:
    494
    Leuk Bevonden:
    86
    Possibly some contractor somewhere wants it for a filling job and sends his lorries to get it. The blubell may have to fill them though - at their expense.
     
  18. steamdream

    steamdream Member

    Lid geworden:
    5 mei 2011
    Berichten:
    285
    Leuk Bevonden:
    15
    Beroep:
    Teacher
    Locatie:
    Avranches(france)
    Wouldn't it be better to finish the packing of the Ardingly triangle or(and) fill the embankment ??
    regards
    noel
     
  19. martin butler

    martin butler Part of the furniture

    Lid geworden:
    16 jun 2008
    Berichten:
    3.440
    Leuk Bevonden:
    388
    if the bluebelle are making money from selling the capping then isnt that a good thing? anything that helps to pay to get the tip cleared has got to be a good move i would think , also i understand that from the blog that there is a bit of land that once the tip has been cleared that would be of no railway use, might the railway be able to sell land to enable someone to build a couple of executive houses on the land? to raise even more money?
     
  20. Zoomeg

    Zoomeg New Member

    Lid geworden:
    3 sep 2010
    Berichten:
    143
    Leuk Bevonden:
    29
    it's hardly a very salubrious area with a new household waste facility being built right next door (presumably the very same facility that commited the disgusting act of landfilling the tip in the first place) but yes brownfield development land is always required for affordable housing in the area,
     

Deel Deze Pagina