If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Industrial Loco Updates

Rasprava u 'Steam Traction' pokrenuta od AlistairS, 17. Travanj 2008..

  1. Hunslet2411

    Hunslet2411 New Member

    Pridružen(a):
    29. Studeni 2009.
    Poruka:
    53
    Lajkova:
    0
    Interesi:
    Propulsion/Airframe Technician RAF
    Grad:
    RAF Marham
    Sir Thomas Royden at Hunsbury Hill yesterday ready for the days Santa trains operation. Ironing out 1-2 issues with her but working very well. We still have to getthe mounts for name/works plates on and some cab windows!
     

    Privici:

  2. sleepermonster

    sleepermonster Member

    Pridružen(a):
    19. Lipanj 2007.
    Poruka:
    953
    Lajkova:
    1,094
    Vulcan Update

    The lift has taken place and the wheels are out.

    Tim
     
  3. Leon

    Leon New Member

    Pridružen(a):
    3. Prosinac 2011.
    Poruka:
    5
    Lajkova:
    0
    Post removed
     
  4. Leon

    Leon New Member

    Pridružen(a):
    3. Prosinac 2011.
    Poruka:
    5
    Lajkova:
    0
    Post remved
     
  5. Leon

    Leon New Member

    Pridružen(a):
    3. Prosinac 2011.
    Poruka:
    5
    Lajkova:
    0
    Saw RSH 0-4-0st Birkenhead at Marsh Mills, Plym Valley today.Anyone know if its on loan/hire or been sold.
     
  6. 32110

    32110 Member

    Pridružen(a):
    20. Svibanj 2006.
    Poruka:
    649
    Lajkova:
    794
    Spol:
    Muškarac
    Interesi:
    Retired from full time paid work
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Birkenhead is to have contract work performed but not by Plym Valley Railway.
     
  7. FJR8642

    FJR8642 Member

    Pridružen(a):
    9. Srpanj 2010.
    Poruka:
    450
    Lajkova:
    398
    Spol:
    Muškarac
    Grad:
    Stoke On Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  8. Glenalmond

    Glenalmond Member

    Pridružen(a):
    20. Lipanj 2006.
    Poruka:
    574
    Lajkova:
    72
     
  9. ConsolidationMike

    ConsolidationMike New Member

    Pridružen(a):
    2. Rujan 2011.
    Poruka:
    4
    Lajkova:
    0
    RSH No 7761 S&L No63, "Corby" returned to service on the 24th Dec on the GCRN following the completion of extensive firebox repairs.

    Mike
     
  10. twouglies

    twouglies New Member

    Pridružen(a):
    6. Rujan 2008.
    Poruka:
    11
    Lajkova:
    0
    Grad:
    Kent
    Great news - didn't realise that you were so close.

    Having completed the first year and about 1000 miles with 62 I know that you are going to enjoy 63 !

    Any pics that you can point us to ?


    Andy
     
  11. Leon

    Leon New Member

    Pridružen(a):
    3. Prosinac 2011.
    Poruka:
    5
    Lajkova:
    0
    P1040281.JPG P1040280.JPG Recent arrivals at The Plym Valley Railway,RHS 0-4-0st Birkenhead and Andrew Barclay 0-4-0st "705"
     
  12. boilerwelderteifel

    boilerwelderteifel New Member

    Pridružen(a):
    3. Siječanj 2012.
    Poruka:
    2
    Lajkova:
    0
    Interesi:
    boiler maker
    i will be (TEIFEL STEAM ENG) replaceing crown stays on birkenhead aswell as 18 copper patch screws in the firebox seams due to rivet wastage within the next few months when im not finishing off the boiler overhaul of GWR 9682, it will then return to service be availible for hire and GWR 9682 will return to chinnor MID season
     
  13. sleepermonster

    sleepermonster Member

    Pridružen(a):
    19. Lipanj 2007.
    Poruka:
    953
    Lajkova:
    1,094
    "Vulcan".

    The first working party of 2012 took place on Sunday 15th January despite some very cold weather. The loco has been craned off its wheels and the frames and boiler are at the back of Barrow Hill Shed. The wheels are inside and have had their journals checked with a micrometer, these will need machining. The wheels and cab are being scraped clean and painted.

    Tim
     
  14. Respite

    Respite Member

    Pridružen(a):
    6. Studeni 2009.
    Poruka:
    447
    Lajkova:
    143
    Spol:
    Muškarac
    Interesi:
    Retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That exposed dome on the Barclay at Plym Valley needs covering up otherwise rain will get into the lagging corroding the boiler barrel.
     
  15. Avonside1563

    Avonside1563 Well-Known Member

    Pridružen(a):
    13. Srpanj 2007.
    Poruka:
    1,141
    Lajkova:
    244
    Spol:
    Muškarac
    Grad:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Avonside 1563 has seen some progress in recent weeks at Foxfield. The wheels having had been away for tyre turning have been reunited with overhauled axleboxes and refurbished springs and the frames are now sitting on the wheels and mobile (with the aid of a pinch bar at present!).
    The boiler is another matter as the firebox has been removed and looks like a giant cheese grater, definitely a case for a new one! Ah well, rust never sleeps!
     

    Privici:

  16. sleepermonster

    sleepermonster Member

    Pridružen(a):
    19. Lipanj 2007.
    Poruka:
    953
    Lajkova:
    1,094
    Bagnall No. 2746 "The Duke" at Wirksworth has had its cab roof and saddle tank removed, we hope to make a serious start once the weather clears.

    Tim
     
  17. GWR5786

    GWR5786 New Member

    Pridružen(a):
    17. Travanj 2009.
    Poruka:
    44
    Lajkova:
    0
    Any updates on the corby 0-6-0 saddle tank locos Dolobran at the GCR N and Colwyn ant the Northampton & Lamport. Both must be close to finishing soon?
     
  18. 53807

    53807 New Member

    Pridružen(a):
    6. Prosinac 2011.
    Poruka:
    30
    Lajkova:
    18
    Any news on Bagnall 2996 Victor.
     
  19. ConsolidationMike

    ConsolidationMike New Member

    Pridružen(a):
    2. Rujan 2011.
    Poruka:
    4
    Lajkova:
    0
    Heavy General Overhaul on Manning Wardle 1762 "Dolobran" is proceeding steadily with work being completed to a very high standard. No date for completion as many problems have been discovered during the course of the overhaul that have required additional work to rectify, such as the mis alignment of the replacement cylinder block installed at Corby, which has been re aligned during the course of the overhaul.

    Heavy General Overhaul on Manning wardle 2009 "Rhyl" also proceeding but not so advanced as 1762. New footplating and valance angles fitted following repairs to the rear of the frame, new fabricated bunker and original repaired cab now assembled on the frame. Work on frame piping for braking systems and steam heat, and on overhaul of hornblocks, next priority.
     
  20. sleepermonster

    sleepermonster Member

    Pridružen(a):
    19. Lipanj 2007.
    Poruka:
    953
    Lajkova:
    1,094
    Next Vulcan working party: 19th Feb at Barrow Hill.

    Sounds like the Manning Wardle Fundamentalists are in overdrive, I must try and call in soon.

    Tim
     

Podijelite ovu stranicu