  1. Tim Cowen

    Tim Cowen Member

    Pridružen(a):
    27. Listopad 2006.
    Poruka:
    632
    Lajkova:
    60
    Spol:
    Muškarac
    Grad:
    County of Stafford
    Are MCR getting contractors in to do this work, or are the CVR volunteers doing it?
     
  2. rogdodge52

    rogdodge52 New Member

    Pridružen(a):
    10. Travanj 2012.
    Poruka:
    28
    Lajkova:
    15
    Spol:
    Muškarac
    contractors.. 3 miles of track is a bit too much for p/wayman and his apprentice
     
  3. TommyD

    TommyD New Member

    Pridružen(a):
    7. Ožujak 2012.
    Poruka:
    17
    Lajkova:
    20
    Spol:
    Muškarac
    Does this mean they're relaying all the track right back to Stoke? I can't see the point otherwise.
     
  4. Corbs

    Corbs Well-Known Member

    Pridružen(a):
    17. Srpanj 2008.
    Poruka:
    1,719
    Lajkova:
    763
    Surely the approach is to tackle that which needs attention most first, then replace the next most worn out, then the next, and so on and so forth.

    I'm sure that in the fullness of time the whole line will be relaid, but presumably what they need to do now is fix it to first allow revenue-earning trains to run, then once a turnover is established, carry out the rest of the maintenance.
     
  5. Paulman265

    Paulman265 New Member

    Pridružen(a):
    16. Veljača 2011.
    Poruka:
    11
    Lajkova:
    5
     
  6. Paulman265

    Paulman265 New Member

    Pridružen(a):
    16. Veljača 2011.
    Poruka:
    11
    Lajkova:
    5
    I would have thought the most pressing issue would be to try and fight through the tree infested undergrowth/landslip between Endon and Stoke or revenue earning freight trains are going nowhere near Cauldon, brand new track on that section or not.
     
    paulhitch se sviđa ovo.
  7. nigelss

    nigelss Member

    Pridružen(a):
    20. Kolovoz 2007.
    Poruka:
    269
    Lajkova:
    166
    Spol:
    Muškarac
    Grad:
    Essex
    The message on the CVR website said, "There will also shortly be some interesting new announcements to be made by MCR about the development of their network so please look out for these over the next few weeks." We'll have to wait and see what they are. Might be time to start cooking the humble pie and dishing out the cutlery!
     
  8. Paulman265

    Paulman265 New Member

    Pridružen(a):
    16. Veljača 2011.
    Poruka:
    11
    Lajkova:
    5
    Really hope so. I have been a local enthusiast for over 40 years and have lived close to the line. Would be fantastic to see it reopened again but looking at the condition of the Endon to Stoke stretch it will take some serious money to get into a fit state suitable for freight companies to allow their expensive kit over it. I wonder have contracts been signed with Lafarge in order for MCR to approach the bank for the necessary funding........
     
  9. NeilL

    NeilL Well-Known Member

    Pridružen(a):
    30. Ožujak 2012.
    Poruka:
    2,048
    Lajkova:
    1,552
    Interesi:
    Retired & OAPWay & tree feller
    Grad:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looking forward to seeing the work starting. With the limited access to the Cauldon line by road does it look like it will be rail mounted equipment working the line westwards and new track brought in by rail or will we have everything brought in by rail?
     
  10. ADB968008

    ADB968008 Guest

    Thread locked, for discussion.

    It will return shortly.

    (Apologies... It's Friday night... We have other things going on).
     
  11. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Pridružen(a):
    11. Rujan 2005.
    Poruka:
    36,568
    Lajkova:
    9,984
    Spol:
    Muškarac
    Interesi:
    Retired-ish, Part time rail tour steward.
    Grad:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now back up with a 'couple' of posts removed.:rolleyes:. Sorry if there are one or two that did not need to go and have been chopped, but since over 70 have been removed some may have got snipped when they did not really need it.
    Lets get back to the normal discussion and info on the CVR/MCR.
     
    rogdodge52 se sviđa ovo.
  12. p/wayman

    p/wayman Member

    Pridružen(a):
    29. Studeni 2005.
    Poruka:
    573
    Lajkova:
    168
    Spol:
    Muškarac
    Interesi:
    voulunteer on pway
    Grad:
    newcastle-u-lyme
    Thank goodness for that Ralph
     
    rogdodge52 and (deleted user) like this.
  13. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for sorting this Mods.
     
    rogdodge52 and (deleted user) like this.
  14. rogdodge52

    rogdodge52 New Member

    Pridružen(a):
    10. Travanj 2012.
    Poruka:
    28
    Lajkova:
    15
    Spol:
    Muškarac
    thank you Mods too for all your help
     
  15. p/wayman

    p/wayman Member

    Pridružen(a):
    29. Studeni 2005.
    Poruka:
    573
    Lajkova:
    168
    Spol:
    Muškarac
    Interesi:
    voulunteer on pway
    Grad:
    newcastle-u-lyme
    Just a reminder that there will be trains running up the Cauldon line this weekend. The engine will be the N7 with a class 33 on the tail. It will be going as far as Bridge 39/1 which is where the branch line to Waterhouses ran and will be restored at a point of time in the future. There will not be many more running this far up the line as work is to start this week on installing a loop at Ipstones this week, so make the most of what we have got now. We are looking forward to seeing more developements in the near future and more joint projects to keep the Pway busy.
     
    rogdodge52 and Sheff like this.
  16. nigelss

    nigelss Member

    Pridružen(a):
    20. Kolovoz 2007.
    Poruka:
    269
    Lajkova:
    166
    Spol:
    Muškarac
    Grad:
    Essex
    How far up the branch is Ipstones?
     
  17. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  18. nigelss

    nigelss Member

    Pridružen(a):
    20. Kolovoz 2007.
    Poruka:
    269
    Lajkova:
    166
    Spol:
    Muškarac
    Grad:
    Essex
    Thanks for that. It will be interesting to see how MCR go about replacing the railway to Cauldon. Presumably it will be relaid with the possibility of an extension to Waterhouses in mind. (?)
     
  19. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Correct. See the CVR website announcement for that.
     
  20. NeilL

    NeilL Well-Known Member

    Pridružen(a):
    30. Ožujak 2012.
    Poruka:
    2,048
    Lajkova:
    1,552
    Interesi:
    Retired & OAPWay & tree feller
    Grad:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A thoroughly wet day today with line walks on the Cauldon Branch before this weekends operations and work at Cauldon Low and Ipstones in preparation for the installation of a loop at Ipstones. Pictures below from Ipstones
    DSCF2102a.jpg DSCF2103a.jpg DSCF2104a.jpg DSCF2105a.jpg
     
    rogdodge52 and TommyD like this.

Podijelite ovu stranicu