If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von The Black Hat gestartet, 13 Februar 2011.

  1. Chris86

    Chris86 Well-Known Member

    Registriert seit:
    31 Oktober 2011
    Beiträge:
    1.577
    Zustimmungen:
    1.786
    Beruf:
    Safety, technical and vehicle trainer
    Ort:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any word on how 44806 is settling in?

    Chris
     
  2. Bean-counter

    Bean-counter Part of the furniture

    Registriert seit:
    21 Juli 2007
    Beiträge:
    5.844
    Zustimmungen:
    7.688
    Geschlecht:
    männlich
    Ort:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A few niggles now and then but running regularly. Some work done since delivery before the start of the season. Over 3,000 miles by the end May - will be quite a bit more now.

    Steven
     
    Chris86 und 47406 gefällt dies.
  3. 61624

    61624 Part of the furniture

    Registriert seit:
    27 September 2006
    Beiträge:
    5.294
    Zustimmungen:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yet again people feel the need to knock photographers so let's see your "imaginative" stuff then.

    I don't take photos, other than as record shots. I have no aspirations to take imaginative stuff, so I don't waste time trying to do so.
     
  4. Spamcan81

    Spamcan81 Nat Pres stalwart

    Registriert seit:
    25 August 2007
    Beiträge:
    35.836
    Zustimmungen:
    22.273
    Beruf:
    Training moles
    Ort:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So why knock the efforts of others?
     
    michaelh gefällt dies.
  5. Paul42

    Paul42 Part of the furniture

    Registriert seit:
    17 Juli 2006
    Beiträge:
    6.096
    Zustimmungen:
    4.484
    Geschlecht:
    männlich
    Ort:
    East Grinstead
    10:00am off Pickering today B1 + 3 Teaks.
     
  6. Paul42

    Paul42 Part of the furniture

    Registriert seit:
    17 Juli 2006
    Beiträge:
    6.096
    Zustimmungen:
    4.484
    Geschlecht:
    männlich
    Ort:
    East Grinstead
    I had an enjoyable visit on Wednesday. The 9.00am from Pickering was diesel hauled, while as stated above 10.00am was the B1 plus 3 teaks. The 12.30 from Grosmont and 14:00 from Pickering listed in the timetable as diesel hauled were actually hauled by the B1 and 6 teaks.I saw the Q6 at Newbridge but no sign of 29. Pickering Station looked very smart with a volunteer gang touching up the paintwork and the roof does look impressive ( it wasn't there last time I visted and I remembered
    sponsoring 2 slates). A collection of photos from my visit including some showing how the new platform is progressing at Whitby can be fould at http://paulsimpson.zenfolio.com/p611826612
     
  7. 61624

    61624 Part of the furniture

    Registriert seit:
    27 September 2006
    Beiträge:
    5.294
    Zustimmungen:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The B1 is a super engine and absolutely right for the NYMR in all regards. I hope it stays on when the 5-year agreement is up. It ought to, it must be doing extremely well on mileage earnings!
     
  8. ghost

    ghost Part of the furniture

    Registriert seit:
    29 Mai 2006
    Beiträge:
    4.304
    Zustimmungen:
    5.727
    Geschlecht:
    männlich
    Ort:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I thought it was working to pay off the finance that the NYMR provided to complete its last overhaul? Therefore no mileage earnings would be payable?

    Could have misread it though!


    Keith
     
  9. 61624

    61624 Part of the furniture

    Registriert seit:
    27 September 2006
    Beiträge:
    5.294
    Zustimmungen:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it paid off its loans in its first year!
     
  10. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    5.969
    Zustimmungen:
    2.761
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    jnc gefällt dies.
  11. D229

    D229 New Member

    Registriert seit:
    8 August 2008
    Beiträge:
    105
    Zustimmungen:
    1
    I have noticed a new gold timetable has been produced to start on August 2nd, as mentioned in a previous post I will be visiting the area in August and would be grateful if somebody could provide me with loco diagrams for the gold timetable as, if I have read correctly, there appeared to be some confusion over the new timetable. Thanks to those who responded previously and in advance to anybody who can help now.
     
  12. Standard 4MT

    Standard 4MT Member

    Registriert seit:
    31 März 2012
    Beiträge:
    318
    Zustimmungen:
    53
    Geschlecht:
    männlich
    Beruf:
    Photographer/IT MCSE/NYMR/ex Police/&Train Manager
    Ort:
    Wales/Scarborough
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Gold timetable that started yesterday will be altered from when Whitby opens Platform 2, hopefully August 2nd.
    Keep an eye on NYMR website.
    There is no Loco Diagrams available yet I'm afraid, for new Gold timetable.
    Watch this space as they say.
     
    47406 gefällt dies.
  13. 47406

    47406 Well-Known Member

    Registriert seit:
    24 Oktober 2006
    Beiträge:
    1.287
    Zustimmungen:
    145
    Geschlecht:
    männlich
    Beruf:
    Operations Manager
    Ort:
    County Durham
    http://www.nymr.co.uk/timetables-and-fares/timetable/

    Work to create a second platform at Whitby is nearing completion. This will enable NYMR to run more trains in and out of Whitby as shown in Timetable B below which is due to apply from Saturday 09 August 2014. Passengers are advised to check closer to the beginning of August in case of any last minute unexpected delay.
     
  14. Standard 4MT

    Standard 4MT Member

    Registriert seit:
    31 März 2012
    Beiträge:
    318
    Zustimmungen:
    53
    Geschlecht:
    männlich
    Beruf:
    Photographer/IT MCSE/NYMR/ex Police/&Train Manager
    Ort:
    Wales/Scarborough
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Yes a great shame couldn't start on 2nd August as planned. Unforeseen things. Signalling transformer causing over run, hope it is just the week delay, as nearly everything has passed now ready for action.
     
  15. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    5.969
    Zustimmungen:
    2.761
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would like to say hopefully that the commissioning would be next week but at a guess and this is purely a personal view.
    The redate could be 6 months or more away. I hope not though.
    This is due to the high demand around the country for suitably qualified staff who can sign the vital bit of paper.
    This sort of event can also occur on NWR resignalling schemes and has done, numerous times in the past.
     
  16. Standard 4MT

    Standard 4MT Member

    Registriert seit:
    31 März 2012
    Beiträge:
    318
    Zustimmungen:
    53
    Geschlecht:
    männlich
    Beruf:
    Photographer/IT MCSE/NYMR/ex Police/&Train Manager
    Ort:
    Wales/Scarborough
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just hoping that maybe special arrangements can be taken to get this passed once repaired.
    I know getting people back can be a pain with the Network Signalling Diary, perhaps be fitted in with local signal works at Scarborough or elsewhere.
    After all the work and planning hoping is just a week ten day max delay.
    Signing off just that shouldn't take to much time. Keeping fingers crossed.
     
  17. Ploughman

    Ploughman Part of the furniture

    Registriert seit:
    1 April 2008
    Beiträge:
    5.969
    Zustimmungen:
    2.761
    Beruf:
    Ex a lot of things.
    Ort:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  18. bharrison

    bharrison New Member

    Registriert seit:
    19 April 2010
    Beiträge:
    24
    Zustimmungen:
    0
    Geschlecht:
    männlich
    Ort:
    Somewhere on the old LNER network north of York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does anyone know what caused northern to run an hour late yesterday causing delays to all nymr services.
     
  19. Bean-counter

    Bean-counter Part of the furniture

    Registriert seit:
    21 Juli 2007
    Beiträge:
    5.844
    Zustimmungen:
    7.688
    Geschlecht:
    männlich
    Ort:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    140804 Whitby 45428 arrived at new platform 2 with first test train.jpg Update on Whitby Platform 2

    The signalling was duly commissioned last Friday evening (1st), various paperwork and authorisation requirements were met and concluded yesterday afternoon, meaning that the first training/route learning trip - and the first train to use Platform 2 for 30 years - used the new Platform last night. (As a Leeds Holbeck Locomotive, 45428 is always said to have worked summer trains to Whitby over what is now the NYMR on a number of occasions during its mainline career - not sure what the rules were due to curvature for use of the old Platform 2 - the bays 3 and 4 had restrictions for C1 vehicles I believe).

    Photo from Philip Benham.

    Training trips will continue through this week, with sign-off of the Platform for use scheduled for Friday and the first passenger trains - to the existing timetable - for Saturday, 9th.

    Well done to all concerned.

    Steven
     
    Paul42, Hemerdon, 2392 und 5 anderen gefällt dies.
  20. 46118

    46118 Part of the furniture

    Registriert seit:
    16 September 2005
    Beiträge:
    4.043
    Zustimmungen:
    212
    Excellent news. Thanks are due to Ploughman for posting links to the "civil engineering diary " updates, and to your Civil Engineer Nigel Trotter for taking the trouble to create the updates in the first place.
    These updates have kept the project in front of us all, a constant reminder that we must visit Whitby, arriving behind NYMR steam of course.

    I can just savour the fish chips and peas at Hadley's restaurant across the harbour bridge right now......

    46118
     
    Bramblewick gefällt dies.

Die Seite empfehlen