Green liveried 82005, 82006, 82020, 82021 and 82033 were all allocated to70A Nine Elms for part of their life. Other green liveried Std 3 2-6-2...
The lamp irons on the front platform and the top of the smokebox door on 82045 are to the design fitted to Standards allocated to the Southern...
RCTS Green Bibles.
Correct. The P2s were fitted with a Diagram 106 or 108 boiler with a grate area of 50 sq ft. The A3s were fitted with a Diagram 94 boiler with a...
What about the weight restriction on Victoria Bridge?
Fully agree with you. Even the introduction of the calculator dulled my brain.
Deleted
45491 is ex-Barry and never steamed . This is new cladding being made and trial fitted.
How many years have the NYMR been overhauling 34101 Hartland?
I knew I had forgotten something. Massive alterations are required on the smokebox saddle. Probably easier to fabricate a new one.
You obviously would like to do a Didcot style pick'n mix.
82045 has all new wheelsets.
There are a few major differences in the chassis design of the 3s and 4s. The diameters of the driving axles on the 3s are 1/2" smaller than those...
71000 has roller bearings.
But 35011, as originally built, would be unique.
Separate names with a comma.