If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

37403 Mainline update.

Discussion in 'Diesel & Electric Traction' started by DAH, Mar 8, 2015.

  1. DAH

    DAH New Member

    Joined:
    Nov 9, 2014
    Messages:
    102
    Likes Received:
    113
    Gender:
    Male
    Occupation:
    Mechanical Engineer
    Location:
    Bo'ness
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Class 37403 is now taking priority within the diesel shed now that 37025 is almost ready for painting and mainline testing.
    Most of the SRPS diesel group have moved up a gear to get 403 ready this year.

    The full re-wiring continues. Mainline safety systems have been installed and wiring of these continues.
    No 2 end Cab is making good progress . The refurbished nose end internals are being installed.

    Bodywork,
    Most of the work at No 2 end is complete.
    No 1 end cab sides are next along with a few side vent rain strips. .

    Photo updates can be seen weekly on the last pages of the 403 galley :

    http://realrail.smugmug.com/Trains/37403-Restoration-at-Boness/

    DAH
    http://realrail.smugmug.com/Trains
    https://www.youtube.com/user/BONESS27001
     
    maddog likes this.
  2. Snifter

    Snifter Well-Known Member

    Joined:
    Aug 26, 2014
    Messages:
    1,692
    Likes Received:
    4,298
    Gender:
    Male
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well done lads. The Bo'ness boys are a center of restoration excellence.
     

Share This Page