If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Jacobite 2024

Dieses Thema im Forum 'What's Going On' wurde von alastair gestartet, 29 November 2023.

  1. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Registriert seit:
    9 September 2013
    Beiträge:
    10.674
    Zustimmungen:
    18.699
    Geschlecht:
    männlich
    Ort:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If the idea is just route refresh/keeping the paths current, would there be a need to take a rake of coaches up there, could the same not be achieved by light engine?
     
  2. Matt37401

    Matt37401 Nat Pres stalwart

    Registriert seit:
    8 Juni 2014
    Beiträge:
    15.551
    Zustimmungen:
    11.955
    Ort:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You mean someone from 10A’s actually spoke to the press? I didn’t think they did that!
     
  3. Groks212

    Groks212 Well-Known Member

    Registriert seit:
    5 April 2009
    Beiträge:
    1.143
    Zustimmungen:
    1.008
    Ort:
    Nottingham
    Maybe Mr Smith is being crafty here. The stock is not going into the yard where the Jacobite stock is normally stabled, but in the Traincare depot at Ft William, perhaps he is having CDL fitted there. I see there is a van in the consist which could contain parts for fitting CDL.

    Dave B
     
  4. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.263
    Zustimmungen:
    12.515
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's possible, I hope that's the idea, otherwise if WCRC tries to get around the CDL rules by sleight of hand, I can't see it ending well for West Coast, they would certainly lose their licence to operate on the main line.
     
  5. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Registriert seit:
    12 September 2005
    Beiträge:
    10.146
    Zustimmungen:
    9.777
    Geschlecht:
    männlich
    Ort:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    there is of course the theatre and news value of running a train empty as those nasty rule makers say we can't carry on as normal . The cynic expects the press to find a heartbroken four year old to be very upset for the cameras.....
     
    green five, Sheff, MellishR und 5 anderen gefällt dies.
  6. GWR4707

    GWR4707 Nat Pres stalwart

    Registriert seit:
    12 Mai 2006
    Beiträge:
    19.232
    Zustimmungen:
    17.566
    Geschlecht:
    männlich
    Ort:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What with LSL also running light stock up there the whole line seems to be descending into a sea of appendage waving!
     
  7. class8mikado

    class8mikado Part of the furniture

    Registriert seit:
    1 Juni 2009
    Beiträge:
    3.840
    Zustimmungen:
    1.644
    Beruf:
    Print Estimator/ Repository of Useless Informatio.
    Ort:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    too late to get my April fool pic of a 56xx in Blue, push pull fitted to work with lsl's Scotrail set out...:Woot:
     
  8. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Registriert seit:
    11 September 2005
    Beiträge:
    36.443
    Zustimmungen:
    9.907
    Geschlecht:
    männlich
    Beruf:
    Retired-ish, Part time rail tour steward.
    Ort:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe that the van is the usual collection of spares for rolling stock and locos.
     
  9. Johnb

    Johnb Nat Pres stalwart

    Registriert seit:
    3 Dezember 2014
    Beiträge:
    15.538
    Zustimmungen:
    18.385
    Geschlecht:
    männlich
    Beruf:
    Retired, best job I've ever had
    Ort:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If it's a GUV van it does go up there every year
     
  10. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    28.732
    Zustimmungen:
    28.659
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Isn’t that for the Tory thread?


    Sent from my iPhone using Tapatalk
     
  11. Beardy

    Beardy New Member

    Registriert seit:
    18 Mai 2021
    Beiträge:
    35
    Zustimmungen:
    30
    Ort:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My first thought on a similar vein was actually the Hastings unit, not sure if they would be keen on it being lugged around by a steam loco (if its even possible) but comes with CDL, its own power supply, opening windows and is fitted with CET toilets.
     
  12. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Registriert seit:
    12 September 2005
    Beiträge:
    10.146
    Zustimmungen:
    9.777
    Geschlecht:
    männlich
    Ort:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Paul Grant

    Paul Grant Well-Known Member

    Registriert seit:
    6 Oktober 2010
    Beiträge:
    1.524
    Zustimmungen:
    1.120
    Ort:
    Fife
    Heritage Railway Volunteer:
    No I do not currently volunteer
  14. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.589
    Zustimmungen:
    22.717
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suspect Martin that they don't have your flights of fanciful thinking! :)
     
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.589
    Zustimmungen:
    22.717
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I get the fact that MPs in the area of the Jacobite would be concerned about the service but do they have any more leverage than the next person?

    Perhaps the first question to ask is why, in the face of a really early warning about the fitting of CDL, everyone decided to leave it to the last minute. Well I think we can answer that one and it must have something to do with cost.

    Then we come to the question about the evidence provided by all companies operating Mark 1 coaches that they have started, or intend to start fitting CDL to a given time scale. Presumably the ORR is satisfied about what other operators have said, or in the case of LSL and I believe Belmond, are doing. Only WCRC is digging its heels in, it seems.

    Sending a rake of coaches up to the Fort suggests that WCRC anticipates a shift of ORR in their direction. I hope that's the case for their sake otherwise it does rather feel like a red rag to a bull.
     
    JBTEvans und acorb gefällt dies.
  16. wcmlbls1846

    wcmlbls1846 Well-Known Member

    Registriert seit:
    24 April 2009
    Beiträge:
    1.034
    Zustimmungen:
    543
  17. Walker

    Walker New Member

    Registriert seit:
    16 November 2023
    Beiträge:
    69
    Zustimmungen:
    88
    Ort:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In addition they moved 33012 from Swanage to Eastleigh, collected 50026 and took it back to Swanage, worked the thunderbird duties on the East Coast Mainline and did various other moves. They are a big part of the railway scene.
     
  18. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.589
    Zustimmungen:
    22.717
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the Jacobite with its local and international mix of people of all ages I feel sure that all the ORR wants is something very straightforward. By that I mean doors that cannot be opened until a train is stationary with each door at a platform. Let's not forget that a secondary bolt can be released at any time on a journey for whatever reason. Train stewards do not spend a journey next to every door.

    Let's do a reality check. I feel certain that many on here have seen images of trains in the past arriving at termini in the rush hour with many doors being opened as people hurry to exit the train, sometimes whilst it is still moving, in their rush to move on to the next part of the journey. Apply that thought to a charter arriving at say Euston late at night when it is also running late and there are connections across London to make.

    Food for thought.
     
  19. 30567

    30567 Part of the furniture Friend

    Registriert seit:
    7 August 2012
    Beiträge:
    6.124
    Zustimmungen:
    4.088
    Does the Jacobite fit on the platform at Glenfinnan? Not defending WCR but isn't one of the arguments that CDL without selective doesn't actually deliver that?
     
    Last edited by a moderator: 6 April 2024
  20. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Registriert seit:
    30 Mai 2009
    Beiträge:
    22.589
    Zustimmungen:
    22.717
    Ort:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A good example of where the TOC's operational procedures now must show what instructions apply generally and then specifically where what you say applies at relevant stations on the Jacobite route where passengers may alight. This should remain the case once CDL is fitted. Selective opening would then not be necessary.
     

Die Seite empfehlen