If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von 14xx Lover gestartet, 4 Januar 2010.

  1. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Registriert seit:
    2 Oktober 2015
    Beiträge:
    7.914
    Zustimmungen:
    6.647
    Geschlecht:
    männlich
    Ort:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But is it?
    Not sure about SRPS but if you look at RTC, Steam Dreams and WCRC's own programmes (that are only planned I admit) they loo pretty normal for this year from May 17 onward, do they really have many coaches spare?
     
  2. Alan Kebby

    Alan Kebby Well-Known Member

    Registriert seit:
    18 September 2019
    Beiträge:
    1.192
    Zustimmungen:
    1.249
    Geschlecht:
    männlich
    Ort:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Tom didn’t mean hiring the Plc coaches that the receiver has up for sale. He meant hiring in other coaches from elsewhere that might be available for hire.
     
  3. Alan Kebby

    Alan Kebby Well-Known Member

    Registriert seit:
    18 September 2019
    Beiträge:
    1.192
    Zustimmungen:
    1.249
    Geschlecht:
    männlich
    Ort:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think WCRC struggled to spare the 4 coaches they hired to Swanage for the Wareham services.

    But anyway I think we’ve established that the LR trust hiring in coaches from anywhere is a non starter. They’ll have to use their own coaches, either existing ones or additional ones purchased from the receiver.
     
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    27.790
    Zustimmungen:
    64.455
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is that what I meant? <confused/>

    People are saying there aren't carriages available. But if the LR wish to carry on operation, the fundamental requirement for carriages across the sector as a whole doesn't change - same number of operational railways needing the same number of operational carriages. So if the railway has a future at all, but is struggling to raise the likely sizeable six figure sum to buy a rake of carriages, why not some kind of lease-back arrangement - either from the receiver or some person / organisation with the necessary cash to buy the carriages? Turn a capital spend into a revenue spend.

    Tom
     
    RichardBrum und Matt78 gefällt dies.
  5. oldmrheath

    oldmrheath Well-Known Member

    Registriert seit:
    18 Juni 2006
    Beiträge:
    2.334
    Zustimmungen:
    2.563
    Foxfield have had a Llangollen TSO M4234 on hire while their own TSO has been at Llangollen for contract repairs. A report on Foxfield's C&W Facebook page on 5th March said that this carriage had been purchased privately for Foxfield in an agreement made just before receivership.

    Jon
     
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.263
    Zustimmungen:
    12.514
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only realistic hope is that supporters of the railway purchase some coaches from the receiver privately, and then place them on loan to the trust, so at least there will be some stock to run a service with, Selling locos, unless its to people who support the line, and will continue to base them on the line, isn't going to be the answer either, selling a loco, or two, and then losing them, so you can buy coaches might end up with a scenario where by you will have sufficient coaches, but no motive power to haul them.
     
    andrewshimmin gefällt dies.
  7. garth manor

    garth manor Well-Known Member

    Registriert seit:
    10 April 2009
    Beiträge:
    1.889
    Zustimmungen:
    529
    A DMU service would not require additional coaches or steam locos.
     
  8. Alan Kebby

    Alan Kebby Well-Known Member

    Registriert seit:
    18 September 2019
    Beiträge:
    1.192
    Zustimmungen:
    1.249
    Geschlecht:
    männlich
    Ort:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But also fewer customers without steam to attract them. Although lower costs might help compensate for that.
     
  9. twr12

    twr12 Well-Known Member

    Registriert seit:
    2 September 2007
    Beiträge:
    1.658
    Zustimmungen:
    820
    DMUs can be hauled by steam locos. If you’re in dire straits, something is better than nothing.
     
  10. brennan

    brennan Member

    Registriert seit:
    11 September 2016
    Beiträge:
    408
    Zustimmungen:
    452
    Ort:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another point to consider is that, with the workshops being closed and equipment being sold off , will there be the facilities or even staff competency to overhaul those locomotives and stock that remain after the receivers have departed. Given the poor standard of workmanship on the contract jobs ( as alleged by the customers) what condition is the home fleet in?
     
    Great Western gefällt dies.
  11. alastair

    alastair Well-Known Member

    Registriert seit:
    7 November 2005
    Beiträge:
    1.272
    Zustimmungen:
    788
    @Alan Kebby When I travelled on the WCRC operated Wareham-Swanage train it was an ex LU 4TC unit which I am pretty sure was not owned by WCRC?
     
  12. Alan Kebby

    Alan Kebby Well-Known Member

    Registriert seit:
    18 September 2019
    Beiträge:
    1.192
    Zustimmungen:
    1.249
    Geschlecht:
    männlich
    Ort:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was initially run using 3 WCRC Mk1s and a WCRC Mk2 as the 4TC wasn’t ready in time. After a few weeks, once the 4TC overhaul was complete, it took the place of the WCRC coaches.
     
  13. alastair

    alastair Well-Known Member

    Registriert seit:
    7 November 2005
    Beiträge:
    1.272
    Zustimmungen:
    788
    Ah, thanks for clarification.
     
  14. marshall5

    marshall5 Part of the furniture

    Registriert seit:
    26 Oktober 2010
    Beiträge:
    2.521
    Zustimmungen:
    4.359
    Ort:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They won't need to. As pointed out previously the Suburban Group have 4 (shortly to be 5) Mk1 non-corridors which are eminently suitable for a Covid restricted service. The Trust also own some Mk1 corridors themselves.
    Ray
     
    andrewshimmin, std tank, jnc und 2 anderen gefällt dies.
  15. Jordan Leeds

    Jordan Leeds New Member

    Registriert seit:
    10 Februar 2018
    Beiträge:
    83
    Zustimmungen:
    66
    Geschlecht:
    männlich
    Ort:
    lancashire/cheshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sub coaches are very very comfortable and make a very nice journey even nicer
     
    DavidH, Paul42, Wagoniester und 2 anderen gefällt dies.
  16. lostlogin

    lostlogin Member

    Registriert seit:
    9 Juli 2007
    Beiträge:
    444
    Zustimmungen:
    228
    Owning is one thing, being in a position where are suitable for public service is another. I have no if they are all in A1 condition, sitting under a tarpaulin waiting to repaired or a mixture somewhere in between.
     
  17. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Registriert seit:
    9 Oktober 2019
    Beiträge:
    1.401
    Zustimmungen:
    1.772
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And if they ride in the Wickham set they are in for a treat.
    Pat
     
    andrewshimmin gefällt dies.
  18. Vulcan Works

    Vulcan Works Member

    Registriert seit:
    12 April 2018
    Beiträge:
    266
    Zustimmungen:
    745
    Geschlecht:
    männlich
    Ort:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Goodness me there is a lot of idle speculation on here about what the Llangollen Plc should or shouldn’t have done in the past and what the Trust should or shouldn’t do in the future! Why not just be patient, I’m sure the Trust at the appropriate time will provide an update on establishing a way forward, including any arrangements made with the Receiver.
     
    hoffman, mgl, ChuffChuff und 12 anderen gefällt dies.
  19. buzby2

    buzby2 Well-Known Member

    Registriert seit:
    26 März 2009
    Beiträge:
    1.712
    Zustimmungen:
    586
    Ort:
    Swanage
    It was not ex-LU and was hired from them during a period it was not being used by them. At the end of Project Wareham's first trial period the 4TC was returned to West Ruislip depot to resume service on LU special trains.
     
  20. M59137

    M59137 Well-Known Member

    Registriert seit:
    23 September 2009
    Beiträge:
    1.389
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Beruf:
    Carriage & Wagon
    Ort:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think a few spectators, when considering "essential rolling stock requirement", are confusing steam gala weekend with "Llangollen 90% of the time".

    Others have said that the core activity of transporting passengers was indeed profitable. One only has to examine Llangollen timetables to see that for most of the year they ran either a 1 train service (Steam or DMU), or a 2 train service. (Steam X2 or Steam + Diesel). This is very typical of a 5 to 10 mile railway.

    As enthusiasts I'm sure we all want to see 5 rakes of stock running during a gala, but as others have stated, there's enough "non plc" rolling stock (I won't comment on steam locos) for 2x short rakes, and the DMU fleet is unaffected.

    The phoenix which (fingers crossed) will rise from the ashes will hopefully be concerning itself with the ability to run a "back to basics" railway, and secure the equipment to maintain a simple 1x steam and DMU service. Everything else, given the recent disaster, could be considered at this point an "unnecessary luxury" and therefore perhaps in the "nice to save, but only if we can" category?

    Sent from my moto g(8) power using Tapatalk
     
    staffordian, unitdriver, JBTEvans und 24 anderen gefällt dies.

Die Seite empfehlen