If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Sanding arrangement

Dieses Thema im Forum 'Locomotive M.I.C.' wurde von Stu in Torbay gestartet, 29 Mai 2008.

  1. Stu in Torbay

    Stu in Torbay Part of the furniture

    Registriert seit:
    6 September 2005
    Beiträge:
    2.829
    Zustimmungen:
    42
    Beruf:
    GPS Navigation Engineer
    Ort:
    Goodrington Bank, Paignton
    Looking at an Eng dwg of a GWR King I have pinned up at work I note that the pipe from the sand box under the cab goes down close to the rail-head behind the rear driver. The question I have is: how effective is this at getting sand under the wheel, as it looks like the arrangement would always be depositing sand behind the wheel, which would not then be 'run over' by the driving wheel unless the loco rolled back. Wouldn't it be better to blast sand in front of the wheel, so it gets trapped as the wheel rolls forward onto the rail? Does it rely on sand being picked up on the rear of the wheel and carried round as the wheel turns to eventually provide adhesion when that part of the wheel contacts the rail? there must be a reason?
     
  2. sharpo

    sharpo Well-Known Member

    Registriert seit:
    2 Oktober 2005
    Beiträge:
    2.338
    Zustimmungen:
    0
    I've always thought most locos has at least 1 pair of sand pipes for running in reverse, you would only use that for reverse running of course.

    Just had a look at some photos, "Scots" for example had sand pipes in front of the first 2 driving axles for forward running & a pair behind the centre axles for reverse running.
     
  3. olly5764

    olly5764 Well-Known Member

    Registriert seit:
    29 Dezember 2006
    Beiträge:
    1.887
    Zustimmungen:
    1.017
    Geschlecht:
    männlich
    Beruf:
    Engineer
    Ort:
    Normally in a brake van somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You will find that there are both leading and trailing sanders, on Western Locos, the Leading ones are infront of the leading coupled wheels, and the trailing ones, behind the trailing coupled set.
    There is a shaft with a series of holes passing through a tube with a simular arrangement to controll the flow.
    They are very effective, as long as the sand is dry, wet sand tends to form lumps and block the pipes.
     
  4. THE MELTER

    THE MELTER Member

    Registriert seit:
    31 Oktober 2006
    Beiträge:
    422
    Zustimmungen:
    63
    Beruf:
    ENGINEER
    Ort:
    BLACK COUNTRY
    Some of the old drivers used to put sand down as they backed onto coaches using the rear pipes for a quick and slip free exit
    The melter
     
  5. olly5764

    olly5764 Well-Known Member

    Registriert seit:
    29 Dezember 2006
    Beiträge:
    1.887
    Zustimmungen:
    1.017
    Geschlecht:
    männlich
    Beruf:
    Engineer
    Ort:
    Normally in a brake van somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Used to inferes that people don't bother now!
     
  6. hassell_a

    hassell_a Member

    Registriert seit:
    30 März 2006
    Beiträge:
    735
    Zustimmungen:
    2
    I've done it on occasion when backing on at Bridgnorth on a greasy rail.
     
  7. olly5764

    olly5764 Well-Known Member

    Registriert seit:
    29 Dezember 2006
    Beiträge:
    1.887
    Zustimmungen:
    1.017
    Geschlecht:
    männlich
    Beruf:
    Engineer
    Ort:
    Normally in a brake van somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've done it on occasion when backing on at Bridgnorth on a greasy rail.[/quote:26g0sqal]
    Exactly the situation that crossed my mind!
     
  8. stallis

    stallis New Member

    Registriert seit:
    6 Februar 2008
    Beiträge:
    82
    Zustimmungen:
    0
    Not sure if they still do it, but a few years ago it was common practice for the crew to hand sand the rails out of Haverthwaite station on wet dank days - not that uncommon in the Lake District! Certainly helped for a good start for the climb up out of the station and into the tunnel.
     
  9. jtx

    jtx Well-Known Member

    Registriert seit:
    4 Juli 2007
    Beiträge:
    1.868
    Zustimmungen:
    855
    Geschlecht:
    männlich
    Beruf:
    Happily retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've done it on occasion when backing on at Bridgnorth on a greasy rail.[/quote:3hudy96b]

    Me too, Ade, once you're clear of the point blades on the Cleobury Road bridge, of course! It also helps prevent wheel lock up when backing down on to stock, and those rails can be seriously greasy in the right,(or wrong) conditions.
     
  10. Pannier Man

    Pannier Man Member

    Registriert seit:
    23 August 2007
    Beiträge:
    395
    Zustimmungen:
    67
    Geschlecht:
    männlich
    Beruf:
    Network Rail - Retired
    Ort:
    Reading
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Having working sanders is still part of the daily exam prior to running a railtour.
     
  11. Avonside1563

    Avonside1563 Well-Known Member

    Registriert seit:
    13 Juli 2007
    Beiträge:
    1.141
    Zustimmungen:
    244
    Geschlecht:
    männlich
    Ort:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly the situation that crossed my mind![/quote:16rjxfeg]

    Most of the crews at Foxfield have sanded when backing onto the train in the days of starting on a 1 in 19 out of the colliery. Now we have the new run-round on the level it is less of an issue. An interesting question though, are we the only railway where working sanding gear is a requirement written into the rule book?

    Oh, and in answer to the first question, the sanders you refer to are only designed to be used when the loco is running in reverse! ](*,)
     
  12. RobHickerton

    RobHickerton New Member

    Registriert seit:
    18 Juli 2006
    Beiträge:
    175
    Zustimmungen:
    159
    Beruf:
    Engieering Consultant
    Ort:
    Wiltshire
    See <http://www.raib.gov.uk/cms_resources/080702_R142008_Lydney.pdf> re use of sanders p25-6 in particular about lack of sand

    Rob
     
  13. ovbulleid

    ovbulleid Member

    Registriert seit:
    29 Januar 2007
    Beiträge:
    899
    Zustimmungen:
    4
    Geschlecht:
    männlich
    Beruf:
    i sit behind my computer clicking on 'view active
    Ort:
    i'd rather be in newcastle
    porta recommended that the leading wheels should be sanded as well. i think some of his south american engines had this arrangement fitted. he belieed that the leading sand should be finer than the driving sand, which would have made filling mistakes quite common. he also designed a new tyre which would move the greased sand off the contact surface of the rail
     

Die Seite empfehlen