If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Dieses Thema im Forum 'Steam Traction' wurde von Leander's Shovel gestartet, 20 Oktober 2007.

  1. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    4.834
    Zustimmungen:
    3.159
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    UPS draw on something like that would be quite large, and the support coach is the obvious place for it.

    Some sort of solar panel arrangement would help, within the current Envelope, also alternator power when on the move, generator when prolonged static????

    Max Depth of a cabinet at moment is 1000mm, and mainly dependant of Server hardware, increasing in depth, however I know companies doing 1 off's.

    Cabling from both end of the support coach, together with the loco would be needed in case of tender first running.

    Quite an undertaking in my view.
     
  2. 5944

    5944 Resident of Nat Pres

    Registriert seit:
    14 Januar 2006
    Beiträge:
    8.863
    Zustimmungen:
    9.268
    Geschlecht:
    männlich
    Beruf:
    Train Maintainer for GTR at Hornsey
    Ort:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As @big.stu has pretty much said, I believe the ETCS has to be part of the traction unit, so fitting to the support coach wouldn't be permitted.
     
    big.stu und S.A.C. Martin gefällt dies.
  3. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Registriert seit:
    31 August 2010
    Beiträge:
    5.615
    Zustimmungen:
    9.418
    Geschlecht:
    männlich
    Beruf:
    Asset Engineer (Signalling), MNLPS Treasurer
    Ort:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think my suggestion, made in good faith, ignored the blindingly obvious (to everyone else it seems!) - the necessity to couple and uncouple the support coach and not be permanently coupled to count as part of the traction unit - which would have been my solution. Ho hum.
     
  4. Jimc

    Jimc Part of the furniture

    Registriert seit:
    8 September 2005
    Beiträge:
    4.117
    Zustimmungen:
    4.821
    Beruf:
    Once computers, now part time writer I suppose.
    Ort:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Clearly the solution is to hurry up and finish those GWR 7200s, which would have plenty of room in the bunker for the hardware. OK gauging them might be a small problem, but there must be a couple of stations left on Network rail they could run between...
     
  5. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    4.834
    Zustimmungen:
    3.159
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    Dare I say, a common sense approach and derogation might help in this situation????
     
  6. GWR4707

    GWR4707 Nat Pres stalwart

    Registriert seit:
    12 Mai 2006
    Beiträge:
    19.232
    Zustimmungen:
    17.566
    Geschlecht:
    männlich
    Ort:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am sure I read years back, when it was discussed regarding fitting the kit to a steam loco for use on the Cambrian, that the kit is something like the size of a fridge (or was then at least).
     
  7. GWR4707

    GWR4707 Nat Pres stalwart

    Registriert seit:
    12 Mai 2006
    Beiträge:
    19.232
    Zustimmungen:
    17.566
    Geschlecht:
    männlich
    Ort:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From my very vague recollection wasn't the dispute with WCRC which led to DBC being the sole operator down to a concern regarding the fitting of liners, somewhat ironically....
     
    andalfi1 gefällt dies.
  8. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.107
    Zustimmungen:
    8.634
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking at that kit Simon linked to, it seems to be in 3U racks which to me suggests - most likely - extended 100mm Eurocards for the PCBs which are 266mm deep. Add some room for internal wiring, fans and you've got to about 400mm deep for the chassis. This is definitely "guesswork", by the way!

    So you're looking at a rack at least 600mm deep to allow for comfortable rear-panel wiring, if any exists. My last experience of building up kit like this required 800mm racks - and Sod's law sure enough meant someone turned up with a server that was 850mm deep so I could never fit the rear doors!
     
    guycarr360 gefällt dies.
  9. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.107
    Zustimmungen:
    8.634
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Larder or American?
     
    big.stu gefällt dies.
  10. MarkinDurham

    MarkinDurham Well-Known Member

    Registriert seit:
    4 Mai 2007
    Beiträge:
    2.229
    Zustimmungen:
    999
    Ort:
    Durham
    I believe that it was because the A1 Trust had used a contractor who was not approved by WCRC to do some work on 60163.
     
  11. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.107
    Zustimmungen:
    8.634
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    @S.A.C. Martin - is there a primer for ETCS to read anywhere? I'd like to learn a bit more about what's going on with it, how it works and how hardened a system it has to be?
     
  12. twr12

    twr12 Well-Known Member

    Registriert seit:
    2 September 2007
    Beiträge:
    1.658
    Zustimmungen:
    820
    I’ve been involved with early design work for fitting ECTS to “heritage” diesels.

    Some manufacturers are saying that the size of equipment has reduced considerably since the Cambrian pilot scheme 158s were fitted.

    But as the deadline for total fitment of ECS keeps being extended and extended, there are more timely issues for the mainline charter industry to deal with: viz:-
    Door retention
    Toilet tanks
     
  13. 5944

    5944 Resident of Nat Pres

    Registriert seit:
    14 Januar 2006
    Beiträge:
    8.863
    Zustimmungen:
    9.268
    Geschlecht:
    männlich
    Beruf:
    Train Maintainer for GTR at Hornsey
    Ort:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've got a 353 page training document about the new Siemens class 717s, and there's 12 pages in there about ETCS. When I get a chance I'll list all the equipment that's involved. It's a lot, but it's also spread about. The two computers would take up the space of a decent sized microwave, so I'm guessing they're 19" racks but I haven't had chance to check.
     
  14. DragonHandler

    DragonHandler Well-Known Member

    Registriert seit:
    27 Mai 2016
    Beiträge:
    1.286
    Zustimmungen:
    1.590
    Geschlecht:
    männlich
    Ort:
    West London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    EEEEEKKKKK!!!!!!!!! :eek::eek::eek:
     
    The Green Howards gefällt dies.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Registriert seit:
    8 Dezember 2014
    Beiträge:
    19.264
    Zustimmungen:
    12.516
    Geschlecht:
    männlich
    Ort:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As regards fitting ETCS etc,whilst I can see the problems with loco fitment are going to be hard to fit onto a tank engine I dare say someone will come up with a way to do it, .I can however, see a problem with fitting the equipment on board the support coach, as that means that where an TOC has more than one support vehicle, then they could very well have to have more than one coach outfitted, at the moment in cases where the loco goes to turn, using a turn table, the support coach can find its self on the other end of the rake, so that may mean having to have two support vehicles, if its not able to shunt the support vehicle, i'm thinking more about the Dartmouth type runs, where the engine often goes and turns, gets serviced, but the support coach remains with the coaching rake.
     
  16. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    28.733
    Zustimmungen:
    28.659
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It might, but I suspect you will still have an irreducible minimum problem of proving that the connection between loco & electronics is intact every time they are reattached. That must give a high risk of failure.


    Sent from my iPad using Tapatalk
     
    big.stu gefällt dies.
  17. The Green Howards

    The Green Howards Nat Pres stalwart

    Registriert seit:
    20 Februar 2016
    Beiträge:
    15.107
    Zustimmungen:
    8.634
    Beruf:
    Layabout
    Ort:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of course, there is always the unthinkable - that ETCS, when it finally gets adopted, will simply mean that only the big chuffers will get to play on the main line. But as others have pointed out, the kit is getting smaller all the time.
     
  18. Steve

    Steve Resident of Nat Pres Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    12.730
    Zustimmungen:
    11.847
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Anyone who has had the pleasure of working on a BR standard 2-6-4T will know that it probably has more locker space than any other loco, certainly more than I have ever come across, not to mention the voids under the bunker I'm sure that you could fit all this kit onto one and still have enough space for the drivers bag. (The fireman's may have to go in a corner, though :))
     
  19. toplight

    toplight Well-Known Member

    Registriert seit:
    18 Mai 2009
    Beiträge:
    1.351
    Zustimmungen:
    1.288
    Ort:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is an article about the ETCS in the current issue of Steam railway, don't have it in front of me but said something like it would cost over a million pounds to fit to each steam loco and that network rail would pay for say 6 steam locos to be fitted. Sounds crazy and that is would effectively bar most steam from running on lines fitted just on cost grounds. I think it involves getting rid of all lineside signals and sending any 'signal' instructions direct to the loco so it isn't that steam locos could be exempt from it.
     
  20. Andy Williams

    Andy Williams Well-Known Member

    Registriert seit:
    23 April 2010
    Beiträge:
    1.037
    Zustimmungen:
    1.063
    Beruf:
    Design Engineer
    Ort:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Enterprise gefällt dies.

Die Seite empfehlen