Llangollen Railway

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od 14xx Lover, 4. Siječanj 2010..

  1. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Pridružen(a):
    12. Rujan 2005.
    Poruka:
    10,146
    Lajkova:
    9,777
    Spol:
    Muškarac
    Grad:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    nothing insurmountable were the money and opportunity there
     
  2. Breva

    Breva Well-Known Member

    Pridružen(a):
    11. Listopad 2010.
    Poruka:
    2,347
    Lajkova:
    4,078
    Grad:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A conflict in terms, surely? They are there to be seen, and the interesting end at the top has been marred by the oil refinery pipe.
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Pridružen(a):
    9. Rujan 2013.
    Poruka:
    10,674
    Lajkova:
    18,699
    Spol:
    Muškarac
    Grad:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I apologise if this has been asked before, but on the tactile slabs, what is the difference between Corwen and, say, Broadway? Both are newbuild stations where there was nothing there before. Is the block paving cheaper than tarmac, which would surely look better?
     
    echap and Bill Drewett like this.
  4. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    As I understand it tactile paving is recommended for new platforms. There seems to be a differing view about use on heritage railways. I believe that ORR would suggest that they should be used on a new platform (ORR do not give approval or otherwise).

    Ultimately it’s down to the railway concerned whether they are installed or not as they are ultimately responsible for the safety of the platform and its users.

    regards

    Matt
     
  5. RA & FC

    RA & FC Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,128
    Lajkova:
    415
    Spol:
    Muškarac
    Grad:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was Broadway not rebuilt on the original station site? Corwen platform is a complete new build rather than recreation of something that was there before. As for a tarmac surface, how do you get it onto a platform on top of an embankment with no road access to rail / platform level. Or indeed the machines to roll it.
     
    jnc se sviđa ovo.
  6. Breva

    Breva Well-Known Member

    Pridružen(a):
    11. Listopad 2010.
    Poruka:
    2,347
    Lajkova:
    4,078
    Grad:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Originally would have been 3x2s, not tarmac.
     
  7. RA & FC

    RA & FC Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,128
    Lajkova:
    415
    Spol:
    Muškarac
    Grad:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From what I believe the platform design is down to the constraints of the site. Not enough room length or widthways to do much more than what is there. 8 coach length one side, but only 6 the other with no ramps. I’m assuming this is to do with minimum width specification for island platforms against single faced platforms?
     
  8. RA & FC

    RA & FC Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,128
    Lajkova:
    415
    Spol:
    Muškarac
    Grad:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But then the GWR wouldn’t have built the platform out of legioblocks would it.
     
  9. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Pridružen(a):
    9. Rujan 2013.
    Poruka:
    10,674
    Lajkova:
    18,699
    Spol:
    Muškarac
    Grad:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was indeed, yes. I'm struggling to wrap my head round why that makes a difference when they're both brand new stations starting with nothing on the ground (not a jab at you, but the ORR or whoever decides that it does make a difference!)

    As @Breva has said, slabs would have been much better than tarmac or blocks.
     
  10. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,969
    Lajkova:
    2,761
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that ramps are no longer a requirement for platforms.
    As long as measures such as fencing and step access are in place.
     
  11. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,729
    Lajkova:
    11,847
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    RSP5 suggests that tactile paviors should be provided. However, when we installed them on a new platform the Railway Inspector made the comment that they are not bothered about them on heritage railways. Make of that, what you will.
     
    jnc se sviđa ovo.
  12. Matt78

    Matt78 Well-Known Member

    Pridružen(a):
    27. Lipanj 2007.
    Poruka:
    1,729
    Lajkova:
    3,862
    Interesi:
    Solicitor
    Grad:
    South Wales
    thank you, interesting. I had a slightly different comment but it was several years ago now.
     
  13. Herald

    Herald Member

    Pridružen(a):
    30. Ožujak 2015.
    Poruka:
    311
    Lajkova:
    581
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My guess would be that on a risk assessed basis there is a world of difference in terms of speeds and staff availability to assist people at heritage railways whereas mainline ones will often feature a total lack of staff and trains passing at high speed. Also when assessing relative risks an island will automatically be more hazardous as there is no safe area by a fence. Maybe somebody with impaired sight would be able to comment further.
     
  14. City of truro fan

    City of truro fan Member

    Pridružen(a):
    29. Studeni 2015.
    Poruka:
    795
    Lajkova:
    90
    Spol:
    Žena
    Grad:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They might hear a train come in one side and step back to get away from it and fall off the other side on an island. The Orr make them put them on these platforms more I would think.
     
  15. gwilialan

    gwilialan Well-Known Member

    Pridružen(a):
    8. Prosinac 2012.
    Poruka:
    1,706
    Lajkova:
    3,988
    Spol:
    Muškarac
    Grad:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn't there something about wheelchair users having to be able to leave the platform in the case of a fire? (on a stopped train I assume. ) Don't know where they'd go though - they'd just end up un the cess or 6 foot.
     
  16. ross

    ross Well-Known Member

    Pridružen(a):
    18. Svibanj 2017.
    Poruka:
    1,002
    Lajkova:
    2,477
    Spol:
    Muškarac
    Grad:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is a disabled access ramp from the west end of the new Corwen platform. Presumably there is a barrow crossing, but I wouldn't want to be the one writing the method statement for safe usage by non-railway personnel
     
  17. RA & FC

    RA & FC Well-Known Member

    Pridružen(a):
    4. Listopad 2007.
    Poruka:
    1,128
    Lajkova:
    415
    Spol:
    Muškarac
    Grad:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is a stairlift for wheelchair users to exit via the subway. I’m assuming this method is suitable in an emergency as there’s not much alternative! I believe they did look at having a narrow crossing then ramp down to the waterworks access road for the disabled access but this didn’t work out as the users would then end up on a fairly busy road with no pavements.
     
  18. Paulthehitch

    Paulthehitch Well-Known Member

    Pridružen(a):
    13. Veljača 2020.
    Poruka:
    1,090
    Lajkova:
    1,093
    Spol:
    Muškarac
    Grad:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This does not sound like a terribly brilliant arrangement in the event of fire, power failure or other kind of failure. In this sort of situation, buildings are required to provide evacuation chairs which are not free from difficulties of use and require special training of staff.
     
  19. City of truro fan

    City of truro fan Member

    Pridružen(a):
    29. Studeni 2015.
    Poruka:
    795
    Lajkova:
    90
    Spol:
    Žena
    Grad:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would imagine there would be an emergency gate somewhere that in a panic people could walk down to. But as for the disabled access I think this needs looking into. It is not good for people to be tempted onto the track.
     
  20. lil Bear

    lil Bear Part of the furniture

    Pridružen(a):
    11. Prosinac 2006.
    Poruka:
    6,136
    Lajkova:
    1,700
    Spol:
    Muškarac
    Interesi:
    Railway Technician
    Grad:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wasn’t Broadway on its original site? Therefore some grandfather rights were still applicable.

    It’s how Beddgelert was allowed to be rebuilt, new stations can’t have a gradient greater than 1in300(?) or something. However as Beddgelert was on its original site, it was permitted despite being on a 1in33.

    LR Corwen station will have none of this, as it is completely new with enhanced embankment.
     