Tornado

Rasprava u 'Steam Traction' pokrenuta od Leander's Shovel, 20. Listopad 2007..

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,265
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Steel fireboxes are not new, they have been in use for quite some time, I believe the method of securing the stays differs on the continent, than what if the norm here, ON the MN/ WC class they are screwed into the firebox then machined over and are solid , The Continental way seems to prefer hollow stays that are welded in place, and only expanded, then welded Are hollow stays more prown to cracking due to the fact that they are hollow? everything seems to indicate that work on the firebox, was not done right, or that patching, in sections has added to the stresses, where as a whole new firebox, to the redesigned drawingss, would have been a better, and possibly cheaper, in the longer term, solution.
     
    class8mikado and Sheff like this.
  2. clinker

    clinker Member

    Pridružen(a):
    8. Listopad 2016.
    Poruka:
    612
    Lajkova:
    372
    Spol:
    Muškarac
    Grad:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer



    A lot depends on how far things go, if the new firebox design still has welded stays how has the problem been treated? the only way to make the stays more flexible is to make them longer, which would look to me like a narrower inner firebox, which means that the tube nest would be narrower, so this would also mean a new smokebox tubeplate, so the only parts re-used would be the barrell and outer wrapper, which are well into their service life, and probably into need of work, so would it all be a hiding to nothing? The heating stresses in welding the stays is another case in point, continental standards only require what We would term a seal weld, much less heat/stress We require a full penetration weld in a ground out weld prep, lots of heat. As I posted earlier Meiningem were not prepared to apply a CE on the boiler, which had to be the responsibility of the A1SLT, British welders were also employed by meiningem well, We've just had Easter, remember what Pontius Pilate did?


    P.S. is it worth remembering what BR were doing with 16 year old A1's?
     
  3. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,836
    Lajkova:
    22,279
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    BR was ridding itself of 16 year old A1s not because they were life expired but because Steam had finished and they were being replaced by diesels. Younger standard classes went to the cutter’s torch when they were still in perfectly good order.
     
    Big Al se sviđa ovo.
  4. clinker

    clinker Member

    Pridružen(a):
    8. Listopad 2016.
    Poruka:
    612
    Lajkova:
    372
    Spol:
    Muškarac
    Grad:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer



    I'm not disputing any of that, but how many of the scrapped A1's hadn't had a boiler replacement in that time? like every other class the boilers were worked on/repaired/rebuilt and worn out again, Tornado is no longer a new locomotive.
     
    acorb se sviđa ovo.
  5. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,059
    Lajkova:
    3,138
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    … Which is why the plan was to fit a new boiler.
     
    Sir Ralph Wedgwood se sviđa ovo.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,913
    Lajkova:
    5,851
    Presumably at the time it was believed that refurbishing the original boiler would be quicker than finishing building the first of the new ones. With hindsight, possibly that was a mistake, but we don't know what snags may appear with the new boiler when it is eventually delivered. Will it even fit straight away?

    We have been told that there was a clearance problem between the cladding and the rear driving wheel, but how did that arise? What had changed between when the boiler came off and when it went back on?
     
    Sir Ralph Wedgwood se sviđa ovo.
  7. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    3,927
    Lajkova:
    1,070
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Good questions that deserve an answer.
     
    Sir Ralph Wedgwood, Chris86 i Sheff se sviđa ovo.
  8. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,059
    Lajkova:
    3,138
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wouldn’t hold your breath ….
     
    Sir Ralph Wedgwood and Johnb like this.
  9. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,265
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't think you will ever be told what happened, but I'm guessing the people who overhauled the boiler, did not have the same degree of skill as those who built it, and mistakes were made, which lead to the problems, first getting the boiler to fit, and lead to two sets of brand-new tubes having to be scrapped I keep coming back to the question, why send the Boiler to Germany, when there were people here in the UK, who possibly might have not made those mistakes,
     
    Sir Ralph Wedgwood se sviđa ovo.
  10. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Pridružen(a):
    1. Listopad 2023.
    Poruka:
    183
    Lajkova:
    153
    Spol:
    Muškarac
    Grad:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The first of the two new boilers is already almost two years late with no recent update on when it will be delivered. No recent update either on the success - or otherwise - of the fundraising club set up to top up the funds already set aside for Tornado’s overhaul. The target for this was £50k and the overhaul is now estimated to have cost c£1m. I wonder how much has been borrowed from PoW and how that will be repaid?
     
    Last edited by a moderator: 20. Svibanj 2024.
  11. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IIRC work to alter the foundation ring has been ongoing since the first overhaul, again a British design realised with continental practice proving to be not ideal.
    The foundation ring is where in relation to the rear driving wheels ?
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,265
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And that's IMHO, why really a new firebox should have been constructed , correcting the issues, found with the original design, with the stays, done in the same way as on the steel fireboxes used on the Bulleid Pacific's solid Monal stays that are machined over, not hollow secured only by expanding then seal welding, posibly using the same idea of U channel forgings for the foundation ring instead of a separate forging
     
  13. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    10,497
    Lajkova:
    2,857
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    Why did you not draw this to the attention of the A1 Trust initially? Maybe your expertise should be helpful to the new POW build ....on cam profiles for instance ? I'm being cynical... it's easy to criticize after an event... I presume you could do better ?
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,265
    Lajkova:
    12,517
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would they have listened? could i have done better, Well i would have looked at what designs have worked for the last 80 odd years, and had steel fireboxes, what the best designs were, and then, adopted the design if possible, .
    Bulleid 's design of firebox, seems to have stood the test of time, and If I were designing a firebox, i would have started with the basics of that design, and how it was stayed, and Incorportated what's been learnt from that into the design,
     
  15. Eightpot

    Eightpot Resident of Nat Pres Friend

    Pridružen(a):
    10. Kolovoz 2006.
    Poruka:
    8,340
    Lajkova:
    2,506
    Spol:
    Muškarac
    Interesi:
    Engineer Emeritus
    Grad:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Based a a friend's experience in contacting them following the seized inside cylinder piston valve and mangled valve gear affair with 60163 some years ago, probably not.
     
  16. torgormaig

    torgormaig Part of the furniture Friend

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    4,906
    Lajkova:
    7,651
    Are you sure about that? I think that the thermic syphones were the achilles heel of Bulleid boilers as they were (are?) almost impossible to repair. Didn't Eastleigh have a stock of spare Bulleid fireboxes so that they could be replaced as a complete unit when the need arose. I think this may well have been common practice in parts of Europe and the US where steel boxes were in widespread use. Didn't a spare steel firebox come as part of the package when the Austerity 2-10-0s were obtained from Greece back in the 80s. And is there not at least one spare S160 firebox around somewhere?

    Bulleid boilers were excellent in so many ways but they were not designed with longevity in mind.

    Peter
     
  17. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Pridružen(a):
    9. Listopad 2019.
    Poruka:
    1,401
    Lajkova:
    1,772
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The 3 ex-OSE WDs came with 1 spare inner box, and one spare assembly (inner & outer). From memory they didn't have thermic syphons (at least as carried by Bulleids), but just a pair of tubes from bottom to top.
    The single S160 came with a complete firebox assembly (inner and outer, all stayed up) which I believe went into the engine while it was being overhauled at Ropley.
    34.JPG
    A not-very-good shot of them ready to leave Ipswich. (It will be 40 years ago come August Bank Holiday - where has the time.)
    Pat
     
    60017, 26D_M, torgormaig i 1 drugoj osobi se sviđa ovo.
  18. 3855

    3855 Member

    Pridružen(a):
    27. Rujan 2008.
    Poruka:
    632
    Lajkova:
    481
    Spol:
    Muškarac
    Grad:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was it Gordon that had one of those assemblies fitted?
     
  19. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,836
    Lajkova:
    22,279
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Syphon repairs may not be straight forward but they can and have been done.
     
  20. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,650
    Lajkova:
    1,559
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Monel is both very expensive and very challenging to machine, so I imagine that deicion was made on cost grounds, both in procuring the material and the machining cost to make the stays.

    Again, somewhere, there must be a stress report for all this, where someone has done some proper engineering anlysis. Its all well and fine to talk about the past, but it doesnt tell us anything about the stresses in the box in service that we have today.

    The fact is, in the old days, nearly eveything was treated as expendable and life expired after 10 years. We no longer live in that world.
     
    clinker and osprey like this.