If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

الأنشطة الأخيرة الخاصة بـ twr12

  1. أعجب twr12 بمشاركة Steve' في موضوع North Yorkshire Moors Railway General Discussion.

    Back when I managed some HLF projects some twenty years ago, volunteer time could be included in your contribution to the project and given a notional cost. At that time simple labour was costed at £50/day, skilled labour (e.g. an electrician)...

    ‏22 إبريل 2025 في 6:47 مساءاً
  2. أعجب twr12 بمشاركة 5944' في موضوع North Yorkshire Moors Railway General Discussion.

    I know it's all very simplistic, but those sort of figures show why the railway is struggling so much. Assuming 250 passengers, then £3500 per train is £14 per person return on a normal day. But on a Sunday, there's only really three return...

    ‏21 إبريل 2025 في 6:34 مساءاً
  3. المشاركة في موضوع North Yorkshire Moors Railway General Discussion.

    So £2.8M salary costs. Based on £14,000 x 202 days of operation. In isolation, willy waving a number around does not show how much of a proportion of turnover, the salary costs are. Is there a rule of thumb for maximum proportion of turnover...

    ‏21 إبريل 2025 في 2:50 مساءاً
  4. أعجب twr12 بمشاركة Sidmouth' في موضوع North Yorkshire Moors Railway General Discussion.

    Thinking back to the the Great Yorkshire Steam Railway , whilst I appreciate made for TV there is a level of manufactured near crisis to be saved at the last minute, those involved at times came across almost as Perry/croft comedy characters ....

    ‏21 إبريل 2025 في 9:32 صباحاً