If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

32473 Birch Grove

الموضوع في 'Steam Traction' بواسطة 73129, بتاريخ ‏10 إبريل 2009.

  1. 73129

    73129 Part of the furniture

    إنضم إلينا في:
    ‏24 سبتمبر 2007
    المشاركات:
    4,547
    عدد المعجبين:
    1,183
    مكان الإقامة:
    Winchester
    Anyone know when 32473 Birch Grove will be back in service again. I see there are some new photos of her on the Bluebell web site. I hope when she returns to traffic she stays in her present livery.
     
  2. Jdwitts

    Jdwitts New Member

    إنضم إلينا في:
    ‏16 ماي 2008
    المشاركات:
    103
    عدد المعجبين:
    156
    Speaking to some of folks in the C&W works who have just finished painting 'Sir Archibald Sinclair' last weekend, they suggested the E4 is expected to be completed and 'in for painting' at HK towards the end of the year, the dome cover is already in the C&W works! Unfortunatly I neglected to ask about liveries.. I believe there was talk of it being painted in SR green though..?
     
  3. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,831
    عدد المعجبين:
    22,271
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    SR green is the intention. Will look nice with the Maunsell stock in tow.
     
  4. stepney60

    stepney60 Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2005
    المشاركات:
    14,400
    عدد المعجبين:
    0
    Does anyone know how much work is required on the E4? I know the boiler is deemed to be in good nick after having a hell of a lot of work done the last time it was overhauled, but what about elsewhere? I had heard a rumour that there might be an issue with the cylinders?
     
  5. Jdwitts

    Jdwitts New Member

    إنضم إلينا في:
    ‏16 ماي 2008
    المشاركات:
    103
    عدد المعجبين:
    156
    I seem to remember when it was launched into traffic in '98 there was talk that at the next overhaul the cylinder block might be knackered, wasn't it limited to a certain load subsequently because of this? Would have to root through 'Bluebell News' to try and find out.. From memory I think there might be similar issues with the C-class and maybe Stepney. Can anyone 'in the know' confirm?
     
  6. dhic001

    dhic001 Member

    إنضم إلينا في:
    ‏20 يناير 2008
    المشاركات:
    312
    عدد المعجبين:
    35
    مكان الإقامة:
    New Zealand
    Take a look at http://www.bluebell-railway.co.uk/blueb ... _2473.html and you'll see. New liners in the blocks, and pressumably something will be done with the valve faces too. Looking good for a return to traffic in the not too distant future. She'll look great in green.
    Daniel
     
  7. PiliPili

    PiliPili New Member

    إنضم إلينا في:
    ‏4 مارس 2009
    المشاركات:
    57
    عدد المعجبين:
    1
    AIUI, the cylinders are knackered, but there's not enough money for new castings. Lots of work has been done to sleeve the current ones which will keep them running for another turn.

    She will be painted SR olive green. The wheels have already been done, so it's a done deal.

    Pil
     
  8. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sleeving (lining) cylinders is commonplace and isn't a huge job. If that's all that is required then they certainly aren't knackered. If the slide valve faces are worn, that is harder but not beyond doing in situ. If the faces are too far gone to machine then it may need the block out and splitting but it should still be repairable with todays technology. Depends on what else is wrong as to whether it is time to call a halt and consider a new block.
     
  9. Jdwitts

    Jdwitts New Member

    إنضم إلينا في:
    ‏16 ماي 2008
    المشاركات:
    103
    عدد المعجبين:
    156
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,458
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And will be numbered B473, i.e. early Southern, not mid-period like 1638.

    Tom
     
  11. poser500

    poser500 New Member

    إنضم إلينا في:
    ‏8 يناير 2009
    المشاركات:
    66
    عدد المعجبين:
    1
    الجنس:
    ذكر
    مكان الإقامة:
    West Hoathly
    The valve faces have been machined flat already. When I saw the boiler a couple of weeks ago the bottom 2 rows of stays were being replaced and a blowdown valve was being fitted. Most of the foundation ring rivets had been replaced already.
    I'll have a look on Sunday and post an update.

    Dave G.
     
  12. Maunsell man

    Maunsell man Well-Known Member

    إنضم إلينا في:
    ‏1 ماي 2006
    المشاركات:
    1,601
    عدد المعجبين:
    512
    الوظيفة:
    Senior Finance Auditor
    مكان الإقامة:
    Kent
    Will the operating restrictions still apply once she is running again with now repaired cylinders?
     
  13. poser500

    poser500 New Member

    إنضم إلينا في:
    ‏8 يناير 2009
    المشاركات:
    66
    عدد المعجبين:
    1
    الجنس:
    ذكر
    مكان الإقامة:
    West Hoathly

مشاركة هذه الصفحة