If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

34046 Braunton

الموضوع في 'Steam Traction' بواسطة SteamHawk216, بتاريخ ‏26 أوت 2009.

  1. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,591
    عدد المعجبين:
    22,721
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nice to hide everything but sometimes practicalities, including access for maintenance, lead you to a sensible compromise as with 28. Better there than smiling at you from the buffer beam.
     
  2. gwr4090

    gwr4090 Part of the furniture

    إنضم إلينا في:
    ‏8 أوت 2005
    المشاركات:
    2,847
    عدد المعجبين:
    222
    الجنس:
    ذكر
    الوظيفة:
    Scientist (Rtd)
    مكان الإقامة:
    Dorset
  3. Joseph Barnard N-Dublet

    Joseph Barnard N-Dublet New Member

    إنضم إلينا في:
    ‏7 فبراير 2011
    المشاركات:
    1
    عدد المعجبين:
    0
    الوظيفة:
    Student
    مكان الإقامة:
    Worthing
    she iz going to have mainline test runs in the next few weeks, then she will be ready to haul the Return Pompey Pasific now sceduled on saturday 10th september
     
  4. aldfort

    aldfort Well-Known Member

    إنضم إلينا في:
    ‏4 مارس 2009
    المشاركات:
    1,933
    عدد المعجبين:
    4,252
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Cardiff
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As of yesterday Braunton was still in Minehead shed having work done on the pipes under the cab which I think were part of the air braking system. Her new tender is still outside of the shed on jacks as the springs are still to be re-fitted. I believe the tender also needs work to brake cylinders.
     
  5. 6026 King John

    6026 King John Well-Known Member

    إنضم إلينا في:
    ‏10 نوفمبر 2006
    المشاركات:
    1,616
    عدد المعجبين:
    908
    مكان الإقامة:
    Hampton Court, Surrey
    More to the point it's scheduled to haul the Cathedrals Express to Weymouth on 9th July. That seems a bit tight now - is there any chance it will make it?
     
  6. Latest official news is that there are no current plans for mainline test runs and no booked mainline charters. A detailed update for publication is expected soon...

    Steve
     
  7. spindizzy

    spindizzy Member

    إنضم إلينا في:
    ‏21 ماي 2009
    المشاركات:
    899
    عدد المعجبين:
    44

    No chance now, Tangmere has been named as the replacement for the 9th. One Bulleid for another, not a bad swap.
     
  8. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,625
    عدد المعجبين:
    3,615
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the update Steve. The length of time on the boiler certificate is gradually eroding away. <BJ>
     
  9. 21B

    21B Part of the furniture

    إنضم إلينا في:
    ‏2 سبتمبر 2009
    المشاركات:
    3,896
    عدد المعجبين:
    8,658
    It will need a lot of money to get 850 back on the mainline. Don't hold your breath.
     
  10. green five

    green five Resident of Nat Pres

    إنضم إلينا في:
    ‏30 إبريل 2006
    المشاركات:
    6,782
    عدد المعجبين:
    2,620
    الجنس:
    ذكر
    الوظيفة:
    Design Draughtsman
    مكان الإقامة:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Mmmm.............. We don't have a good history of trips with 34067. Lets hope our luck changes with this one!
     
  11. swanrail

    swanrail Guest

    Its going to need another overhaul at this rate
     
  12. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,625
    عدد المعجبين:
    3,615
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Braunton hauled a WSR test train on 18th August,2008. That's nearly three years ago. <BJ>
     
  13. Steamage

    Steamage Part of the furniture

    إنضم إلينا في:
    ‏14 سبتمبر 2005
    المشاركات:
    4,748
    عدد المعجبين:
    1,121
    مكان الإقامة:
    Oxford
    IIRC, Braunton herself is quite sound. It's her tender that is giving trouble passing through the various mainline certification "hoops". She has given good service on the WSR, with no more teething troubles than any other major restoration. Is that fair comment?

    I wish the best of luck and success to team looking after her. I'm really looking forward to seeing her running with Tangmere on The Atlantic Coast Express in September, especially the section from Exeter to Okehampton.
     
  14. 21c107

    21c107 New Member Account Suspended

    إنضم إلينا في:
    ‏30 مارس 2006
    المشاركات:
    21
    عدد المعجبين:
    0
    الوظيفة:
    IT Consultant
    مكان الإقامة:
    East Meon, Hampshire
    What kind of mileage has Braunton achieved on the WSR I wonder ?
     
  15. moored

    moored New Member

    إنضم إلينا في:
    ‏9 فبراير 2008
    المشاركات:
    114
    عدد المعجبين:
    224
    الجنس:
    ذكر
    الوظيفة:
    IT Support
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An update has been posted on the WSR unofficial website:

    Humphrey Davies from Locomotive 34046 Ltd has kindly provided an update on progress. "The current problems preventing the running of the locomotive [SR 4-6-2 no 34046 Braunton] have been centered around snagging requirements as one might expect following major changes, and problems associated with the new tender. The locomotive will be completed shortly with air brake fitting, and once the OTMR & TPWS installations have been completed by contractors. Testing of these systems can progress when the tender is complete and coupled. The tender has had some major work requirements. The tender springs as supplied did not meet the specification and had to be returned to the supplier for correction at the suppliers expense. These are expected to be returned before the end of June. The brake cylinders supplied and installed were not fit for use and we have had to source replacements from India. By kind permission of the owner of Taw Valley we have been able to use two new spare cylinders from that loco which will be replaced when the cylinders on order from India arrive in approx six weeks time. With some items being re worked by West Somerset Restoration plus the efforts of the volunteers and staff at Minehead we anticipate the locomotive should be ready for the [WSR's] gold timetable. Air brake testing will still need to be carried out. Main line operations depend on a series of further commissioning tests being successful and we will keep you advised of progress."
     
  16. Dan Hill

    Dan Hill Part of the furniture

    إنضم إلينا في:
    ‏1 أوت 2008
    المشاركات:
    2,751
    عدد المعجبين:
    830
    الجنس:
    ذكر
    الوظيفة:
    Brick Machine Operator
    مكان الإقامة:
    Haywards Heath
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the Unofficial WSR site there is a picture of 34046 next to Minehead Shed paired with her new tender which is now lined out. Looking very nice. According to the caption some test runs are due to take place it says in the next few days (but the picture was taken on Tuesday) so it may not be far off. Also says she will then enter service in 2 weeks time.

    Mainline return seems closer now. Can't wait to see her back.
     
  17. buseng

    buseng Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    4,801
    عدد المعجبين:
    349
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Tilehurst, Reading, Berks.
    Hope this helps without me getting into trouble again.
    http://www.wsr.org.uk/cgi-bin/gallery8a.cgi?h=Snapshot&p=2011/07/120711_1_lro
     
  18. DH34105

    DH34105 Member

    إنضم إلينا في:
    ‏5 إبريل 2009
    المشاركات:
    454
    عدد المعجبين:
    12
    Link works fine buseng - she looks good and I look forward to seeing her back home soon in Bournemouth/Poole area DH
     
  19. Dan Hill

    Dan Hill Part of the furniture

    إنضم إلينا في:
    ‏1 أوت 2008
    المشاركات:
    2,751
    عدد المعجبين:
    830
    الجنس:
    ذكر
    الوظيفة:
    Brick Machine Operator
    مكان الإقامة:
    Haywards Heath
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks I tried to link it but it took me to the newest photo so I removed it. Fingers crossed she's back for the ACE in September with 34067. That is something I want to see on the mainline. An as built Battle of Britain and a rebuilt West Country.
     
  20. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,625
    عدد المعجبين:
    3,615
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Braunton now rostered for WSR service trains on 27th July. Thanks to wsr.org for the update. <BJ>
     

مشاركة هذه الصفحة