    Class 37403 is now taking priority within the diesel shed now that 37025 is almost ready for painting and mainline testing.
    Most of the SRPS diesel group have moved up a gear to get 403 ready this year.

    The full re-wiring continues. Mainline safety systems have been installed and wiring of these continues.
    No 2 end Cab is making good progress . The refurbished nose end internals are being installed.

    Bodywork,
    Most of the work at No 2 end is complete.
    No 1 end cab sides are next along with a few side vent rain strips. .

    Photo updates can be seen weekly on the last pages of the 403 galley :

    http://realrail.smugmug.com/Trains/37403-Restoration-at-Boness/

    DAH
    http://realrail.smugmug.com/Trains
    https://www.youtube.com/user/BONESS27001
     
    أعجب بهذه المشاركة maddog
  2. Snifter

    Snifter Well-Known Member

    إنضم إلينا في:
    ‏26 أوت 2014
    المشاركات:
    1,692
    عدد المعجبين:
    4,298
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well done lads. The Bo'ness boys are a center of restoration excellence.
     