If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

6023

الموضوع في 'Steam Traction' بواسطة Eightpot, بتاريخ ‏4 اكتوبر 2011.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    Broadly true, but the actual amount of energy in the noise itself (i.e. acoustic energy) is small. The loudness of the noise does give some indication of the energy in the exhaust steam (hence the very quiet exhausts of French compounds) but is influenced by other factors as well.
     
  2. gwr4090

    gwr4090 Part of the furniture

    إنضم إلينا في:
    ‏8 أوت 2005
    المشاركات:
    2,847
    عدد المعجبين:
    222
    الجنس:
    ذكر
    الوظيفة:
    Scientist (Rtd)
    مكان الإقامة:
    Dorset
    According to a report in the autumn issue of the Great Western Echo, the Great Western Society are hoping to send 6023 to the West Somerset Railway in Spring 2017 to allow the new blastpipe to be fully proven ready for main line service. The boiler certificate expires in 2020.
     
    mike1522, Mick45305, green five و 2 آخرون معجبون بهذا.
  3. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've nothing against the WSR, but wouldn't it be better sent somewhere that is permitted to do 60mph testing?
     
  4. 1472

    1472 Well-Known Member

    إنضم إلينا في:
    ‏26 أوت 2008
    المشاركات:
    1,954
    عدد المعجبين:
    2,639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably more important to see whether it will steam or not whilst hill climbing to start with.
     
    أعجب بهذه المشاركة 34098
  5. K14

    K14 Member

    إنضم إلينا في:
    ‏6 نوفمبر 2011
    المشاركات:
    413
    عدد المعجبين:
    306
    مكان الإقامة:
    Catford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think it's more a question of sending it somewhere with a good long run that involves a hill or two. IIRC the GC was mooted a while back, but 1 in 170 o.n.o isn't quite the challenge of the climb from Bishops Lydeard to Crowcombe (or Willton to Crowcombe) with a decent load (10?) behind it.
     
  6. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    411
    عدد المعجبين:
    1,284
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I heard somewhere that the BL to N Fitz was passed for 50mph. Don't know if it's true though.
     
  7. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can i ask the obvious if the boiler has only 3-4 years left why bother to main line it? as it will only see about 3 years, before it has to be withdrawn, Might it be better to not go through the registration until it has had a further 10 year ticket, the fact that hopefully it hasnt seen many steaming circles may mean a retube may be all thats needed?
     
  8. 6024KEI

    6024KEI Member

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    861
    عدد المعجبين:
    475
    مكان الإقامة:
    Bath
    Bearing in mind a fair few don't make their full 7 years before they need boiler work, I'd still reckon if they can get a good three years out of it, its worth making at least some use of that set of tubes. Its unlikely to get heavily flogged anyway as it will depend on support crew availability so the overhaul when it comes still shouldn't be a heavy one given the amount of rebuilding that went into bringing her back from the dead! Plus if they wait a few more years while they retube it etc, 6024 will be back out meaning that there is competition for King haulage.
     
  9. david1984

    david1984 Resident of Nat Pres

    إنضم إلينا في:
    ‏13 سبتمبر 2005
    المشاركات:
    12,910
    عدد المعجبين:
    1,387
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    No noise is boring, compare a 37 to a 66...
     
    Spamcan81, Matt37401 و 34098 معجبون بهذا.
  10. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A Pannier to a Taffy tank? Why?
     
    railrover, GWRArry, Spamcan81 و 2 آخرون معجبون بهذا.
  11. 34098

    34098 Member Account Suspended

    إنضم إلينا في:
    ‏22 جوان 2010
    المشاركات:
    587
    عدد المعجبين:
    138
    الوظيفة:
    ,
    مكان الإقامة:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly, best to test it on a hill on a proper load , all very well moving up the demo line on a couple coach, hardly a proper test for it,
     
  12. LISTER B

    LISTER B New Member

    إنضم إلينا في:
    ‏26 اكتوبر 2011
    المشاركات:
    7
    عدد المعجبين:
    5
    At the WSR you can test on hills do 60mph from BL to Norton and have the safty of a preserved line should anything go wrong !
    Also its one of the few King gauge friendly mainline routes in and out of there!
     
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that is another issue, what routes will the king now fit with in NR's somewhat restictive gauging ?
     
  14. nanstallon

    nanstallon Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,358
    عدد المعجبين:
    2,418
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Westcountry
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think she is down to work the GB railtour from Falmouth next May.
     
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,263
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    are you sure your not getting confused with 66023:p:eek:
     
    أعجب بهذه المشاركة andalfi1
  16. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is it this years 46100?
     
  17. 34098

    34098 Member Account Suspended

    إنضم إلينا في:
    ‏22 جوان 2010
    المشاركات:
    587
    عدد المعجبين:
    138
    الوظيفة:
    ,
    مكان الإقامة:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Rightly or wrongly, its been down to work pretty much any train a kings gauged to run on, for at least the past 3 years or so,
    Question is,
    Is it the promotor jumping the gun trying to put bums on seats, opening another can of worms when it doesn't run,
    Or is it down to the loco owning group, who have told said promoter, yeah we can do the run, In full knowledge it doesn't stand a chance of making said deadline.
    Its a tricky one,

    With 3 years left on the ticket wouldnt it be worth a light overhaul/retube then come back with a full boiler ticket and ready to tackle the mainline after a period of running in,
     
  18. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,589
    عدد المعجبين:
    22,715
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is possible, but I don't know, that given the hardly demanding activities it has been involved in since the ten year clock started ticking, the boiler assessment at the appropriate point may trigger exactly what you are suggesting. So its time out of traffic may be short and the main line certification will have been worthwhile.
     
    أعجب بهذه المشاركة andalfi1
  19. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In answer to your first question I strongly suspect its the former, merely as a member of the GWS they have always been very straight in their musings that it will be ready when its ready and not before?

    In terms of the boiler, no idea, she has had a relatively quiet time so it may be the case that they get her certified and mainline proven, then do a boiler overhaul which will in turn give a new ticket?
     
  20. Midland Red

    Midland Red New Member

    إنضم إلينا في:
    ‏11 إبريل 2006
    المشاركات:
    152
    عدد المعجبين:
    23
    مكان الإقامة:
    Staffs
    The main issue here is that when the loco was modified to be within the 'mainline' gauge steaming issues arose. A unique - for Kings - solution has been developed and installed and it is now necessary to prove this solution in conditions as near as is possible to its future mainline operations. The WSR from Minehead to Norton is ideal for this purpose. This boiler ticket or the next ticket is irrelevant at this stage.
     
    Nick Gough, Paul42, LesterBrown و 1 شخص آخر معجبون بهذا.

مشاركة هذه الصفحة