If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

73050 Progress

الموضوع في 'Steam Traction' بواسطة Wansfordman, بتاريخ ‏3 إبريل 2009.

  1. Wansfordman

    Wansfordman Member

    إنضم إلينا في:
    ‏18 اكتوبر 2006
    المشاركات:
    437
    عدد المعجبين:
    0
    الوظيفة:
    Guard, Nene Valley Railway
    مكان الإقامة:
    Peterborough
    The Standard 5 has had its running boards repainted in preparation for lining out. The wheels have also been done and the loco now looks much smarter. 73050 is also in traffic over the Easter weekend with the MK1 stock.
     
  2. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,841
    عدد المعجبين:
    22,293
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for this. I presume it's a two train service so what will be working the second diagram please?
     
  3. Wansfordman

    Wansfordman Member

    إنضم إلينا في:
    ‏18 اكتوبر 2006
    المشاركات:
    437
    عدد المعجبين:
    0
    الوظيفة:
    Guard, Nene Valley Railway
    مكان الإقامة:
    Peterborough
    Second loco hasn't been allocated yet but i know its mixed steam and diesel Sat and Mon.
     

مشاركة هذه الصفحة