Just an observation

الموضوع في 'Steam Traction' بواسطة neildimmer, بتاريخ ‏23 أوت 2015.

  1. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,166
    عدد المعجبين:
    1,144
    according to LNER build dates 60043 was the only A3 built in 1935 exactly 12 months after the penultimate loco (60042)
    wondering why the 12 month delay, any ideas?
    60043 Brown Jack
    https://railway-photography.smugmug.com/LNERSteam/Gresley-Locomotives/Gresley-A1A3/2508-60043-Built-1935-Doncaste/250860043/i-khPqVWs
    https://railway-photography.smugmug.com/LNERSteam/Gresley-Locomotives/Gresley-A1A3/2508-60043-Built-1935-Doncaste/250860043/i-zmtGwxj
    Neil
     
  2. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,736
    عدد المعجبين:
    22,892
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If you look at the Doncaster works numbers it looks as though 60043 was started in sequence but my guess is that the first batch of A4s had greater priority early in 1935 and so the A3 completion date slipped.
     
  3. LesterBrown

    LesterBrown Member

    إنضم إلينا في:
    ‏20 يناير 2009
    المشاركات:
    995
    عدد المعجبين:
    761
    مكان الإقامة:
    Devon
    2507 ex-works 12/34, 2508 (43) ex-works 1/35. Where's the gap?
     