If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة 14xx Lover, بتاريخ ‏4 يناير 2010.

  1. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,700
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s a shame Green Lane couldn’t be diverted up towards the Nursery, and a level crossing installed nearer to Corwen original. As Bob mentioned though, whatever would take money that isn’t there, and suspect what we have now is going to be the best we see. TBF it’s not the worse location, and the volunteers have achieved an awful lot.
     
    أعجب بهذه المشاركة jnc
  2. Paulthehitch

    Paulthehitch Well-Known Member

    إنضم إلينا في:
    ‏13 فبراير 2020
    المشاركات:
    1,090
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    مكان الإقامة:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One needs to be a little cautious of supposed "grandfathers rights". Much wishful thinking I fear
     
    أعجب بهذه المشاركة jnc
  3. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It used to be 1 in 300 but is now 1 in 500 and straight for new stations on heritage railways. however, where trains don't terminate, steeper gradients are allowed, subject to agreement with the ORR. (RSP5.)
     
    lil Bear و jnc معجبون بهذا.
  4. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    4,834
    عدد المعجبين:
    3,157
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    Just read the statement, and you wonder how those who have had recent contract work undertaken, feel about the situation.

    I can think of a beautiful blue engine in the NRM that had contracted boiler work done, do they have a recourse if work proves unsuitable, as already proved with another LNER loco.

    Know the A4 boys had a contact on site, watching repairs be carried out, so in effect should be Ok.
     
  5. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,265
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They've had a couple of people keeping an eye on progress, and as I far as I'm aware, no concerns have been raised about the quality of the work. Both have decades of experience with the loco so I'm sure anything untoward would've been flagged up.
     
    guycarr360 و torgormaig معجبون بهذا.
  6. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,146
    عدد المعجبين:
    9,777
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I hope that all liabilities are at least assessed by the new board, both those physically known , and those that may arise from the fall out of engineering work done . A very bold recovery plan is going to be needed along with a healthy does of good fortune plus a covid free 2021 season
     
    jnc و 35B معجبون بهذا.
  7. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,906
    عدد المعجبين:
    7,651
    I think the Gresley boiler contract showed the importance of proper project management. Rather than just hand the boiler over to the contractor and leave them to get on with it as they see fit, the A4 boiler overhaul was monitered as it progressed and the inevitable problems were sorted by agreement with both parties as they arose.

    Peter
     
    Hampshire Unit, jnc, 5944 و 5 آخرون معجبون بهذا.
  8. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That sounds dangerously like a practical application of common sense to me. ;)
     
    Hampshire Unit, jnc و Dunfanaghy Road معجبون بهذا.
  9. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,848
    I would not want to be on the new Llangollen Board nor one of their creditors. They have a right old mess to sort out, but let's all hope that they succeed. The squabble about the design of the new station, and the columns in particular, will have to be put aside for the time being, and can be reassessed when other matters have been resolved.
     
    lil Bear, jnc, Llwyngwern و 3 آخرون معجبون بهذا.
  10. Penrhynfan

    Penrhynfan New Member

    إنضم إلينا في:
    ‏3 اكتوبر 2013
    المشاركات:
    116
    عدد المعجبين:
    96
    الجنس:
    ذكر
    Do this type of stairlift work in the down direction without electrical power? A controlled decent of some type or hand cranking maybe?
     
  11. Crusti Boiler

    Crusti Boiler New Member

    إنضم إلينا في:
    ‏3 مارس 2015
    المشاركات:
    17
    عدد المعجبين:
    19
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn't the Corwen station squabble really a smokescreen ejected by the departed board/GM to deflect attention away from their shortcomings? Faced with a couple of years of monumental losses, the destruction of the enginneering department and now it would seem faults with the track and a bridge they probably needed something to try and divert people's attention away from the real crisis. If I was the former GM I would stop digging and look for work well away from the railway industry.
     
  12. staffordian

    staffordian Well-Known Member

    إنضم إلينا في:
    ‏27 مارس 2012
    المشاركات:
    1,524
    عدد المعجبين:
    2,172
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I must say, the cynic in me thought along very similar lines but not knowing any inside details I didn't voice those thoughts.

    Whilst Corwen might be an issue, it does have all the hallmarks of fiddling whilst Rome burns.
     
    Last edited: ‏12 نوفمبر 2020
    Monkey Magic, jnc و 35B معجبون بهذا.
  13. Thompson1706

    Thompson1706 Part of the furniture

    إنضم إلينا في:
    ‏19 نوفمبر 2007
    المشاركات:
    2,523
    عدد المعجبين:
    1,886
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here's an update for all of the doom and gloom spreaders out there :-

    Despite the cancellation of trains over Christmas it gives us a chance to complete the planned work to the Dee Bridge waybeams and a partial track re-lay in Berwyn Tunnel.
    The reason for the bridge appeal is that we had originally budgeted for partial replacement of the timbers as required, but common sense dictated that it was better to do the job in one hit.
    Our volunteers will carry on with vegetation clearance and station maintenance.
    The team at Corwen were busy this morning with removal of surplus materials stored in the new subway and doing general tidying of the site.
    The new Corwen signal box has now had its windows fitted and awaits its new stairway and timber cladding.
    The main jobs left to ready the new station for opening are ballasting, and joining up the ground frame installation once ballasting and levelling are completed. The new building and canopy have yet to be erected, although the steel frame to support the canopy within the building ,and all services are in place, the footings being ready for brickwork to start.
    We hope to open the station in Spring 2021 - coronavirus allowing !

    Bob.
     
    acorb, Hampshire Unit, Joanne Crompton و 19 آخرون معجبون بهذا.
  14. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,674
    عدد المعجبين:
    18,699
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Good news indeed, despite my nit-picking I still look forward to a trip to Corwen, indeed a trip along the whole line as I still haven't managed it thus far, avoiding Thomas has proved impossible on previous attempts! :)
     
  15. sycamore

    sycamore Member

    إنضم إلينا في:
    ‏17 أوت 2009
    المشاركات:
    596
    عدد المعجبين:
    238
    الجنس:
    ذكر
    الوظيفة:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    مكان الإقامة:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Although the Corwen station anomalies might not be everyone's cup of tea. I think we should be grateful that when the first train arrives, it will be (to all intense and purposes) to a near complete station! There are a lot of railway extensions that focus on trackwork and getting trains running - which is understandable when there are big costs to recoup, but some of the finishing touches seem to take an age to complete!!!

    Well done to everyone concerned!

    Will
     
    RA & FC, lil Bear, brmp201 و 2 آخرون معجبون بهذا.
  16. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Blaenau Ffestiniog springs to mind here.
     
    أعجب بهذه المشاركة sycamore
  17. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which side? To my mind, the ATW arrangements on the SG look decidedly less enticiing than those of the FR. Right now, of course, a chance to run anything above T-y-B would be most welcome.
     
  18. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I was thinking how many years it took to get the FR side to the state it is now after 1982.
     
    أعجب بهذه المشاركة Hampshire Unit
  19. RA & FC

    RA & FC Well-Known Member

    إنضم إلينا في:
    ‏4 اكتوبر 2007
    المشاركات:
    1,128
    عدد المعجبين:
    415
    الجنس:
    ذكر
    مكان الإقامة:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There’s also the WHR garden shed technology until finances permit for improvements. Get the railway built then improve when you can afford too worked for them, why is there so much criticism when others do that.
     
    lil Bear و ross معجبون بهذا.
  20. ross

    ross Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2017
    المشاركات:
    1,002
    عدد المعجبين:
    2,477
    الجنس:
    ذكر
    مكان الإقامة:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The new Corwen station layout is very unusual. The photographs I have seen don't really show the site properly- and it is ten years since I was at Llangollen-. How wide is the site at the top of the embankment? What were the circumstances that made the island platform the chosen solution, as opposed to, say, two tracks in a more normal layout with one platform, as in many typical terminii, or perhaps two platforms-Greenford halt springs to mind.
    I'm not implying what has been chosen is wrong, I'd just like to better understand the choice that was made.
     

مشاركة هذه الصفحة