If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LU 150

الموضوع في 'What's Going On' بواسطة Christopher125, بتاريخ ‏8 نوفمبر 2011.

  1. david1984

    david1984 Resident of Nat Pres

    إنضم إلينا في:
    ‏13 سبتمبر 2005
    المشاركات:
    12,910
    عدد المعجبين:
    1,387
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Re: LU 150 plans...

    Is there anything else availible with Vac Brakes ?, I'd imagine the battery Loco's and the Class 20's are Air only.
     
  2. Christopher125

    Christopher125 Part of the furniture

    إنضم إلينا في:
    ‏30 نوفمبر 2005
    المشاركات:
    2,846
    عدد المعجبين:
    581
    مكان الإقامة:
    Isle of Wight
    Re: LU 150 plans...

    I think at least one of the 20's is dual braked, i believe it was used for shunting the Chesham set when it arrived, but whether it could be used i'm not so sure. They've got a few days to sort out Sarah so i doubt there'll be a problem even if she has got a bit of a sore head...

    Chris
     
  3. james1983

    james1983 Member

    إنضم إلينا في:
    ‏16 جويلية 2007
    المشاركات:
    212
    عدد المعجبين:
    0
    Re: LU 150 plans...

    Picture of Met 1 from last night at Earls Court. Picture isn't brillant as it's a camera phone. I'll resize if required?

    http://railways.national-preservation.com/members/james111983-albums55-6453.jpg

    Regarding the use of Class 20's, it'll all depend on whether they are route approved for the route, which they might not be at present (I believe this to be the case). That's not to say that an application could be being worked on at present. If anything does replace Sarah Siddons it'll be a battery loco.

    James
     
  4. david1984

    david1984 Resident of Nat Pres

    إنضم إلينا في:
    ‏13 سبتمبر 2005
    المشاركات:
    12,910
    عدد المعجبين:
    1,387
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Re: LU 150 plans...

    Hopefully 12 can be sorted, but I don't see why a 20 would be an issue, if steam exhaust is acceptable, hopefully means there's a contingency just in case.
     
  5. guard_jamie

    guard_jamie Part of the furniture

    إنضم إلينا في:
    ‏7 جويلية 2008
    المشاركات:
    2,503
    عدد المعجبين:
    27
    الجنس:
    ذكر
    الوظيفة:
    Signalman
    مكان الإقامة:
    Herefordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: LU 150 plans...

    Get me a wrecking ball, a crane and we'll have 4-4-0T 23 simmering at Acton before you know it...

    Yes, yes, she'll run. She's as good as she ever was. I'll stake my living on it!
     
  6. ian14

    ian14 Member

    إنضم إلينا في:
    ‏18 أوت 2011
    المشاركات:
    338
    عدد المعجبين:
    75
    الوظيفة:
    Freelance Journalist
    مكان الإقامة:
    Northumberland and London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: LU 150 plans...

    Current central London weather forecast for Sunday is possible snow showers and icy temperatures. Might produce some interesting photos on the above ground sections.
     
  7. david1984

    david1984 Resident of Nat Pres

    إنضم إلينا في:
    ‏13 سبتمبر 2005
    المشاركات:
    12,910
    عدد المعجبين:
    1,387
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Re: LU 150 plans...

    It's rather disturbing I know what film that last paragraph is from and what part as well ;)

    Not that I'm starting a "steam it bandwagon", but what sort of mechanical condition is 23 in ?, is it totally knackered and just given some fresh paint, or was it given the full monty prior to display ?.
     
  8. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,836
    عدد المعجبين:
    22,279
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: LU 150 plans...

    Any forecast for the sub surface sections?
     
  9. james1983

    james1983 Member

    إنضم إلينا في:
    ‏16 جويلية 2007
    المشاركات:
    212
    عدد المعجبين:
    0
    Re: LU 150 plans...

    Bring the pannier from tyseley!
     
  10. david1984

    david1984 Resident of Nat Pres

    إنضم إلينا في:
    ‏13 سبتمبر 2005
    المشاركات:
    12,910
    عدد المعجبين:
    1,387
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Re: LU 150 plans...

    Thick Fog ;)
     
  11. Wenlock

    Wenlock Well-Known Member Friend

    إنضم إلينا في:
    ‏26 اكتوبر 2008
    المشاركات:
    2,114
    عدد المعجبين:
    1,368
    الجنس:
    ذكر
    الوظيفة:
    Bus Driver
    مكان الإقامة:
    Loughton Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: LU 150 plans...

    ISTR that before the "Steam on the Met" more than 20 years ago, QRS were asked to assess 23 for potential return to steam. LTM decided it was not economically feasible. Don't unfortunately have details of what faults were found.
     
  12. james1983

    james1983 Member

    إنضم إلينا في:
    ‏16 جويلية 2007
    المشاركات:
    212
    عدد المعجبين:
    0
    Re: LU 150 plans...

    Just to follow up on a post re engineering works. There's a block on the east end of the district line all weekend which may include c2c whilst we renew drainage down at elm park. If its the same as before district line should be starting from barking.

    James
     
  13. Christopher125

    Christopher125 Part of the furniture

    إنضم إلينا في:
    ‏30 نوفمبر 2005
    المشاركات:
    2,846
    عدد المعجبين:
    581
    مكان الإقامة:
    Isle of Wight
    Re: LU 150 plans...

    Just found this from last night - Sarah Siddons pulling into Baker Street, then departing with a hefty shove from No1.

    Chris
     
  14. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    36,449
    عدد المعجبين:
    9,910
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: LU 150 plans...

    First time I've seen the full rake clearly, don't those coaches look stunning.
     
  15. campainr

    campainr Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2009
    المشاركات:
    1,398
    عدد المعجبين:
    53
    Re: LU 150 plans...

    "That's more like it!" ;)
     
  16. jonathonag

    jonathonag Well-Known Member

    إنضم إلينا في:
    ‏11 ماي 2006
    المشاركات:
    1,626
    عدد المعجبين:
    3,142
    الوظيفة:
    Railway Engineer
    مكان الإقامة:
    Cowdenbeath
    LU 150 plans...

    So, time to contact TfL/LU in regards to running an early hours photo charter? *Sarcasm with hints of I wish....*
     
  17. Deepgreen

    Deepgreen Well-Known Member Friend

    إنضم إلينا في:
    ‏30 جويلية 2010
    المشاركات:
    2,099
    عدد المعجبين:
    1,403
    الجنس:
    ذكر
    الوظيفة:
    Early retirement! (Ex-Business Improvement, LU).
    مكان الإقامة:
    Gomshall, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: LU 150 plans...

    Seeing the video of the dress rehearsal at Baker Street really brings home the magnitude of this series of trips - NR baulks at wooden stock, and slam doors without locks, but here we have an organisation that is exceedingly mindful of fire risks, yet it can see its way to allowing a steam loco to work hard underground, pulling wooden stock with non-lockable (I assume) slam doors! On top of this, all the stations' fire detection equipment (and there is lot of it) will have to be isolated for each trip, generating quite a bit of work for staff and engineers. It's a testament to proper, sensible risk assessment and top-level management who are both effective railway managers and fully aware of the importance of heritage and public interest being part of the railway world. Well done to all, and fingers crossed for a hitch-free operation.
     
  18. richards

    richards Part of the furniture

    إنضم إلينا في:
    ‏1 اكتوبر 2008
    المشاركات:
    4,708
    عدد المعجبين:
    2,083
    الجنس:
    ذكر
    مكان الإقامة:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: LU 150 plans...

    Well said.

    What I can't understand is how they isolate the fire detection equipment and keep the stations open. But I'm happy not to know, and enjoy the show. Looking forward to seeing it on Sunday morning.

    Richard
     
  19. SillyBilly

    SillyBilly Member

    إنضم إلينا في:
    ‏19 ماي 2007
    المشاركات:
    512
    عدد المعجبين:
    6
    الوظيفة:
    Student
    مكان الإقامة:
    Penrhyndeudraeth
    Re: LU 150 plans...

    It even looks like the steam heat is on!

    The doors are lockable, just not centrally, in the videos it does look like they aren't locking them.
     
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,803
    عدد المعجبين:
    64,498
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re: LU 150 plans...

    I very much doubt they would lock the doors externally: wasn't that a contributary cause of so many deaths at the Versailles train fire in the nineteenth century, after which the practice was outlawed? If you (God forbid) had a fire in the tunnel, you'd want to be able to open doors to get out. The Met carriages have rounded tops to the doors so they can be fully opened even in a tube tunnel.

    Tom
     

مشاركة هذه الصفحة