If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Oswestry Update

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة ilvaporista, بتاريخ ‏13 أوت 2010.

  1. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,733
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I thought it lasted into the 90s - I remember a trip being advertised after privatisation with 31s which then got cancelled.
     
    أعجب بهذه المشاركة Martin Perry
  2. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,455
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    The last movement over the crossings I know of was a visit by a weed killing train in April(?) 1993. There was talk of further movements but so far as I know no other loco used the crossing
     
    أعجب بهذه المشاركة Martin Perry
  3. Vulcan Works

    Vulcan Works Member

    إنضم إلينا في:
    ‏12 إبريل 2018
    المشاركات:
    266
    عدد المعجبين:
    745
    الجنس:
    ذكر
    مكان الإقامة:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’ve always thought Britannia Bridge is a pragmatic and perfectly workable solution and it shows what can be achieved when a Highway Authority is (eventually) on board.

    There’s no such thing as starting discussions too early in my experience, but the initial pitch is crucial as is understanding the legislation they operate under and pre-empting their questions and concerns.

    It sounds like the Oswestry team is already making good strides with stakeholders. As we know from examples on other railways, there are some impressive solutions being progressed that in the past would have been deemed too complex or expensive to undertake. A couple of A roads are a big barrier but not an impossible barrier!
     
    jnc و echap معجبون بهذا.
  4. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,455
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    Thanks to CHR Facebook here is the new arrival waiting to be unloaded.
    200901040_4013402868713223_6377488022281360562_n.jpg
     
    Martin Perry, brmp201, jnc و 1 شخص آخر معجبون بهذا.
  5. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,849
    Thanks for asking. I was wondering myself, when watching a video of a train crossing there soon after reading the latest about the WSR's level crossing business.
    Edit: minor corrections
     
  6. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,455
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    The A5 has long been identified as a route that needs to be upgraded. There are long term plans to dual the section where the level crossing is and at that point a bridge should be installed.
    The A483 as a feeder road would also be upgraded and again a bridge over the railway should be possible as part of the improvements. As mentioned to have everyone onside and involved early is key. CHR is working very hard behind the scenes with all stakeholders to make sure that when the time comes the railway is an integral part of the plan and not something that comes out of the woodwork at the last minute.
     
    jnc, Paul42, 30854 و 2 آخرون معجبون بهذا.
  7. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be good if that happens but I would anticipate a lot of resistance from the road building side; the terrain is pretty flat at both crossings and it would need big embankments to cross the railways ...
     
    أعجب بهذه المشاركة jnc
  8. Thompson1706

    Thompson1706 Part of the furniture

    إنضم إلينا في:
    ‏19 نوفمبر 2007
    المشاركات:
    2,523
    عدد المعجبين:
    1,886
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From a safety point of view a bridge over the railway one hundred yards or so before a roundabout could lead to problems with northbound traffic, given the density and speed of the traffic.

    Bob.
     
    jnc و Martin Perry معجبون بهذا.
  9. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could a "half and half" solution of low bridge/shallow cutting be an answer? Material from the cutting could be used for embankments.
     
    The Dainton Banker و Martin Perry معجبون بهذا.
  10. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A sensible soumding suggestion, but one that would depend on the height of the water table and any likihood of flooding in the immediate area. I've no feeling for how the costs of a cutting / embankment might compare with those of a road embankment only.
     
    أعجب بهذه المشاركة jnc
  11. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The A5 crossing would possibly be better achieved by a ‘Rail over’ bridge but the A 483 is made more complex by the proximity to Weston Wharf.


    Sent from my iPhone using Tapatalk
     
    أعجب بهذه المشاركة black5
  12. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which begs the question, what is the ruling gradient on the entirity of the route CHR have their sights set on? Any significant increase would obviously affect decisions surrounding future operations.
     
  13. daveb

    daveb Member

    إنضم إلينا في:
    ‏5 سبتمبر 2005
    المشاركات:
    945
    عدد المعجبين:
    484
    الجنس:
    ذكر
    مكان الإقامة:
    Wimborne, Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suppose it depends on what any A5 upgrade would involve. If the plan is to duel the road (as has happened elsewhere, e.g. the Nesscliffe bypass section), it would make sense to build proper junctions, with the A5 on a flyover and the roundabout beneath. If this were to happen here, the A5 could be raised to a height to clear the railway and stay at that height to clear the roundabout too. There should be room to build the slip roads between the railway bridge and the roundabout.
     
    jnc, echap و black5 معجبون بهذا.
  14. hoffman

    hoffman New Member

    إنضم إلينا في:
    ‏7 أوت 2016
    المشاركات:
    52
    عدد المعجبين:
    53
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Traffic getting that close to a roundabout should already be preparing to slow down. A small reduction in the speed limit might help too.
     
  15. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Nesscliff bypass roundabouts do not have any flyover sections.
     
    أعجب بهذه المشاركة 35B
  16. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure - perhaps @ilvaporista can advise? I don't think there is much significant until after Llynclys?
     
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,798
    عدد المعجبين:
    64,468
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    30854 و Martin Perry معجبون بهذا.
  18. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What would be the expected clearance lf Rail was under the Road?
    Network rail policy is to go for maximum clearance no matter what the prospect of needing it is.
     
  19. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,733
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As is being used at Leighton Buzzard?
     
  20. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And as was also done constructing the early stages of the Dduallt spiral.
     

مشاركة هذه الصفحة