If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rail connected

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Reading General, بتاريخ ‏24 أوت 2014.

  1. Robin

    Robin Well-Known Member Friend

    إنضم إلينا في:
    ‏7 ماي 2012
    المشاركات:
    1,472
    عدد المعجبين:
    1,917
    مكان الإقامة:
    Stourbridge
    Stretching a point, Appleby Frodingham is classed as a heritage line in the Wiki list. Surely a frequently used connection there. Not many incoming railtours though.
     
  2. kestreleyes

    kestreleyes Well-Known Member

    إنضم إلينا في:
    ‏4 اكتوبر 2007
    المشاركات:
    1,313
    عدد المعجبين:
    936
    الوظيفة:
    signal engineer
    The section on our side is signalled from us to NR but permission to go forward is via the divisible staff key method which I believe is unique now for this type of operation

    Technically permission from NR to us is via agreement and possession of the divisible and / or PR staff depending on what's required
     
  3. philw2

    philw2 Member

    إنضم إلينا في:
    ‏30 إبريل 2011
    المشاركات:
    494
    عدد المعجبين:
    86
    Will Peak Rail be the first Heritage Railway to be network-connected at both ends?
     
  4. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    See comments about the Ffestiniog / Welsh Highland
     
  5. Autotank

    Autotank Member

    إنضم إلينا في:
    ‏25 نوفمبر 2005
    المشاركات:
    555
    عدد المعجبين:
    130
    الجنس:
    ذكر
    الوظيفة:
    Radio Producer
    مكان الإقامة:
    Berkshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes we run on NR land at Cholsey - the boundary is the 10mph board near the top of Cholsey bank (http://www.cholsey-wallingford-railway.com/images/Martello3.jpg). The run-round loop and the siding adjacent to the up relief the other side of the overbridge are all on NR land which we rent.

    You'll note in this picture how close we get to the 100mph up relief line - http://www.cholsey-wallingford-railway.com/images/Ivor093.jpg. There isn't enough clearance for a fence which can be a bit of a pain.
     
  6. gwr4090

    gwr4090 Part of the furniture

    إنضم إلينا في:
    ‏8 أوت 2005
    المشاركات:
    2,847
    عدد المعجبين:
    222
    الجنس:
    ذكر
    الوظيفة:
    Scientist (Rtd)
    مكان الإقامة:
    Dorset
    The West Somerset Railway connection with Network Rail was used over 700 times in 2013, nearly all for freight trains. On one memorable day we had three freight trains operated by three different Freight companies using 5 different Class 66s all on the line at the same time, due to snow and ice causing delays on the mainline.

    This year we have also had over 30 or so passenger train movements including visiting railtours and FGW units. I've lost count of the stone trains, plus the NR engineering trains of various types which come in to be turned on Norton triangle.

    David
     
    Last edited: ‏4 سبتمبر 2014
  7. marshall5

    marshall5 Part of the furniture

    إنضم إلينا في:
    ‏26 اكتوبر 2010
    المشاركات:
    2,521
    عدد المعجبين:
    4,359
    مكان الإقامة:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My money would be on the Bluebell beating them to it with the planned connection at Ardingly but I'm not holding my breath. Ray.
     
  8. Wenlock

    Wenlock Well-Known Member Friend

    إنضم إلينا في:
    ‏26 اكتوبر 2008
    المشاركات:
    2,114
    عدد المعجبين:
    1,368
    الجنس:
    ذكر
    الوظيفة:
    Bus Driver
    مكان الإقامة:
    Loughton Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    EOR. Just had a letter today from LUL about the nearby works this weekend. Says the engineering vehicles will be loaded to rail at North Weald, the connection must now be permanent then?
     
  9. ADB968008

    ADB968008 Guest

    Technically (very technically and probably out of date now anyway), but for many years the ELR had a connection to Metrolink at Buckley Wells, and until very recently there was unused point work connecting the Bury Line to the BR line on the bank out of Manchester Victoria ...
    I did say technically..:cool:
     
  10. Kingscross

    Kingscross Member

    إنضم إلينا في:
    ‏19 اكتوبر 2009
    المشاركات:
    853
    عدد المعجبين:
    559
    الجنس:
    ذكر
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I know it's not connected at the moment, but would the Plym Valley be able to reconnect easily? Could prove a useful servicing facility for mainline steam to Plymouth if there was a connection.
     
  11. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bit in the Beano concerning the re -connection of the Embsay and Bolton Abbey to the Grassington Branch and thence to skipton.... £2.6 Million
    Guessing that most of this is to do with signalling and control rather than a few metres of track and a set of points...
     
  12. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There would also need to be track realignment work at Skipton in the platform.
    When we remodelled Skipton for electrification in 1994 the track was deliberately designed to give greater clearance away from the platform.
    Not impossible to correct though.
    Along with bringing back the platform and subway into a decent condition.
     
  13. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    Its severed now at Buckley Wells but was used on many occasions for contract work and memorably an early hours trip with msc 32 Gothenburg to Manchester with a brake van in tow. It was in Thomas guise so startled many a late night reveller leaving the clubs of north east Manchester. Great fun!
     
  14. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that the elevation chosen for their platform would preclude any reconnection with the main line.
     
  15. rhf19

    rhf19 New Member

    إنضم إلينا في:
    ‏13 ماي 2006
    المشاركات:
    85
    عدد المعجبين:
    9
    The Buckley Wells link is still there and is used regularly, the last being about two weeks ago when T68 1003 was moved onto ELR metals by the SPV. This returned to Metrolink a couple of days later.
     
  16. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    Good to hear. It seemed daft to have the connection undone.
     
  17. Pesmo

    Pesmo Member

    إنضم إلينا في:
    ‏26 ديسمبر 2008
    المشاركات:
    817
    عدد المعجبين:
    125
    I am quite excited at the prospect of Embsay and Bolton Abbey possibly getting access to Skipton and maybe even occasionally the line to the Quarry which is no short distance. It goes through some lovely scenery towards Threshfield & Grassington and the track always seems to be in excellent condition.
     
  18. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is a lovely line, ive never seen one of the quarry services actually running on it from Swinden Quarry but clearly they still do.
    I should maybe check out RTT to see when they run, good to see bulk goods on the rails and not the Roads
    Maybe one day some accomodation to use the line with a small halt at Cracoe and a runaround in the quarry sidings might come to pass...
     
    أعجب بهذه المشاركة 26D_M
  19. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ridden over the Grassington branch many times in a tamper.
    The line has just about been fully relaid between 1995 and 2003, nearly all in CWR.
     
  20. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,416
    عدد المعجبين:
    1,681
    Didn't 75014 do a charter on the branch or is that a dream of mine?
     
    أعجب بهذه المشاركة Gav106

مشاركة هذه الصفحة