If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,857
    عدد المعجبين:
    1,655
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Everytime I look into Tornado I learn something of interest, the kind of bearings used on the tender being the latest example. Lets hope Mr Elliot's good news makes the copy deadline for the Beano...
     
    Last edited: ‏9 أوت 2018
  2. Arun Valley

    Arun Valley New Member

    إنضم إلينا في:
    ‏1 اكتوبر 2015
    المشاركات:
    47
    عدد المعجبين:
    96
    الجنس:
    ذكر
    مكان الإقامة:
    West Sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    S.A.C. Martin, Sheff, green five و 2 آخرون معجبون بهذا.
  3. 60835

    60835 Guest

    There we go - the good news David Elliott alluded to earlier this week :)
     
  4. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So at last it all seems to be leaking out that when Tornado decided to throw pieces of its inside motion all over the ECML four months ago, maybe that was the result of rather more than 'just' a lubrication issue. It is indeed very good news that things seem to be coming together but rather worrying that it appears the forensic examination of the locomotive has revealed separate (or related) issues with the motion, otherwise why would so much work appear to have been taking place since the incident?

    No doubt the report when it is released will reveal all or all we are permitted to know. There's a bit of me that continues to hope this failure turns out to be something simple rather than something more complicated such as mechanical or structural damage caused by the 100 mph thrash that remained hidden until this April. Either way, the important thing is whether there is any transferrable learning that can be of value to other main line locomotive owners. If it's just the A1ST that needs to refine its build and maintenance regime then so much the better as at least they will be able to move forward more confidently with their other project.
     
    Greenway و jnc معجبون بهذا.
  5. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    493
    عدد المعجبين:
    936
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And the next hare starts running!
     
    Greenway و The Green Howards معجبون بهذا.
  6. 240P15

    240P15 Well-Known Member

    إنضم إلينا في:
    ‏1 ديسمبر 2017
    المشاركات:
    1,603
    عدد المعجبين:
    1,593
    الجنس:
    ذكر
    مكان الإقامة:
    Norway
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not me, I`m hibernate:D
     
    Spamcan81 و The Green Howards معجبون بهذا.
  7. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,424
    عدد المعجبين:
    12,626
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But you've now missed Summer,:) ok you didn't miss much # steam ban
    Now onto Tornado , All parts made have been to what ever modern spec material is a direct replacement to what was originally specified , and as such I would say is beyond anyone's control , if x spec isn't available, but the modern equivalent is, and on paper and under test performs to the same parameters then surely you would use it, what happened was unforeseen but now we are where we are, the question though is, had the drop link not failed like it did, how much worse would the damage had been? see some parts may be designed to fail in that way to prevent more severe damage to the rest of the motion ?
     
    أعجب بهذه المشاركة Johnb
  8. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,941
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Do you mean the combination lever?
     
  9. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,996
    عدد المعجبين:
    5,922
    What do you see to that effect in this latest report? They had already mentioned finding something wrong (cracking?) in one of the bits of the outside valve gear, hence needing to replace that as well, but there is no connection between that and the seizing of the inside valve.
     
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,424
    عدد المعجبين:
    12,626
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :oops::oops: yes mental block , yes combination lever but when you look at any valve gear / motion, there are always parts that will in the extent of an major failure of the moving parts will deflect or fail before the engine tears its self to bits, not withstanding rods deciding to dig into the ballast and pole-vault the loco into the station canopy
     
  11. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,941
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Aren't you forgetting that heavy maintenance work was carried out on the loco between the 100 mph event and April?
     
    S.A.C. Martin و Sheff معجبون بهذا.
  12. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, but what they are talking about now seems unlikely to have been picked up on maintenance, heavy or not. However, apparently I've started a hare running and that was not the intention so I'm off back into the burrow.
     
  13. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    4,874
    عدد المعجبين:
    3,191
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    If any organisation is going to give a full uncensored report, I would put A1ST at the head of the list.

    They have nothing to hide, they will learn from it, and build back towards the goal of 90mph running, I am sure.

    I can imagine its a complicated series of events that have transpired to cause the failure, and we should await the official report.
     
    Johnb, S.A.C. Martin, MarkinDurham و 2 آخرون معجبون بهذا.
  14. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,857
    عدد المعجبين:
    1,655
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Be nice for the NVR if shes running-in 2nd/3rd September (Their pacifics event), nicer still if its the week before as im passing to drop in, but that's a bit hopeful...
     
  15. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,133
    عدد المعجبين:
    8,693
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It'd make up for the absence of 61306...
     
  16. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,021
    عدد المعجبين:
    3,808
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    242 pages, so this may have been asked and answered before.
    Why is it necessary to achieve 90 mph? Is 80 mph. not a reasonable speed?
     
  17. sycamore

    sycamore Member

    إنضم إلينا في:
    ‏17 أوت 2009
    المشاركات:
    597
    عدد المعجبين:
    238
    الجنس:
    ذكر
    الوظيفة:
    Guard & Signalman (E&BAR) / Driver (HVMR)
    مكان الإقامة:
    Embsay or Bolton Abbey, sometimes in between...
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably not worth the extra paperwork for just 5mph over the current max. Though you could argue if an extra 15mph is!
     
  18. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,658
    عدد المعجبين:
    1,571
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What a daft question, it was clearly just to show off! There is no substantive reason whatsoever to run the loco at 90, it’s all just for vanity points!
     
  19. D1002

    D1002 Resident of Nat Pres

    إنضم إلينا في:
    ‏25 إبريل 2011
    المشاركات:
    9,956
    عدد المعجبين:
    7,638
    الجنس:
    ذكر
    مكان الإقامة:
    Enfield
    Makes it easier to find paths for her on the busy UK Mainline, particularly the ECML.
     
    jnc, ross و 240P15 معجبون بهذا.
  20. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,133
    عدد المعجبين:
    8,693
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pathing in an increasingly faster and busier railway.

    Ah - post crossed with @D1002

    The ECML is now so busy they had to upgrade the Lincoln line to Peterborough to get the freight off the ECML after years of the Lincoln line being just a six-day, sixteen hour railway.
     
    ross و Greenway معجبون بهذا.

مشاركة هذه الصفحة