Perhaps you "might think" correctly. That seems to be the direction of travel. If that is indeed the case, then in future the P2 will be shipped...
Just to add for clarification: completion of the first of the new boilers, which was planned for fitting to Tornado, was delayed due to Covid. It...
The plan is (or was) to build a prototype of one side of the valve gear, then test that extensively under real-life heat and stress conditions to...
David did do precisely that. Before he died he spent a lot of time leaving them a "brain dump" so that all of his knowledge and work would not be...
That was written a long time ago. There has been considerable "mission creep" since those days.
As a long time covenantor and sponsor of "clubs", I've been as disappointed as anyone about what has been going on with the Trust, but let's cut...
What dates are the driver experiences with FS? No longer on NVR website since sold out.
Seriously?? 1.5 INCHES?
The culture there could not be more different from the days of Mark Allatt who saw every possible communication as an opportunity.
Has anything leaked out about the nature of the failure and whether it's serious?
The P2 (if it eventually runs) is seen as a hauler, not a racehorse like Tornado. If my memory is correct, the late David Elliott once told me...
As a covenantor to both locos and a past subscriber to several "clubs" to a value of several thousands, it somehow does not seem right that I am...
Likewise here. No email received and the messages were not on the website last night.
I think there has been so much disappointment, lack of clarity, obfuscation, bluster, etc. surrounding both of the Trust's locos that we need to...
A successful background in setting up and managing railway museums, not building or operating locomotives. The locos seem to feature less and less...