Only to find ways to attract A LOT more customers, And/or take out a lot of costs.
I think what tends to happen is that general problems get discussed with a specific line as exemplar. I think you’re right that the Moors is not...
It is of course entirely possible to move to a better financial situation by charging a higher price and accepting a lower volume of sales. It...
The price you can charge per mile tends to drop the longer the railway gets, but the costs overall tend to go up, and even though the cost per...
What choice do they have though for the moment? To your other point I hope that some serious market research is being done. I am going to go...
Not really sure that the distance from a centre of population is all that relevant. The FR for example? What is relevant is how well a railway...
I’m not sure this is entirely fair to the ERPS. Nor am I sure why you think ERPS won’t consider the idea? And finally, it would also require ULS...
I have. Didn’t like them much either! :)
If you mean on 506 then no, the work is not so extensive as to enable that. That boiler will require a fairly significant overhaul next time, so I...
It’s a not uncommon effect. Personally I think the way in which charity accounts are presented doesn’t achieve the stated aim of aiding an...
Thanks to @Jamessquared I think picture starts to emerge. - inflation has driven costs up since covid, 20%+ is what we all suffer - overall the...
How much of the jump in staff costs is due to the significant effect of inflation since 2020? Two questions, how has the average number employed...
The slips, trips and falls get to be considerably more likely. How tall is the parapet, after the bridge is ballasted? Is the amount of...
Not once it is an operational railway
There is only one answer - the length that provides the best balance between the numbers that can be attracted to it and the cost to maintain and...
I think that that would be immediately rejected by the planners as it doesn’t fit with their policy for reinstatement of the original line. A new...
I hope they can afford them.
I think that the gap is wider (or ought to be) between the LBBC and LBRT. The overlap between LBRT and CIC is understandable and largely...
I have been advised more than once that re-erecting even a basic steel portal frame building often works out more expensive than building new....
Duplicate post
Separă nume cu o virgulă.