Looks about the size of those found on minor underbridges. Not Culverts.
You should try a run in a 4 wheel vehicle.:)
From the infrastructure plan : 1300 metres to renew in FB G44 CWR between MP 9.75 and 10.5 ( aka the gap) Planned completion by 18 Feb Welding,...
Here we go again. inter works 2023 have begun. G44 Concrete Sleepers continue to arrive in the yard and then they are prepared. Before being...
No sooner than I post the notice I have to withdraw the event due to another booking. We will redate the talk and I will let you know.
In case you are at a loss as to how to fill an afternoon on the 11th of Jan with additional Cake support.. York Area Group are hosting a talk on...
Just going through a variety of Pre Grouping Railway Company drawings and many have a clear formation width of 30ft. Seems preferable as a figure...
Minimum width would be derived from:- Cess to Running Edge = 1.625 Minimum, desirable to be plus 0.3m wider Rails RE to RE = 1.435...
Don't you use Brushes then? Do they give a better finish?;):)
Now, what about Water troughs?:):) Or new build Compounds?
Should No 14 have a cabside number bearing in mind it is Copper Capped? :):)
If the development goes ahead. Which I hope it doesn't. How long before the first noise complaint against the railway? It wont matter who was...
We have big 29 and little 29 on the NYMR
Wouldn't a comparison with an Australian version be more appropriate? 6029 NSW standard gauge.
Shades of James Bond. Which film was it when they used this?
Decent mention on C5 Days out with Susan Calman the other day.
Would @Steve have any comments on WC / BB use on the Moors?
Nearly a year since the last update. In some cases no change and others have made significant progress. Just to remind everybody this is about the...
Is this to do with the site being a potential Spaceport? Wasn't there a delivery last week of a booster or something. Found it....
Nice to be appreciated. Thanks and for all your comments on life on the hill.
Separă nume cu o virgulă.