My exact point. There should be a non stop service. Oil workers? There isn't any other economic activity here? Such a service would also cut the...
Iv wondered this myself recently. Stonehaven, Montrose, Arbroath, Leuchars are all stops that are busy but not having them would allow the...
This will highlight an already slightly odd situation. 400 miles KGX-WAV will be covered in 4 hours. Average 100MPH 130 miles WAV-ABZ will be...
So what you are saying is that in all likelihood an Azuma north of Edinburgh is going to be slower than the current 125's and the timetable may...
This is my worry. If Azumas just don't have the grunt to keep time over the Aberdeen to Edinburgh section the London journey could see no time...
Not surprised by this. The Scotrail alliance is under intense political pressure to get its act together on punctuality. Non timetabled trains...
Does anyone have any idea if the last 125 runs for Aberdeen are booked in? I can imagine the last Northern Lights going north and Final KGX from...
What a great write up, thanks for that! Shame the trips have booked stops at Carnoustie because that’s a real flyer of a section with a through...
So did Tornado take the diesel along today then? Hearing she is running behind schedule.... What was the last machine to go over the Aberdeen...
Waaaayyyy off topic but its interesting. I can see Calton and the east getting the work you describe, isn't that already being talked about...?...
Or to put it another way, Bring back the Cally.
Ah OK, looks good. Was the non-fitting component made pre-model creation?
A geometrically accurate as drawn assembly model (CAD) of the Loco would highlight any "mis-drawn" components pre-manufacture.
For anyone that's been on one, are they better than the HST or Elecra's? Will those seats be tolerable for the 7 hour run to Aberdeen?
Coming together really nicely. Standard of work looks first class.
Might have asked this before, but has this point been rectified? Got to work to at minimum a comprehensive set of DWGS, and it is now easily...
The three bids received were excellent and the decision to award the contract to PRCLT was because they scored most highly on our set criteria...
I agree with that interpretation. It stands to reason that if you can make one to spec/commercial requirements you can do 2!
Just reading the Patriot project update "No sooner had we moved in, a phone call was received from the operators of 60163 'Tornado' who were...
Surely tariffs would only be enforceable on PO's placed after the fact?
Separă nume cu o virgulă.