If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Betton Grange

Discuție în 'Steam Traction' creată de Broomhalla, 22 Feb 2009.

  1. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    http://www.networkrail.co.uk/Use-of-standard-gauges.pdf

    This seems to be a reasonably introduction to gauging on the mainline, especially fig 2 on page 8.

    It seems that the below solebar level, under 1m above the railhead is the most problematic area, which is of course where outside cylinders come.

    *If* I've done my reading and sums right the standard for this area is now 2700mm (~ 8'10 3/16"?) and the paper suggests its better to work to 2650mm (~ 8'8 1/4" ?)

    So its little wonder Halls and Manors are having gauging troubles.

    Thanks andalfi for the typo spot!
     
    Last edited: 9 Apr 2014
  2. andalfi1

    andalfi1 Well-Known Member

    Înscris:
    5 Noi 2008
    Mesaje:
    1.007
    Aprecieri primite:
    466
    Sex:
    Masculin
    Ocupație:
    Semi Retired.
    Locație:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Slight error on the 2650mm dimension, it is over 2" wider at 8' 8.21/64" give or take a few thou.
    Andy
     
  3. lil Bear

    lil Bear Part of the furniture

    Înscris:
    11 Dec 2006
    Mesaje:
    6.136
    Aprecieri primite:
    1.700
    Sex:
    Masculin
    Ocupație:
    Railway Technician
    Locație:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  4. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I just found the original reference in AE Durrant's 'Swindon Apprentice'

     
    jnc apreciază asta.
  5. RA & FC

    RA & FC Well-Known Member

    Înscris:
    4 Oct 2007
    Mesaje:
    1.128
    Aprecieri primite:
    415
    Sex:
    Masculin
    Locație:
    Gogledd Cymru
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What about the big yellow link button on the home page, that goes straight to the cylinder appeal information?? Not that well hidden.
     
  6. lil Bear

    lil Bear Part of the furniture

    Înscris:
    11 Dec 2006
    Mesaje:
    6.136
    Aprecieri primite:
    1.700
    Sex:
    Masculin
    Ocupație:
    Railway Technician
    Locație:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wasn't there when I posted :D

    Article promoting the 200 Club now in Heritage Railway Magazine. Apparently we've nearly got 25% take up already for this appeal, which isn't too bad considering it's only been public less than a month! Anyone else wanting to help build the final major component for the loco please do support this appeal.
     
  7. Just_Sayin

    Just_Sayin New Member

    Înscris:
    18 Dec 2011
    Mesaje:
    121
    Aprecieri primite:
    59
    Ocupație:
    Technician
    Locație:
    Points of view
    Bit of a confusion coming out over the cylinder Appeal.

    Railway Press saying £20k raised and cylinder pattern ordered, but then comments on the 6880 Facebook Page saying Appeal still open as funds still required.

    Has the target been met, or are you still looking for 200 Club members?
     
  8. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is a bit of a gap in between ordering the pattern and having finished cylinders ready to use.
     
  9. Gav106

    Gav106 Well-Known Member

    Înscris:
    29 Mar 2010
    Mesaje:
    1.772
    Aprecieri primite:
    2.170
    Locație:
    Nantwich, Cheshire
    Screenshot_2014-09-06-20-30-17.png
    Sorry. Im getting even more confused every day.

    From what was said on facebook a while back the 20k was for the pattern, casting, and machining cost. Which was reported in a magazine that it was fully reached. Cant remember which. Then i asked about that on facebook as to which was correct as the facebook page said it was still needing funds for the 20k. That was a couple of months ago. Then during this week someone asked if they were still fund raising to which they replied no as my attached pic shows. So this is what is confusing people. And im presuming thats what just_saying is reffering to.
     
  10. Bacofoil

    Bacofoil New Member

    Înscris:
    4 Ian 2013
    Mesaje:
    16
    Aprecieri primite:
    2
    Ok let's clear the confusion, if you read the Facebook information posted above it is stated "no "to the question are you close to or reached £20k. It was also stated donations welcome . I am sure everyone will agree until a loco is complete groups will continue to fund raise. The press is correct in saying the cylinder patterns have been ordered
     
    Martin Perry apreciază asta.
  11. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But just increasing the Steam chest volume without increasing the valve size or the steam pipe isn't all that effective...The trend of increasing the relative dims all these items plus the exhaust passages had reached the other 3 pre nationalisation.

    Good luck with those cylinders Grangers
     
    Last edited: 6 Sep 2014
  12. Gav106

    Gav106 Well-Known Member

    Înscris:
    29 Mar 2010
    Mesaje:
    1.772
    Aprecieri primite:
    2.170
    Locație:
    Nantwich, Cheshire
    100% agree with you Liz about fund raising until the project is complete. And then you have to keep on fundraising. No one will ever complain about a project that does that. Its good work.

    But people were/have been confused about the fact that an article that appeared in one of the magazines stated that the 20k for that part of the project had been raised. Which may i add is great news and well done, but then your now saying it isnt raised quite. Which is also fine. But it cant be both... so if its filled up and any additional money will be spent on something else say that. In fact if it is full and you state that you now want to fill £xxx to pay for the fitting of the cylinder by Llan engineering then say that. But people are only questioning when there is a bit of confusion.

    Well done either way and it will be nice to see the Grange get its final large casting required before steaming (i think im right in saying that, if not and there is something else missing i apologise)

    Gav
     
  13. mike redditch

    mike redditch New Member

    Înscris:
    23 Apr 2012
    Mesaje:
    64
    Aprecieri primite:
    2
    Seems a little bit typical grange, it has a lot of potential but gives face of a poorly run project.

    It has always fallen well behind the tornado, patriot and 3mt projects in its publicity, project updates etc
     
  14. andalfi1

    andalfi1 Well-Known Member

    Înscris:
    5 Noi 2008
    Mesaje:
    1.007
    Aprecieri primite:
    466
    Sex:
    Masculin
    Ocupație:
    Semi Retired.
    Locație:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As someone who has absolutely nothing to do with the Grange, or any other 'western region' project for that matter, it would seem to me that you have an axe to grind here, as I see it, progress on this loco has been relatively quick, which proves they have their priorities in the right area, so why not offer YOUR services in the publicity department for this loco and show them how it SHOULD be done, instead of moaning !
     
    Last edited: 7 Sep 2014
    lil Bear și jnc apreciază asta.
  15. JMJR1000

    JMJR1000 Member

    Înscris:
    27 Iul 2009
    Mesaje:
    844
    Aprecieri primite:
    699
    Sex:
    Masculin
    Locație:
    Cleethorpes
    It's unfortunately a common trend these days, whereby people seem to have forgotten about contructive criticism, i.e. actually giving suggestions on how their gripe with the issue can be solved, instead of just moaning for seemingly little reason other then the sheer sake of it.

    A persistant trend I do find rather irritating...
     
    Sheff, Martin Perry și andalfi1 apreciază asta.
  16. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Înscris:
    9 Sep 2013
    Mesaje:
    10.674
    Aprecieri primite:
    18.700
    Sex:
    Masculin
    Locație:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It sounds like it could be the magazine's fault, author will have heard that cylinders are being ordered, cylinder appeal aim is £20,000 ego they must have raised the full amount, which isn't necessarily the case, as it presumbly is here, in that the ylinders have been ordered but the costs haven't been raised yet? I think a similar error was made a while ago for Bridges to Broadway, speaking of which, maybe Betton Grange for reopening to Broadway as Toddington Grange? :D Excellent work, I've only just got round to looking at this project properly after only being vaguely aware of it, I would say that perhaps the publicity could be a little better, I suppose as it's not a "proper" new build maybe it hasn't attracted quite the excitement that others have? Either way, still amazing stuff, carry on the good work! :)
     
  17. lil Bear

    lil Bear Part of the furniture

    Înscris:
    11 Dec 2006
    Mesaje:
    6.136
    Aprecieri primite:
    1.700
    Sex:
    Masculin
    Ocupație:
    Railway Technician
    Locație:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    First cylinder now cast...

     
    MatthewCarty, Bacofoil și Martin Perry apreciază asta.
  18. 242A1

    242A1 Well-Known Member

    Înscris:
    3 Dec 2006
    Mesaje:
    1.561
    Aprecieri primite:
    1.304
    Are you sure about that? (Valve size increase vs undesirable increase in clearance volumes - for one consideration)
     
  19. MatthewCarty

    MatthewCarty Guest

    Is the plan to have both cylinders cast by SSS4?
     
  20. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that the plan is to have them installed?
     

Distribuie pagina asta