    According to the NNR website Tornado will not be ready to fulfil her commitments at the NNR at the end of May.
     
    brmp201 apreciază asta.
  2. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.834
    Aprecieri primite:
    3.159
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
  3. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Last edited: 20 Apr 2023
    agalpin și green five apreciază asta.
  4. westernrenown

    westernrenown New Member

    Înscris:
    2 Sep 2011
    Mesaje:
    32
    Aprecieri primite:
    21
    Didn’t the NNR have problems with a German boiler bodge job on the B12 many years ago ?
     
  5. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.497
    Aprecieri primite:
    2.855
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    IIRC this was passed OK before shipment? So what has happened from ex works to the UK?
    Has shipping caused the problems?
     
  6. 242A1

    242A1 Well-Known Member

    Înscris:
    3 Dec 2006
    Mesaje:
    1.561
    Aprecieri primite:
    1.304
    From reading the news article it appears that some stay replacement was planned but it seems that there was not the time to replace them all. Little surprise there in a post C19 world. As for the tubes we have not been told exactly what the objection was or how the installation of these new tubes differed from the installation of those previously fitted. It will be interesting to find out in due course.
     
    Bluenosejohn, guycarr360 și osprey apreciază asta.
  7. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.732
    Aprecieri primite:
    11.848
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’ve no idea of what the problem is but we’re the tubes welded in? German and UK practice differs in the method of doing this.
     
    osprey apreciază asta.
  8. 242A1

    242A1 Well-Known Member

    Înscris:
    3 Dec 2006
    Mesaje:
    1.561
    Aprecieri primite:
    1.304
    I recall David Elliot saying that the method used to install the small tubes was different and he felt that this was a good thing because it altered the gas flow through the tubes. This alteration allowed more gases to flow through the flue tubes with a subsequent improvement in superheater performance. There are details which I do not know but I suspect that someone did not like German practice. Reason? We don't know but I wonder what exactly changed.
     
  9. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The problem is that as the engine operates in the UK, It has to comply with UK boiler regs, and the method of installing the tubes did not comply so the only option, is to cut out new, unused tubes, at great cost, obtain a complete new set, again at great cost, install them to comply with UK regs, those doing the work in Germany, should have been aware of the differing methods that need to be employed, for an engine that operates in the UK, as opposed to the EU.
     
  10. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.732
    Aprecieri primite:
    11.848
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are no regulations other than compliance with the Pressure Systems Regulations which is silent on the subject. It is down to the opinion of the Competent Person who essentially signs it off. However, there is a British Standard for welded boilers which gives details on tube installation and quality and compliance with this is usually the accepted methodology. There is no standard for steam locomotive boilers of conventional riveted construction which is why the HRA issue guidance notes.
     
    Bluenosejohn și Sheff apreciază asta.
  11. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.304
    Aprecieri primite:
    5.729
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could you please quote a source for this assertion. I don't believe the A1 Trust have confirmed the actual problem with the tubes.
     
  12. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.497
    Aprecieri primite:
    2.855
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Fantasy...I think the source...
     
    6960 Raveningham Hall și ghost apreciază asta.
  13. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Regarding the stays, if they needed replacing I don’t see doing that here, rather than there, significantly alters the overhaul programme? It probably entails an additional hydraulic test too, which would delay the steam test.

    As you say, the same boiler has already been tubed twice in the past (once when new, and again at the first 7 year overhaul), so what’s different this time? I doubt it’s another ‘Brexit benefit’, so what’s gone on?

    And while we’re on the subject of boilers, what’s the status of the two long overdue new boilers (and their tubes), bearing in mind the first one was destined for Tornado’s overhaul, which could have obviated this whole tube & stay issue?


    Sent from my iPad using Tapatalk
     
    Bluenosejohn și torgormaig apreciază asta.
  14. guycarr360

    guycarr360 Part of the furniture

    Înscris:
    4 Oct 2005
    Mesaje:
    4.834
    Aprecieri primite:
    3.159
    Sex:
    Masculin
    Locație:
    Chester le Street County Durham
    The situation has alarming similarities to Aussie 3801's boiler issues.

    Having seen the boiler at first hand, i cannot believe that Meineghan allowed it out of the works in that condition.

    I can only assume a heavy knock in transit, or similar to cause the issue, did they use Evri to move it.....
     
    osprey apreciază asta.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why else remove the entire set of tubes, then?? Its not something you would normally do, unless you had to, they are brand new for god's sake, have you ever worked on a steam loco? and fantasy, really, once you cut out tubes, you unless you can weld on new flue ends, which i'm not even sure is allowed now, the tubes are scrap, perhaps a boilersmith can back me up on this, the staining looked to be around the flue and smoke tubes, not the tube plate there has been no mention of work needed on the tube plate itself .
     
  16. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.304
    Aprecieri primite:
    5.729
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Maybe there has been a flaw found in the tube material? Maybe a treatment was applied that shouldn't have been. Maybe the weld material was incorrect. We simply don't know, so you can't make statements as though you do.
    Yes, although I don't see what that's got to do with anything.
    If you're putting forward your opinion as fact without any statement from the Trust to back you up, then why would it matter if I've worked on a steam loco????
     
  17. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.927
    Aprecieri primite:
    1.070
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does the "Red Book" still rule, Steve?
     
  18. The Green Howards

    The Green Howards Nat Pres stalwart

    Înscris:
    20 Feb 2016
    Mesaje:
    15.107
    Aprecieri primite:
    8.634
    Ocupație:
    Layabout
    Locație:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If they did, they'd still be looking for it in a depot...
     
    green five, Sheff, Bluenosejohn și alți 4 apreciază asta.
  19. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On arrival in the U.K., and following inspection by British Engineering Services, there has been a concern around the quality and installation of the small tubes in Tornado's boiler. At present we are not able to confirm if this is a material or welding issue so all parties (A1SLT, DB Meiningen and BES) have agreed that the most expeditious action is to replace the small tubes whilst we investigate the issue. This approach will not only ensure continued quality and reliability but will be the fastest route to complete the boiler ready for installation on the frames.

    Source 21st century steam ( afka A1SLT) news page February 2023. Doesnt confirm what the problem with the tubes is, only that there is a problem perhaps its a case of being diplomatically vague...
     
    green five și martin1656 apreciază asta.
  20. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.304
    Aprecieri primite:
    5.729
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly. I had previously read that statement on the A1 website and could find no definitive cause mentioned.
    That's why I took issue with Martin's assertion that it was definitely the method of installing the tubes, when none of us actually know.
     
    osprey apreciază asta.

Distribuie pagina asta