    Steel fireboxes are not new, they have been in use for quite some time, I believe the method of securing the stays differs on the continent, than what if the norm here, ON the MN/ WC class they are screwed into the firebox then machined over and are solid , The Continental way seems to prefer hollow stays that are welded in place, and only expanded, then welded Are hollow stays more prown to cracking due to the fact that they are hollow? everything seems to indicate that work on the firebox, was not done right, or that patching, in sections has added to the stresses, where as a whole new firebox, to the redesigned drawingss, would have been a better, and possibly cheaper, in the longer term, solution.
     
    class8mikado și Sheff apreciază asta.
  2. clinker

    clinker Member

    Înscris:
    8 Oct 2016
    Mesaje:
    612
    Aprecieri primite:
    372
    Sex:
    Masculin
    Locație:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer



    A lot depends on how far things go, if the new firebox design still has welded stays how has the problem been treated? the only way to make the stays more flexible is to make them longer, which would look to me like a narrower inner firebox, which means that the tube nest would be narrower, so this would also mean a new smokebox tubeplate, so the only parts re-used would be the barrell and outer wrapper, which are well into their service life, and probably into need of work, so would it all be a hiding to nothing? The heating stresses in welding the stays is another case in point, continental standards only require what We would term a seal weld, much less heat/stress We require a full penetration weld in a ground out weld prep, lots of heat. As I posted earlier Meiningem were not prepared to apply a CE on the boiler, which had to be the responsibility of the A1SLT, British welders were also employed by meiningem well, We've just had Easter, remember what Pontius Pilate did?


    P.S. is it worth remembering what BR were doing with 16 year old A1's?
     
  3. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.836
    Aprecieri primite:
    22.279
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    BR was ridding itself of 16 year old A1s not because they were life expired but because Steam had finished and they were being replaced by diesels. Younger standard classes went to the cutter’s torch when they were still in perfectly good order.
     
    Big Al apreciază asta.
  4. clinker

    clinker Member

    Înscris:
    8 Oct 2016
    Mesaje:
    612
    Aprecieri primite:
    372
    Sex:
    Masculin
    Locație:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer



    I'm not disputing any of that, but how many of the scrapped A1's hadn't had a boiler replacement in that time? like every other class the boilers were worked on/repaired/rebuilt and worn out again, Tornado is no longer a new locomotive.
     
    acorb apreciază asta.
  5. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    … Which is why the plan was to fit a new boiler.
     
    Sir Ralph Wedgwood apreciază asta.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.913
    Aprecieri primite:
    5.851
    Presumably at the time it was believed that refurbishing the original boiler would be quicker than finishing building the first of the new ones. With hindsight, possibly that was a mistake, but we don't know what snags may appear with the new boiler when it is eventually delivered. Will it even fit straight away?

    We have been told that there was a clearance problem between the cladding and the rear driving wheel, but how did that arise? What had changed between when the boiler came off and when it went back on?
     
    Sir Ralph Wedgwood apreciază asta.
  7. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.927
    Aprecieri primite:
    1.070
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Good questions that deserve an answer.
     
    Sir Ralph Wedgwood, Chris86 și Sheff apreciază asta.
  8. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.059
    Aprecieri primite:
    3.138
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wouldn’t hold your breath ….
     
    Sir Ralph Wedgwood și Johnb apreciază asta.
  9. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't think you will ever be told what happened, but I'm guessing the people who overhauled the boiler, did not have the same degree of skill as those who built it, and mistakes were made, which lead to the problems, first getting the boiler to fit, and lead to two sets of brand-new tubes having to be scrapped I keep coming back to the question, why send the Boiler to Germany, when there were people here in the UK, who possibly might have not made those mistakes,
     
    Sir Ralph Wedgwood apreciază asta.
  10. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Înscris:
    1 Oct 2023
    Mesaje:
    183
    Aprecieri primite:
    153
    Sex:
    Masculin
    Locație:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The first of the two new boilers is already almost two years late with no recent update on when it will be delivered. No recent update either on the success - or otherwise - of the fundraising club set up to top up the funds already set aside for Tornado’s overhaul. The target for this was £50k and the overhaul is now estimated to have cost c£1m. I wonder how much has been borrowed from PoW and how that will be repaid?
     
    Last edited by a moderator: 20 Mai 2024
  11. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IIRC work to alter the foundation ring has been ongoing since the first overhaul, again a British design realised with continental practice proving to be not ideal.
    The foundation ring is where in relation to the rear driving wheels ?
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And that's IMHO, why really a new firebox should have been constructed , correcting the issues, found with the original design, with the stays, done in the same way as on the steel fireboxes used on the Bulleid Pacific's solid Monal stays that are machined over, not hollow secured only by expanding then seal welding, posibly using the same idea of U channel forgings for the foundation ring instead of a separate forging
     
  13. osprey

    osprey Resident of Nat Pres

    Înscris:
    3 Oct 2007
    Mesaje:
    10.497
    Aprecieri primite:
    2.857
    Ocupație:
    semi-retired, currently doing R&D for my patents
    Locație:
    Halifax
    Why did you not draw this to the attention of the A1 Trust initially? Maybe your expertise should be helpful to the new POW build ....on cam profiles for instance ? I'm being cynical... it's easy to criticize after an event... I presume you could do better ?
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    Înscris:
    8 Dec 2014
    Mesaje:
    19.265
    Aprecieri primite:
    12.517
    Sex:
    Masculin
    Locație:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would they have listened? could i have done better, Well i would have looked at what designs have worked for the last 80 odd years, and had steel fireboxes, what the best designs were, and then, adopted the design if possible, .
    Bulleid 's design of firebox, seems to have stood the test of time, and If I were designing a firebox, i would have started with the basics of that design, and how it was stayed, and Incorportated what's been learnt from that into the design,
     
  15. Eightpot

    Eightpot Resident of Nat Pres Friend

    Înscris:
    10 Aug 2006
    Mesaje:
    8.340
    Aprecieri primite:
    2.506
    Sex:
    Masculin
    Ocupație:
    Engineer Emeritus
    Locație:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Based a a friend's experience in contacting them following the seized inside cylinder piston valve and mangled valve gear affair with 60163 some years ago, probably not.
     
  16. torgormaig

    torgormaig Part of the furniture Friend

    Înscris:
    17 Iul 2007
    Mesaje:
    4.906
    Aprecieri primite:
    7.651
    Are you sure about that? I think that the thermic syphones were the achilles heel of Bulleid boilers as they were (are?) almost impossible to repair. Didn't Eastleigh have a stock of spare Bulleid fireboxes so that they could be replaced as a complete unit when the need arose. I think this may well have been common practice in parts of Europe and the US where steel boxes were in widespread use. Didn't a spare steel firebox come as part of the package when the Austerity 2-10-0s were obtained from Greece back in the 80s. And is there not at least one spare S160 firebox around somewhere?

    Bulleid boilers were excellent in so many ways but they were not designed with longevity in mind.

    Peter
     
  17. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Înscris:
    9 Oct 2019
    Mesaje:
    1.401
    Aprecieri primite:
    1.772
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The 3 ex-OSE WDs came with 1 spare inner box, and one spare assembly (inner & outer). From memory they didn't have thermic syphons (at least as carried by Bulleids), but just a pair of tubes from bottom to top.
    The single S160 came with a complete firebox assembly (inner and outer, all stayed up) which I believe went into the engine while it was being overhauled at Ropley.
    34.JPG
    A not-very-good shot of them ready to leave Ipswich. (It will be 40 years ago come August Bank Holiday - where has the time.)
    Pat
     
    60017, 26D_M, torgormaig și încă o persoană apreciază asta.
  18. 3855

    3855 Member

    Înscris:
    27 Sep 2008
    Mesaje:
    632
    Aprecieri primite:
    481
    Sex:
    Masculin
    Locație:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was it Gordon that had one of those assemblies fitted?
     
  19. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.836
    Aprecieri primite:
    22.279
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Syphon repairs may not be straight forward but they can and have been done.
     
  20. W.Williams

    W.Williams Well-Known Member

    Înscris:
    20 Dec 2015
    Mesaje:
    1.650
    Aprecieri primite:
    1.559
    Ocupație:
    Mechanical Engineer
    Locație:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Monel is both very expensive and very challenging to machine, so I imagine that deicion was made on cost grounds, both in procuring the material and the machining cost to make the stays.

    Again, somewhere, there must be a stress report for all this, where someone has done some proper engineering anlysis. Its all well and fine to talk about the past, but it doesnt tell us anything about the stresses in the box in service that we have today.

    The fact is, in the old days, nearly eveything was treated as expendable and life expired after 10 years. We no longer live in that world.
     