If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rail connected

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Reading General, 24 авг 2014.

  1. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    Haven't seen the Mid-Hants on the list. I assume they are still connected?
     
  2. Steve1015

    Steve1015 Member

    Дата регистрации:
    26 май 2011
    Сообщения:
    902
    Симпатии:
    268
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the lease is signed (very very soon) Swanage will have a fully signalled connection.
     
  3. Reading General

    Reading General Part of the furniture

    Дата регистрации:
    18 май 2011
    Сообщения:
    6.081
    Симпатии:
    2.217
    In the very first post..........
     
  4. TorbayTrains

    TorbayTrains Member

    Дата регистрации:
    4 фев 2013
    Сообщения:
    207
    Симпатии:
    67
    Адрес:
    South Devon
    West Somerset Railway - not to sure on frequency but do know they have started to get a few visiting mainline charters in the last year or two and run some shuttle services to Taunton on gala days.

    Bodmin and Wenford (?) - They share the station at Bodmin Parkway (Platforms 1 & 2 NR and platform 3 is theirs) so would imagine they have a connection.
     
  5. Paul42

    Paul42 Part of the furniture

    Дата регистрации:
    17 июл 2006
    Сообщения:
    6.096
    Симпатии:
    4.480
    Пол:
    Мужской
    Адрес:
    East Grinstead
    WSR - see post 25 Re : Ballast Trains
    Bodmin Yes see post 3.
     
  6. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    Must be going blind as I did scroll back through the thread! :)
     
  7. jnc

    jnc Well-Known Member

    Дата регистрации:
    3 апр 2012
    Сообщения:
    1.511
    Симпатии:
    2.709
    Пол:
    Мужской
    Адрес:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Since nobody else has stepped up to volunteer, if I get a chance this afternoon I will whip up a simple page containing the collected data in the thread; that should make it easier to avoid this.

    Noel
     
  8. Reading General

    Reading General Part of the furniture

    Дата регистрации:
    18 май 2011
    Сообщения:
    6.081
    Симпатии:
    2.217
    god man, knew someone would if I kept my head down long ehough
     
  9. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    3.896
    Симпатии:
    8.662
    MHR is also un-gated. Alton box is a fringe box to Woking (eventually will be Basingstoke). Next working scheduled for 3rd Sept.
     
  10. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.559
    I'm sure last time I was there it was gated, as shown in this pic, not mine.

    https://www.flickr.com/photos/forest_pines/7223380424/
     
  11. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I agree there is a gate but that is probably not the defining factor for accepting a train between NR and MH. Trains proceeding beyond the end of the NR platform appear to have a signal. This presumably will be jointly cleased by NR and MH.

    What I understand as a gated conection is where no signals exist and a gate padlocked by both parties is the physical barier between both companies. Opening the MH gate would not be an authority to procede. can a MH member of the forum confirm my belief

    EDIT - checked the MH website and the crossover between MH and NR is controlled from a power pannel in Alton signal box. authority to procede is "via verbal comunication"http://www.watercressline.co.uk/article.php/640/alton-signal-box
     
    Last edited: 27 авг 2014
  12. Neil_Scott

    Neil_Scott Part of the furniture

    Дата регистрации:
    25 апр 2008
    Сообщения:
    3.155
    Симпатии:
    302
    Пол:
    Мужской
    Род занятий:
    Railway servant
    Адрес:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Unless it's a local instruction, I wouldn't think that a train has authority to proceed based on whether the MH gate is open or not. Gates aren't listed in the RSSB rule book as being signals.

    The Strathspey has a gate (or had one when I was there) between its boundary with NR, but it was always left open. Authority onto and off the network was controlled by the release of the ground frame at Aviemore, as an example.
     
  13. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are gates at SVR and like Aviemore are always openAuthority to procede from NR to SVR is given to NR by a release lever which releases the interlocking at WMSC to allow NR to reverse the crossover and clear the appropriate platform starter/ pos light. In the reverse direction the same release lever enables the interlocking to reverse the crossover and to clear a NR signal on the SVR side of the crossover. There is a large multicore cable between SVR box and the WMSC for indications and interlocking
     
    Last edited: 28 авг 2014
  14. Petwall

    Petwall Member

    Дата регистрации:
    15 ноя 2009
    Сообщения:
    227
    Симпатии:
    29
    Адрес:
    Here & There
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would class Peak Rail as very frequent as every train into Matlock platform 2 is on Network Rail metals from Matlock Riverside where the connection actualy is
     
  15. frazoulaswak

    frazoulaswak Member

    Дата регистрации:
    25 мар 2009
    Сообщения:
    804
    Симпатии:
    2.209
    Пол:
    Мужской
    Род занятий:
    Retired (at last!)
    Адрес:
    Hartford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think that you can add the Barry Tourist Railway to your list as an infrequently used connection.
    Cheers,
     
  16. jnc

    jnc Well-Known Member

    Дата регистрации:
    3 апр 2012
    Сообщения:
    1.511
    Симпатии:
    2.709
    Пол:
    Мужской
    Адрес:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    OK, done (sort of - see below); here: Heritage Lines and Rail Museums Connnected to the U.K. National Network

    This is really just a first pass: a lot of the boxes (e.g. connection frequency and type) aren't filled in, I was mostly trying to get the complete list collected up and onto the page. And no doubt there are a few errors of transcription, and research, as well! Please send me, or post, list of corrections/additions, and I will try to get to them 'soon'. A couple of comments/notes:

    i) I didn't bother to separate out "medium frequency" and "infrequent" because I couldn't work out a clear dividing line between the two. So at the moment there are only two classes: frequent (i.e. regular scheduled service) and infrequent (e.g. railtours, etc). If we can come up with a clear distinction, and classify all the lines according to that, I'd be happy to add an intermediate class.

    ii) Would it be useful to add any other columns? The most obvious would be "location of connection", but another interesting one might be 'line length'.

    That's not a bad idea - it would save people having to grovel through the entire thread to find the link. Probably a short thread, with just one or two posts in it, to prevent a recurrence of the problem?


    Anyway, hope the page is useful!

    Noel
     
  17. 8126

    8126 Member

    Дата регистрации:
    17 мар 2014
    Сообщения:
    831
    Симпатии:
    975
    Пол:
    Мужской

    Вложения:

    • IMG_1269.jpg
      IMG_1269.jpg
      Размер файла:
      768,5 КБ
      Просмотров:
      45
  18. jnc

    jnc Well-Known Member

    Дата регистрации:
    3 апр 2012
    Сообщения:
    1.511
    Симпатии:
    2.709
    Пол:
    Мужской
    Адрес:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the correction. I'll wait a bit and see if any more come in, so that I can batch them all together!

    Noel
     
  19. Woodster21

    Woodster21 Member

    Дата регистрации:
    4 фев 2007
    Сообщения:
    461
    Симпатии:
    50
    Адрес:
    Derbyshire
    Should Peak Rail be fully signalled? Signals, dollies and box are in place
     
  20. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    3.896
    Симпатии:
    8.662
    There is no gate at Alton as of two weeks or so ago. The picture linked above is out of date. The crossover is controlled by a ground frame locked by the Alton (MHR) box which is a miniature power box and Woking on the NR side. Authority to move over the connection is now by signals. AT55 and AT57 the home signals on the MHR side will now display a proceed aspect with a route indication. The website will no doubt catch up in due course. If anyone doesn't believe me about the lack of gate, by all means come to the diesel gala this weekend and take a look.
     

Поделиться этой страницей