If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Taw Valley

Тема в разделе 'Steam Traction', создана пользователем 34014, 5 июл 2009.

  1. 34014

    34014 Member

    Дата регистрации:
    14 мар 2006
    Сообщения:
    430
    Симпатии:
    30
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Thailand, The Land Of Smiles.
    Hi All

    Anyone out there who can advise progress on the long overhaul of Taw Valley? Seems like a long time since she was mentioned.
     
  2. kieranhardy

    kieranhardy Well-Known Member

    Дата регистрации:
    8 июн 2006
    Сообщения:
    1.603
    Симпатии:
    870
    Пол:
    Мужской
    Адрес:
    Kidderminster
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The most recent news i can find of her on here is in this thread:

    viewtopic.php?f=28&t=14627&p=282077&hilit=34027#p282077

    But that was back in March. On the SVR forum the latest news which was in May was that the bogie and pony truck were almost completely assembled.

    When i visited last week she didn't seem to resemble anything close to a complete loco so i would have thought she is at least 1-2 years away from steaming again.
     
  3. pseudonym

    pseudonym New Member

    Дата регистрации:
    22 окт 2007
    Сообщения:
    31
    Симпатии:
    0
    The boiler is still away at Roger Pridham's. I'm informed a few problems at a number of levels to this contract job have caused progress on the main chassis to slow. SVR permanent staff are focused on the main running fleet.
     
  4. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Latest SVR News says that the leading and trailing trucks* are now fully assembled and waiting to be installed under the frames. Driving wheels scraped, rubbed down and painted. Axlebox horn plates removed and refurbished,and securing fitted bolts and nuts replaced as necessary. Attention now turning to rebuilding the cab. I recall that the frames required much work in terms of loose/worn bolts/rivets. A new outside cylinder was cast some time ago.

    Last time the owner reported about the boiler/firebox repair, being undertaken away from the SVR, was that it was turning out to be very expensive.

    *Thats what the magazine says. For "leading truck" read "front bogie". Dont want some wit asking if it is a 2-6-2 !!

    46118
     

Поделиться этой страницей