If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Тема в разделе 'Steam Traction', создана пользователем Leander's Shovel, 20 окт 2007.

  1. brennan

    brennan Member

    Дата регистрации:
    11 сен 2016
    Сообщения:
    408
    Симпатии:
    452
    Адрес:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Anyone remember this?

    "80135 was withdrawn from service in July 1965 and sold to Woodham Brothers for scrap. It entered the scrapyard at Barry in January 1966 and stayed there until April 1973 when it left to go to the North Yorkshire Moors Railway (NYMR) at Pickering.

    It was bought by Jos de Crau, who financed its restoration in the NYMR workshops.

    As part of the restoration of the locomotive a new firebox was made of steel which subsequently proved troublesome and was it was later replaced with a conventional copper firebox."
     
  2. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.927
    Симпатии:
    1.070
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wonder what the records say about the ten Stanier Class 5s fitted with steel inner fireboxes (44718-44727) All were allocated to Scottish Region sheds because of the soft water in Scotland.
     
    Hirn нравится это.
  3. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.927
    Симпатии:
    1.070
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    80002 had similar problems in preservation with its new steel inner firebox.
     
    Sheff нравится это.
  4. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Since when have stays been expanded?
     
    Johnme101, Eightpot, Sheff и 2 другим нравится это.
  5. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From Arthur Cook's 'Raising Steam on the LMS' (1999) RCTS ISBN 0 901115 85 1:

    As part of the programme of experiments made in the post-war Class 5 4-6-0s, engines 44718-27 were fitted with welded steel inner fireboxes, and, as a further experiment, five spare G7S boilers for 4F 0-6-0s had all-welded copper inner fireboxes. By this time the SR had demonstrated that welded steel fireboxes presented no insuperable difficulties under British conditions, although unusual care had to be taken over water treatment if the fireboxes were to achieve reasonable lives. The SR had made provision for keeping the fireboxes hot whilst the engines were standing in sheds, to reduced the stresses caused by changes of temperature, but this provision had been found to be unnecessary. Annealing of the welds had also been found to be unnecessary, as the temperatures reached when the boiler was in steam had proved to be sufficient to achieve the necessary stress relief. Some of the uncertainties which LMS engineers had felt about welding as an alternative to riveting in boilers had thus been dispelled by Bulleid's experience. Furthermore, Crewe had gained considerable experience during the war of building large welded assemblies, for which manipulators were needed to allow the welders always to work downhand. The construction of welded steel fireboxes thus presented few problems, and I C Forsyth, the Crewe Works Superintendent, said at a meeting that "the welding of the complete steel inner box caused no difficulties whatever, and may be regarded as a straightforward job. The fixtures and manipulator proved entirely satisfactory...X-rays of the first box revealed slag inclusions, which had to be chipped out, but once the welders had established the correct technique .... there was no further difficulty".

    Although ordered by the LMS, these ten boilers, 12928-37, were completed between December 1948 and March 1949. To ensure that the boilers had water of uniform quality for the experiment, the engines were stationed in Scotland. The fireboxes had Monel water-space stays, which were caulked on the inner ends and fitted with nuts, in accordance with current practice. Star-shaped fractures developed around the stay holes, and when it became necessary to renew three-quarters of the firebox sides, the stays were riveted over without caulking. The firebox ends of the tubes were beaded over and welded, and cracks developed around the tube holes. The replacement tubes were welded without beading. These two modifications solved the problems of cracking, but it was decided that the steel fireboxes had brought no economic advantage, and after nine years' service eight of them (and possibly the other two also) were replaced by copper boxes.
     
    Hirn, sunstream, Spamcan81 и 7 другим нравится это.
  6. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.493
    Симпатии:
    2.850
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Very expensive.. anything with copper, as prices are soaring due to China hoarding it at the moment. Difficult to machine..you can say that again and it tends to work harden too. Very similar to Inconel, another nasty...
     
  7. Johnb

    Johnb Nat Pres stalwart

    Дата регистрации:
    3 дек 2014
    Сообщения:
    15.537
    Симпатии:
    18.383
    Пол:
    Мужской
    Род занятий:
    Retired, best job I've ever had
    Адрес:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Difficult to repair but not impossible, two locomotive have had a repair effected recently. One Merchant Navy boiler was built without syphons, last fitted to 35017
     
  8. Eightpot

    Eightpot Resident of Nat Pres Friend

    Дата регистрации:
    10 авг 2006
    Сообщения:
    8.340
    Симпатии:
    2.506
    Пол:
    Мужской
    Род занятий:
    Engineer Emeritus
    Адрес:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was wondering that, too.
     
    osprey нравится это.
  9. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.927
    Симпатии:
    1.070
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for that.
     
  10. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mandrel expanded stays are a thing on the continent - we did a narrow gauge boiler with them recently. The design we used started with a long 6mm hole and a short 14mm hole in the stay ends, and you drive a succession of tapered tools into them with a rivet gun until the 6mm hole tapers out to meet the 14mm section. No idea on the longevity, but they were quick and easy to fit.
     
    Chris86, Steve, ghost и 2 другим нравится это.
  11. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.589
    Симпатии:
    22.715
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. There is evidence that this was part of what took place at Eastleigh, for example.
     
  12. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.514
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Sorry I was referring to tubes, , but saying that it would appear on the continent,, some stays are expanded, i'm not a boilersmith by trade, so I'm interested to hear from people that have done this, Is it a temporary fix to keep an engine , in traffic until it can be shopped ?
     
  13. W.Williams

    W.Williams Well-Known Member

    Дата регистрации:
    20 дек 2015
    Сообщения:
    1.650
    Симпатии:
    1.559
    Род занятий:
    Mechanical Engineer
    Адрес:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is very revealling. Some notable lines give a lot away.

    Water treatment is always the prefered path, if its available. Notable that someone thought thermal cooling of the inner versus outer would create issues. Hold that thought.

    This would be true on the inner wrapper, however the heat affected zones on the outer wrapper would not be subject to the same temps, and so residual thermal stresses would still be present.

    Traditional stay practice, and we still get these fractures in current boilers without welding the stays.

    Yes, you dont need to bead and weld, one or the other will suffice.

    A happy benefit in a time where copper did not cost what it does now, they could just go backwards.

    In summary, its fine, but its using traditional staying practice, whereas Tornado has welded stays inner and outer, is that right? The inners will bake out the weld stresses, but the outers wont. The cracking on a welded box is going to be worst around the stays and the found rings. The seams to the barrel and in the wrappers are less worry-some.

    In theory, could the box be fully welded up, minus barrel, put in an oven, and then assembled to the barrel later? Baking out the welds to the barrel could be done with blankets. Thinking out loud here.

    The other option is to move to traditional staying practice, but that's a change in design and would require whatever design authority to go back and re-do the analysis. £££££

    The other aspect we haven't yet mentioned, is mechanical support. The large nuts used in traditional staying practice provide considerable mechanical support to both wrappers. On a welded stay, that isn't there, and worse still, there are residual thermal stresses right in the region of where more mechanical support would be helpful to the wrappers.

    It only adds to the argument of trying to get as much of the residual thermal stresses out of the box as possible of longevity is the primary motive.

    Indeed, Inco and Monel are nightmarish to machine. Asking someone for quotes immediately makes them think how many more carbide tips they will need to buy.

    Global copper demand is set to rise, check the demand over the previous century, it goes up in fits and spurts, not in a linear fashion.
     
    Last edited by a moderator: 22 май 2024
    Hirn нравится это.
  14. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bulleid's design was somewhat different from the international standard for steel boxes, the steel stays being thinner (5/8" dia. between the 7/8" x 11tpi threaded ends) and more numerous than the norm (3 1/4" centres) and the water legs wider (and of coure the A1 boiler is round top) which Bulleid thought would provide the flexibility. He did not use standard Flannery-type flexible stays save around the lower connection of the syphons but experience of stay failures led to monel stays (which I assume were threaded) being introduced into the breaking zones. U channels were I believe only used on the WC/BBs. There are extensive and very interesting commentaries on the Bulleid design in Bulleid's own paper (to the IMechE I think, in 1945) and Burrows and Wallace' paper of 1958 to the ILocoE on experience with the boilers in service.
     
    Hirn нравится это.
  15. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The largest component of monel is nickel of course which is around twice the price of copper.
    It is strange we don't hear much in the way of appeals to finance monel stays. Perhaps they don't need replacing very often?
     
  16. Johnb

    Johnb Nat Pres stalwart

    Дата регистрации:
    3 дек 2014
    Сообщения:
    15.537
    Симпатии:
    18.383
    Пол:
    Мужской
    Род занятий:
    Retired, best job I've ever had
    Адрес:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    60017, Mick45305, Sam 60103 и 13 другим нравится это.
  17. W.Williams

    W.Williams Well-Known Member

    Дата регистрации:
    20 дек 2015
    Сообщения:
    1.650
    Симпатии:
    1.559
    Род занятий:
    Mechanical Engineer
    Адрес:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Great colour choice.
     
  18. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    I can’t add any technical knowledge to the steel firebox debate, but IIRC the N2 currently has a steel firebox with welded stays, fitted during its previous overhaul.
     
  19. brennan

    brennan Member

    Дата регистрации:
    11 сен 2016
    Сообщения:
    408
    Симпатии:
    452
    Адрес:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "In October 2021 it was announced that the Gresley Society had launched an appeal for £100,000 after discovering that an exceptional number of items required replacement. The items included the pony truck tyres, crankpins, safety valves, superheater header and both smokebox and firebox tubeplates. In addition the firebox wrapper also needs to be replaced due to cracking around the crown stay holes.

    The total cost of the overhaul at Northern Steam Engineering at Thornaby was forecast in April 2024 to be £650,000. Hydraulic and steam testing was anticipated to be undertaken in May before the locomotive returned to service in the summer of 2024."
     
  20. Bikermike

    Bikermike Well-Known Member

    Дата регистрации:
    11 мар 2020
    Сообщения:
    1.814
    Симпатии:
    2.045
    Пол:
    Мужской
    Адрес:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So £600k for lots of stuff, only some of it is firebox-related.
     
    Last edited by a moderator: 23 май 2024

Поделиться этой страницей