If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Oswestry Update

Discussie in 'Heritage Railways & Centres in the UK' gestart door ilvaporista, 13 aug 2010.

  1. 35B

    35B Nat Pres stalwart

    Lid geworden:
    18 jun 2011
    Berichten:
    28.733
    Leuk Bevonden:
    28.659
    Geslacht:
    Man
    Locatie:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I thought it lasted into the 90s - I remember a trip being advertised after privatisation with 31s which then got cancelled.
     
    Martin Perry vindt dit leuk.
  2. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.455
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
    The last movement over the crossings I know of was a visit by a weed killing train in April(?) 1993. There was talk of further movements but so far as I know no other loco used the crossing
     
    Martin Perry vindt dit leuk.
  3. Vulcan Works

    Vulcan Works Member

    Lid geworden:
    12 apr 2018
    Berichten:
    266
    Leuk Bevonden:
    745
    Geslacht:
    Man
    Locatie:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’ve always thought Britannia Bridge is a pragmatic and perfectly workable solution and it shows what can be achieved when a Highway Authority is (eventually) on board.

    There’s no such thing as starting discussions too early in my experience, but the initial pitch is crucial as is understanding the legislation they operate under and pre-empting their questions and concerns.

    It sounds like the Oswestry team is already making good strides with stakeholders. As we know from examples on other railways, there are some impressive solutions being progressed that in the past would have been deemed too complex or expensive to undertake. A couple of A roads are a big barrier but not an impossible barrier!
     
    jnc en echap vinden dit leuk.
  4. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.455
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
    Thanks to CHR Facebook here is the new arrival waiting to be unloaded.
    200901040_4013402868713223_6377488022281360562_n.jpg
     
    Martin Perry, brmp201, jnc en 1 andere persoon vinden dit leuk.
  5. MellishR

    MellishR Resident of Nat Pres Friend

    Lid geworden:
    16 apr 2009
    Berichten:
    8.912
    Leuk Bevonden:
    5.849
    Thanks for asking. I was wondering myself, when watching a video of a train crossing there soon after reading the latest about the WSR's level crossing business.
    Edit: minor corrections
     
  6. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.455
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
    The A5 has long been identified as a route that needs to be upgraded. There are long term plans to dual the section where the level crossing is and at that point a bridge should be installed.
    The A483 as a feeder road would also be upgraded and again a bridge over the railway should be possible as part of the improvements. As mentioned to have everyone onside and involved early is key. CHR is working very hard behind the scenes with all stakeholders to make sure that when the time comes the railway is an integral part of the plan and not something that comes out of the woodwork at the last minute.
     
    jnc, Paul42, 30854 en 2 anderen vinden dit leuk.
  7. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Lid geworden:
    15 apr 2006
    Berichten:
    16.551
    Leuk Bevonden:
    7.897
    Locatie:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be good if that happens but I would anticipate a lot of resistance from the road building side; the terrain is pretty flat at both crossings and it would need big embankments to cross the railways ...
     
    jnc vindt dit leuk.
  8. Thompson1706

    Thompson1706 Part of the furniture

    Lid geworden:
    19 nov 2007
    Berichten:
    2.523
    Leuk Bevonden:
    1.886
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From a safety point of view a bridge over the railway one hundred yards or so before a roundabout could lead to problems with northbound traffic, given the density and speed of the traffic.

    Bob.
     
    jnc en Martin Perry vinden dit leuk.
  9. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could a "half and half" solution of low bridge/shallow cutting be an answer? Material from the cutting could be used for embankments.
     
    The Dainton Banker en Martin Perry vinden dit leuk.
  10. 30854

    30854 Resident of Nat Pres

    Lid geworden:
    8 mrt 2017
    Berichten:
    12.172
    Leuk Bevonden:
    11.496
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A sensible soumding suggestion, but one that would depend on the height of the water table and any likihood of flooding in the immediate area. I've no feeling for how the costs of a cutting / embankment might compare with those of a road embankment only.
     
    jnc vindt dit leuk.
  11. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Lid geworden:
    15 apr 2006
    Berichten:
    16.551
    Leuk Bevonden:
    7.897
    Locatie:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The A5 crossing would possibly be better achieved by a ‘Rail over’ bridge but the A 483 is made more complex by the proximity to Weston Wharf.


    Sent from my iPhone using Tapatalk
     
    black5 vindt dit leuk.
  12. 30854

    30854 Resident of Nat Pres

    Lid geworden:
    8 mrt 2017
    Berichten:
    12.172
    Leuk Bevonden:
    11.496
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which begs the question, what is the ruling gradient on the entirity of the route CHR have their sights set on? Any significant increase would obviously affect decisions surrounding future operations.
     
  13. daveb

    daveb Member

    Lid geworden:
    5 sep 2005
    Berichten:
    945
    Leuk Bevonden:
    484
    Geslacht:
    Man
    Locatie:
    Wimborne, Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suppose it depends on what any A5 upgrade would involve. If the plan is to duel the road (as has happened elsewhere, e.g. the Nesscliffe bypass section), it would make sense to build proper junctions, with the A5 on a flyover and the roundabout beneath. If this were to happen here, the A5 could be raised to a height to clear the railway and stay at that height to clear the roundabout too. There should be room to build the slip roads between the railway bridge and the roundabout.
     
    jnc, echap en black5 vinden dit leuk.
  14. hoffman

    hoffman New Member

    Lid geworden:
    7 aug 2016
    Berichten:
    52
    Leuk Bevonden:
    53
    Geslacht:
    Man
    Locatie:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Traffic getting that close to a roundabout should already be preparing to slow down. A small reduction in the speed limit might help too.
     
  15. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Lid geworden:
    15 apr 2006
    Berichten:
    16.551
    Leuk Bevonden:
    7.897
    Locatie:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Nesscliff bypass roundabouts do not have any flyover sections.
     
    35B vindt dit leuk.
  16. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Lid geworden:
    15 apr 2006
    Berichten:
    16.551
    Leuk Bevonden:
    7.897
    Locatie:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure - perhaps @ilvaporista can advise? I don't think there is much significant until after Llynclys?
     
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.798
    Leuk Bevonden:
    64.468
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    30854 en Martin Perry vinden dit leuk.
  18. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What would be the expected clearance lf Rail was under the Road?
    Network rail policy is to go for maximum clearance no matter what the prospect of needing it is.
     
  19. 35B

    35B Nat Pres stalwart

    Lid geworden:
    18 jun 2011
    Berichten:
    28.733
    Leuk Bevonden:
    28.659
    Geslacht:
    Man
    Locatie:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As is being used at Leighton Buzzard?
     
  20. 30854

    30854 Resident of Nat Pres

    Lid geworden:
    8 mrt 2017
    Berichten:
    12.172
    Leuk Bevonden:
    11.496
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And as was also done constructing the early stages of the Dduallt spiral.
     