If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rail connected

Discussie in 'Heritage Railways & Centres in the UK' gestart door Reading General, 24 aug 2014.

  1. Robin

    Robin Well-Known Member Friend

    Lid geworden:
    7 mei 2012
    Berichten:
    1.472
    Leuk Bevonden:
    1.917
    Locatie:
    Stourbridge
    Stretching a point, Appleby Frodingham is classed as a heritage line in the Wiki list. Surely a frequently used connection there. Not many incoming railtours though.
     
  2. kestreleyes

    kestreleyes Well-Known Member

    Lid geworden:
    4 okt 2007
    Berichten:
    1.313
    Leuk Bevonden:
    936
    Beroep:
    signal engineer
    The section on our side is signalled from us to NR but permission to go forward is via the divisible staff key method which I believe is unique now for this type of operation

    Technically permission from NR to us is via agreement and possession of the divisible and / or PR staff depending on what's required
     
  3. philw2

    philw2 Member

    Lid geworden:
    30 apr 2011
    Berichten:
    494
    Leuk Bevonden:
    86
    Will Peak Rail be the first Heritage Railway to be network-connected at both ends?
     
  4. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    See comments about the Ffestiniog / Welsh Highland
     
  5. Autotank

    Autotank Member

    Lid geworden:
    25 nov 2005
    Berichten:
    555
    Leuk Bevonden:
    130
    Geslacht:
    Man
    Beroep:
    Radio Producer
    Locatie:
    Berkshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes we run on NR land at Cholsey - the boundary is the 10mph board near the top of Cholsey bank (http://www.cholsey-wallingford-railway.com/images/Martello3.jpg). The run-round loop and the siding adjacent to the up relief the other side of the overbridge are all on NR land which we rent.

    You'll note in this picture how close we get to the 100mph up relief line - http://www.cholsey-wallingford-railway.com/images/Ivor093.jpg. There isn't enough clearance for a fence which can be a bit of a pain.
     
  6. gwr4090

    gwr4090 Part of the furniture

    Lid geworden:
    8 aug 2005
    Berichten:
    2.847
    Leuk Bevonden:
    222
    Geslacht:
    Man
    Beroep:
    Scientist (Rtd)
    Locatie:
    Dorset
    The West Somerset Railway connection with Network Rail was used over 700 times in 2013, nearly all for freight trains. On one memorable day we had three freight trains operated by three different Freight companies using 5 different Class 66s all on the line at the same time, due to snow and ice causing delays on the mainline.

    This year we have also had over 30 or so passenger train movements including visiting railtours and FGW units. I've lost count of the stone trains, plus the NR engineering trains of various types which come in to be turned on Norton triangle.

    David
     
    Last edited: 4 sep 2014
  7. marshall5

    marshall5 Part of the furniture

    Lid geworden:
    26 okt 2010
    Berichten:
    2.521
    Leuk Bevonden:
    4.359
    Locatie:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My money would be on the Bluebell beating them to it with the planned connection at Ardingly but I'm not holding my breath. Ray.
     
  8. Wenlock

    Wenlock Well-Known Member Friend

    Lid geworden:
    26 okt 2008
    Berichten:
    2.114
    Leuk Bevonden:
    1.368
    Geslacht:
    Man
    Beroep:
    Bus Driver
    Locatie:
    Loughton Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    EOR. Just had a letter today from LUL about the nearby works this weekend. Says the engineering vehicles will be loaded to rail at North Weald, the connection must now be permanent then?
     
  9. ADB968008

    ADB968008 Guest

    Technically (very technically and probably out of date now anyway), but for many years the ELR had a connection to Metrolink at Buckley Wells, and until very recently there was unused point work connecting the Bury Line to the BR line on the bank out of Manchester Victoria ...
    I did say technically..:cool:
     
  10. Kingscross

    Kingscross Member

    Lid geworden:
    19 okt 2009
    Berichten:
    853
    Leuk Bevonden:
    559
    Geslacht:
    Man
    Locatie:
    South West
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I know it's not connected at the moment, but would the Plym Valley be able to reconnect easily? Could prove a useful servicing facility for mainline steam to Plymouth if there was a connection.
     
  11. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.840
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bit in the Beano concerning the re -connection of the Embsay and Bolton Abbey to the Grassington Branch and thence to skipton.... £2.6 Million
    Guessing that most of this is to do with signalling and control rather than a few metres of track and a set of points...
     
  12. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There would also need to be track realignment work at Skipton in the platform.
    When we remodelled Skipton for electrification in 1994 the track was deliberately designed to give greater clearance away from the platform.
    Not impossible to correct though.
    Along with bringing back the platform and subway into a decent condition.
     
  13. 26D_M

    26D_M Part of the furniture

    Lid geworden:
    22 okt 2009
    Berichten:
    4.416
    Leuk Bevonden:
    1.681
    Its severed now at Buckley Wells but was used on many occasions for contract work and memorably an early hours trip with msc 32 Gothenburg to Manchester with a brake van in tow. It was in Thomas guise so startled many a late night reveller leaving the clubs of north east Manchester. Great fun!
     
  14. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Lid geworden:
    15 apr 2006
    Berichten:
    16.551
    Leuk Bevonden:
    7.897
    Locatie:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that the elevation chosen for their platform would preclude any reconnection with the main line.
     
  15. rhf19

    rhf19 New Member

    Lid geworden:
    13 mei 2006
    Berichten:
    85
    Leuk Bevonden:
    9
    The Buckley Wells link is still there and is used regularly, the last being about two weeks ago when T68 1003 was moved onto ELR metals by the SPV. This returned to Metrolink a couple of days later.
     
  16. 26D_M

    26D_M Part of the furniture

    Lid geworden:
    22 okt 2009
    Berichten:
    4.416
    Leuk Bevonden:
    1.681
    Good to hear. It seemed daft to have the connection undone.
     
  17. Pesmo

    Pesmo Member

    Lid geworden:
    26 dec 2008
    Berichten:
    817
    Leuk Bevonden:
    125
    I am quite excited at the prospect of Embsay and Bolton Abbey possibly getting access to Skipton and maybe even occasionally the line to the Quarry which is no short distance. It goes through some lovely scenery towards Threshfield & Grassington and the track always seems to be in excellent condition.
     
  18. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.840
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is a lovely line, ive never seen one of the quarry services actually running on it from Swinden Quarry but clearly they still do.
    I should maybe check out RTT to see when they run, good to see bulk goods on the rails and not the Roads
    Maybe one day some accomodation to use the line with a small halt at Cracoe and a runaround in the quarry sidings might come to pass...
     
    26D_M vindt dit leuk.
  19. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ridden over the Grassington branch many times in a tamper.
    The line has just about been fully relaid between 1995 and 2003, nearly all in CWR.
     
  20. 26D_M

    26D_M Part of the furniture

    Lid geworden:
    22 okt 2009
    Berichten:
    4.416
    Leuk Bevonden:
    1.681
    Didn't 75014 do a charter on the branch or is that a dream of mine?
     
    Gav106 vindt dit leuk.

Deel Deze Pagina