I am very optimistic - the patient should end up keeping me warm next winter. The dead wood is nice and dry
Pway had a go today at treating Ash die-back [ATTACH] [ATTACH] [ATTACH] [ATTACH]
Now sorted, managed to swap my pair of Friday tickets for a pair of Sunday ones
5197 was hauling the services last Wednesday.
I have two tickets for the Friday but now have another commitment. Ia anyone interested in them for what I paid - £30 each?
Coming back the longer way https://www.realtimetrains.co.uk/service/gb-nr:C11655/2025-03-26/detailed
More work on the trees in the Bradnop cutting today. Hot spring sunshine meant it was hot work Before [ATTACH] [ATTACH] [ATTACH] After [ATTACH]...
Alex something, if I remember correctly
Yes - I was on the footplate of 34007 going up the CVR branch line to Ipstones when he was the driver one day.
Must get some of that special weedkiller to treat those before they takeover the site. The land at the top of the cutting is privately owned and...
More so on a south facing slope. It will be interesting to see what this north facing one produces
Tree thinning operations on the south side of Bradnop cutting nearly complete. Before [ATTACH] [ATTACH] [ATTACH] After [ATTACH] [ATTACH] [ATTACH]
No problem today getting tickets for the Friday. Less than 5 minutes. Saturday appears to be fully sold
Train a Vapeur des Cevennes was quite interesting a few years ago. SW of Lyon and north of Montellimar. Closed at the moment but appears to be...
Cauldon to Leekbrook was originally leased by BR to Moorlands and City but since they took up the track above Ipstones the line from Ipstones to...
PWay tree team out twice this week. On Monday removed a large dead tree near the end of the new platform at Leek. Today, despite the snow, we...
More work at Leek. Today jacking and packing - one of the more physical jobs, but essential to give the locos and passengers a smooth ride. This...
The track is all installed and 33102 got all the way to the Leek buffer stop yesterday. Still some ballasting and track fettling to do but the...
I think the focus is on getting the track and platform done first.
The new water tower at Chedd was installed some time ago. The line through platform 2 has recently been extended so that it now stops at the old...
用逗号分隔用户名