We are working hard to have her ready to be available for the ESR Gala 31/5 and 1/6
A search on Google would seem to confirm this.
Taking advantage of having a crane for 4247 the dis-assembly has started in earnest! [ATTACH]
And a couple of photos taken earlier. [ATTACH] [ATTACH]
Photo of 08 704 taken yesterday between shunting moves.
Pleased to report that she successfully passed her steam test yesterday, 28/3/25. All efforts will now concentrate on readying the boiler for...
We normally have a constant flow of water under the fire over the bed of the wagon. We have now steamed several boilers on this wagon following...
For those who might be wondering, the hose going into the smokebox is for a compressed air powered blower.
In house steam test planned for this weekend and, if all goes well, formal test late next week.
Steve Masters has reported on f'book that the boiler and super heater assembly have today passed their hydraulic test.
She will take over the shunting duties currently in the hands of PBA39 which will now receive some much needed care and attention.
08704 arrived at the East Somerset Railway yesterday, 25/2/25.
4247 should return in the first half of the year and 46447 was withdrawn late 2024. Both at East Somerset Railway
Agree location, see page 4 of linked document below. https://nolanredshawcrm.agencypilot.com/crm/store/documents/other/23326_r7853327c538y7qa.pdf
46447 departs on her last run before being taken out of service. [MEDIA]
The last outings for the Ivatt 46447 are this weekend, 26/27 and Wednesday 30 October, subject to availability, before her next overhaul. This...
Tom, Will the vacuum in the chamber not fall slightly (or pressure rise) due to the movement of the piston reducing the volume of the chamber side...
Only steam I could see in the cab area was from injector overflow, which can happen when starting or stopping injector or they sometimes 'knock...
You are correct - Saint to stand in for Grange courtesy Didcot.
Due to be at East Somerset Railway 16 and 17 March.
用逗号分隔用户名