Haulwen will be next, boiler work has started and work will commence on the chassis as soon as Moorbarrow is finished.
hi Tom Moorbarrow is privately owned. Managed to grab a few pictures today so here they are. Regards Matt
After a couple of weekends work the points at Bronwydd are back in having received new timbers. regards Matt
yes it did, it went to London and actually made it into the studio. This was on account of the link with Brynteg Comprehensive school, Bridgend...
Hi Colin thanks for this, we plan to use the 3 way point at Abergwili running off the south end of the present loop line to create a “fan” of...
non-essential travel doesn’t apply to domestic freight transport - chapter and verse here if you want it....
just a thought. I wasn’t around for the age of steam but I do remember a number of summer trips to my “home” railway when I was 10 years old in...
Vintage carriage update Taff Vale Railway 220 has joined GWR 216 in the shed now. The initial focus on this coach will be to seal the gutters and...
Update the P Way gang are busy again, this time replacing the south end points at Bronwydd Arms. regards Matt
Update L92 has arrived in typical Welsh weather... Meanwhile work continues on Moorbarrow and GWR 216 in the dry, the former having the cab...
hi Tom L92 arrives tomorrow so that’s some good news. We are not sure yet when we will be returning to operations, but there is a lot going on,...
So sad to hear this. I hope that these issues can be sorted and the railway can move forward in some form. Regards Matt
tbe train element is considered to be a “transport network” akin to the mainline as opposed to an “indoor” attraction.
Hi CoT Fan the extension is only a short one, it is really just a siding to the end of our site (about 8/9 panels). It won’t be part of the...
hi Tom yes, our recent track recoveries have yielded more point work which will enable us to add additional sidings. Exact timescale will depend...
Another update The crane was in use today and the crossing switch was lifted in. As you can see a little bit of joining up work and then the...
A good day as the new crane is in action for the first time on our railway and the south points at Abergwili are being replaced. regards Matt
May be a taste of things to come this year...5764 with the two vintage carriages back in 2006. regards Matt
The shed has made a big difference to be honest, hopefully something of a game changer for us. Our volunteers and staff have also been working...
Moorbarrow is nearing the end of her 10 year overhaul - should be ready within a few months subject to the usual caveats
用逗号分隔用户名