If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bincombe Linesiding

本贴由 steve451102011-03-28 发布. 版块名称: What's Going On

  1. steve45110

    steve45110 Member

    注册日期:
    2005-09-10
    帖子:
    309
    支持:
    45
    性别:
    Just a note to say that future linesiding at Bincombe Bank, near the tunnels, will be much easier and quieter from now on. The new Weymouth Relief Road opened on March 17 and, the old road around the hairpin bend is closed. It will become a cycle path within about 3 months, so should be done by the time the summer specials start running to Weymouth.
    Should make things much more pleasant for all of us.
     
  2. free2grice

    free2grice Part of the furniture Friend

    注册日期:
    2005-09-19
    帖子:
    5,636
    支持:
    3,643
    性别:
    职业:
    Retired Rolls-Royce engineer
    所在地:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When I visited the area last summer to film Scots Guardsman, I noticed that most of the new road appeared to be hidden by embankments.
    I hope that the situation has not changed. <BJ>
     
  3. buzby2

    buzby2 Well-Known Member

    注册日期:
    2009-03-26
    帖子:
    1,717
    支持:
    590
    所在地:
    Swanage
  4. Spamcan81

    Spamcan81 Nat Pres stalwart

    注册日期:
    2007-08-25
    帖子:
    35,861
    支持:
    22,338
    职业:
    Training moles
    所在地:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Where will be the parking for this location? On the one occasion I've been there I used the layby between the two tunnels.
     
  5. swanny

    swanny Member

    注册日期:
    2005-09-08
    帖子:
    337
    支持:
    153
    所在地:
    NE Hants
    Looks like there will be a couple of laybys on the relief road about 500m south of the Bincombe Junction. Otherwise presume try and find a spot on the roads either side of the junction (Ridgeway Hill/Bincombe Lane).
     
  6. Spamcan81

    Spamcan81 Nat Pres stalwart

    注册日期:
    2007-08-25
    帖子:
    35,861
    支持:
    22,338
    职业:
    Training moles
    所在地:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks. I hope to get down that way for a couple of runs later this year although I'm also looking forward to making my first climb of the bank behind steam.
     
  7. nanstallon

    nanstallon Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,358
    支持:
    2,418
    性别:
    职业:
    Retired
    所在地:
    Westcountry
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I's nice to see a modern development that makes life easier for the photographer.
     
  8. steve45110

    steve45110 Member

    注册日期:
    2005-09-10
    帖子:
    309
    支持:
    45
    性别:
    The new Bincombe junction will allow access under the new A354, to the lane that used to come off the hairpin so, there should be parking along there. That also connects to the old A354 down under the rly bridge to Upwey but, probably with yellow lines. The old section round the hairpin and over the line will be the cyclepath. No traffic to worry about, just cyclists hurtling down the hill! They have already dug up most of the road there.
     

分享此页面