If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Dinmore Manor

本贴由 Dinmore Manor Ltd.2013-10-17 发布. 版块名称: Steam Traction

  1. NOTFORME_99

    NOTFORME_99 New Member

    注册日期:
    2013-05-10
    帖子:
    110
    支持:
    94
    性别:
    Manor tank ?

    You would need to finish the side tanks when the cab starts to give the crew some room,
    The bunker would be better over a bogie - like the standard 4 tank.

    But if you want to play
    Put a 28xx boiler on the Manor frames
    Or
    How about a Hall tank as a 4-6-4T ?
     
  2. Jimc

    Jimc Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,117
    支持:
    4,821
    职业:
    Once computers, now part time writer I suppose.
    所在地:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Manor frames are too short for a Std 1 boiler, and in any case I reckon a Std 1 would need to be sitting on 8 driving wheels for a tank engine to come in as red route restricted. So my guess is a tank engine with a Std1 boiler would need to be a 4-8-2 or 4-8-4, depending on how much water needed to be carried, and that would probably need to be based on a modified 47xx chassis for the wheelbase to be even half sensible, and then I start realising that even with the kit of parts those chaps at Swindon were a lot smarter and more knowledgeable than I am and this loco design business is more complicated than I thought. And I'd better shut up now so the thread can get back on topic...
     
  3. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,674
    支持:
    18,700
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Well it keeps the thread near the top when not much is happening!

    Swindon really could have done with us, I definitely like the sound of a GW 4-8-4 tank, I wonder who would have been likeliest to build it, Churchward, Collet or Hawksworth...
     
  4. Neil_Scott

    Neil_Scott Part of the furniture

    注册日期:
    2008-04-25
    帖子:
    3,155
    支持:
    302
    性别:
    职业:
    Railway servant
    所在地:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The former, I'm unsure if the latter two had the imagination for such a design.
     
    已获得Jamessquared的支持.
  5. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,674
    支持:
    18,700
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably, I don't think Collet did many "different" things, I was led to believe Hawksworth tried to breath some fresh air in though...
     
  6. Jimc

    Jimc Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,117
    支持:
    4,821
    职业:
    Once computers, now part time writer I suppose.
    所在地:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to RCTS under Collett's regime they starting roughing out a 4 cylinder 4-6-2 tank with a shortened Std1 boiler, but the standard 4 cylinder layout couldn't be made to work with smaller wheels. A more practical proposal was a 2-10-2T with a Std 7 boiler. There's enough detail available on that one that someone made a model: http://www.gwr.org.uk/galfox2.html
     
  7. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,798
    支持:
    64,473
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Did someone say they wanted a 4-6-4T?

    [​IMG]

    [​IMG]

    Oops sorry, thread drift again…

    Tom
     
    已获得dan.lankThunderer008spindizzy的支持.
  8. Neil_Scott

    Neil_Scott Part of the furniture

    注册日期:
    2008-04-25
    帖子:
    3,155
    支持:
    302
    性别:
    职业:
    Railway servant
    所在地:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What kind of work was envisaged for such a design? The pacific tank has always seemed an unnecessary one to me.
     
  9. michaelh

    michaelh Part of the furniture

    注册日期:
    2006-04-29
    帖子:
    3,080
    支持:
    1,291
    性别:
    职业:
    Very comfortably early retired
    所在地:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The GWR Directors did not need another locomotive designer when Churchward retired - they'd had a brilliant man who'd set out the designs they needed for the next 50 years.

    They needed a "workshop man" to improve productivity in the shops and to integrate the works they'd be taking over at the grouping - that's why they appointed Collett - because he fitted that particular bill.
     
  10. Jimc

    Jimc Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,117
    支持:
    4,821
    职业:
    Once computers, now part time writer I suppose.
    所在地:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to RCTS the aim for the 4cyl 4-6-2T was for a high acceleration tank engine.
    I imagine they were looking across London at the timings of the Southern's electric services and thinking there was going to be a need to compete.

    The 2-10-2T was for Ebbw Vale iron ore traffic. They were later to use two 9Fs for that work.

    In his book "Swindon Apprentice" AE Durrant has a sketch of a loco he roughed out in his own time and proposed for the iron ore traffic, which was turned down on the spot... It was a 3 cylinder 2-14-2 with TE of 74,125!
     
    已获得Neil_Scott的支持.
  11. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,798
    支持:
    64,473
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Wouldn't they have been better looking at the underlying reason for the quick timings of the Southern services, i.e. electrification, and trying to replicate that, rather than going down what was an essential dead end? Looks a bit like the GER 0-10-0T, that was built to prove that steam services could accelerate from 0-30mph in less than 30seconds. It proved the point, and probably set back electrification by decades, while much slower steam engines continued to run the services, with all the attendant problems of dirt and higher motive power requirement by the need for turnover engines etc..

    Tom
     
  12. Jimc

    Jimc Part of the furniture

    注册日期:
    2005-09-08
    帖子:
    4,117
    支持:
    4,821
    职业:
    Once computers, now part time writer I suppose.
    所在地:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But could they afford it? Even now, what, 80 years on, aren't I right in saying that not all London commuter lines have been electrified?
     
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,798
    支持:
    64,473
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    It's an interesting question (and apologies for thread drift). But clearly the SR (and the pre-group companies before them) had an economic strategy to electrify their lines. Not only did it lead to reduced operating costs, but the way it was marketed (on the basis of speed, cleanliness and regularity) generated entirely new traffic - the "sparks effect". Indeed, more than half the cost of suburban electrification was paid from enhanced revenue from the previous schemes. It's curious that the GWR didn't develop their short distance commuter traffic in the same way.

    Tom
     
  14. simon

    simon Resident of Nat Pres

    注册日期:
    2006-06-26
    帖子:
    11,872
    支持:
    5,562
    But the GWR didn't have the suburban traffic that the Southern had.
     
    已获得michaelh的支持.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,798
    支持:
    64,473
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Neither did the Southern initially - the cultivated it, while the other three companies (and to a large, though not universal extent their pre-group constiuents), ignored the local traffic while concentrating on inherently less remunerative, but more prestigious, long-distance services.

    The success of the Southern's strategy can be seen in the respective financial accounts before the war.

    Tom
     
  16. Neil_Scott

    Neil_Scott Part of the furniture

    注册日期:
    2008-04-25
    帖子:
    3,155
    支持:
    302
    性别:
    职业:
    Railway servant
    所在地:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    However wonderful the Southern was, and we never seem to stop hearing about it, this doesn't have much to do with 7820.
     
    已获得michaelh的支持.
  17. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    Hawksworth fell foul of post war austerity and BR looming to be fair, People probably have a point on Collett, but considering the success of his predecessor, would you try something new and fail, or enlarge proven technology to do the job ?.
     
  18. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,732
    支持:
    11,847
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Did the Brighton lot have ideas about taking on brass & copper line and reaching South Wales?
     
  19. david1984

    david1984 Resident of Nat Pres

    注册日期:
    2005-09-13
    帖子:
    12,910
    支持:
    1,387
    性别:
    所在地:
    Birmingham
    Clearly not, no works that favours the 4-6-2 arrangement is even aware lines and gradients like the South Wales valleys exist :)
     
  20. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,170
    所在地:
    Nantwich, Cheshire
    someone on facebook has posted that dinmore is having the dukedogs tender? is this true?
     

分享此页面