If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Instanter couplings

本贴由 Eightpot2012-06-04 发布. 版块名称: Railway Operations M.I.C

  1. threelinkdave

    threelinkdave Well-Known Member

    注册日期:
    2013-08-01
    帖子:
    2,065
    支持:
    1,240
    性别:
    职业:
    Retired
    所在地:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Talking about picking up trains gradually I believe that it was discovered when having a rake propelled with the DVT leading that the train needs to be treated almost like an old fashioned freight. Buckeye couplers are as not as solid as one might expect. There is a certain amount of slack and the drawhooks are sprung, usually with rubber donuts. When the loco starts pushing from the rear this small amount of slack needs to be compressed as each coach is picked up to stop the DVT being instantly propelled into motion.
     

分享此页面