If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

本贴由 14xx Lover2010-01-04 发布. 版块名称: Heritage Railways & Centres in the UK

  1. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed.


    Someone mentioned things 'growing organically', & that's where the risk is.
    They've got to a situation where Engineering has ~30 employees, that's a sizable operation.
    It was 20 in 2014, when there was also an operating loss. 20 in 2010, when there was a loss.
    The 2018 accounts state that engineering turnover was significantly down, yet staff numbers had gone up to 31.


    The figures for Engineering aren't split out, so difficult to tell if it was ever a viable business.
    I would wonder if the volunteer Directors had the capacity & skills to operate two quite different businesses.
     
    已获得ross, Bluenosejohn, osprey另外3人的支持.
  2. huochemi

    huochemi Part of the furniture

    注册日期:
    2008-05-06
    帖子:
    2,996
    支持:
    1,515
    性别:
    所在地:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    While that is a fair comment in isolation, it appears from the company's announcement that over £250,000 of liabilities are claims against the engineering business, which one might reasonably interpret to be claims which have not been settled and are unfunded by the bank or anyone else. Which really goes to the point of separate incorporation, to protect the main operating company from major shocks. Now there may have been good reasons for not putting it in a separate entity but prima facie it would have provided some shelter to the PLC.
     
    已获得The Dainton Bankerjnc的支持.
  3. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,494
    支持:
    2,854
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    Absolutely...
     
    已获得GWRArry的支持.
  4. simon

    simon Resident of Nat Pres

    注册日期:
    2006-06-26
    帖子:
    11,872
    支持:
    5,559
    True, but then someone has to control the new entity and it has to be funded. All structures have their advantages and disadvantages. And what existed at the Llangollen cannot be retrospectively changed.

    What would be useful to know (although I have no right to know as I'm not a share holder or member) is who owns/owed what.
     
    已获得Miffosprey的支持.
  5. Pmorgan_cym

    Pmorgan_cym Member

    注册日期:
    2006-08-08
    帖子:
    268
    支持:
    3
    So is this just a tactical winding up, they can't pay the settlement fees so they have no option but to wind the plc up? Not an uncommon thing to do but does leave a nasty taste in the mouth for those who lose out.
    No PI to cover the engineering business against these sort of claims?
     
    已获得ross的支持.
  6. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,494
    支持:
    2,854
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    Oh dear this is sad reading. I repeat, I hope and believe something can arise from this sad situation ..the potential is there. Hopefully some group with vision realise this with sound business grounds...remember it's a business not a railway.
     
  7. DavidH

    DavidH New Member

    注册日期:
    2016-03-23
    帖子:
    86
    支持:
    107
    所在地:
    The Marches
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It can't be both tactical and because they have no option.
     
    已获得jnc的支持.
  8. Great Western

    Great Western Member

    注册日期:
    2009-11-22
    帖子:
    327
    支持:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You have to worry the engineering side troubles will ripple across to the actual railway side of things in that donations and public confidence in pledging donations will dry up causing the slow death.

    We’ve already seen warnings of be careful where any donations are actually going etc, can we be 100% sure donations won’t go directly to paying the debts incurred and not support the railway? Is if just safer from a confidence point of view to simply not donate at all until it’s all sorted out, one way or the other.

    This doesn’t happen overnight, each nail in the coffin has been hammered home over several years, if the railway closes and the track ripped up then the management who’s job it is to ensure the ongoing ability of all aspects of the railway to operate in the green have failed so it’s only them who are to blame.

    I really can’t see 2021 ending without a Big name going out of business unfortunately, the WSR appear to have dodged that bullet - but will the LR?
     
  9. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,674
    支持:
    18,700
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, mostly from you!

    As long as you donate to the Trust, then yes, I think you can.
     
    已获得49010的支持.
  10. estwdjhn

    estwdjhn Member

    注册日期:
    2013-01-24
    帖子:
    342
    支持:
    693
    职业:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To a certain extent it can be. The total organisation (Trust, PLC, Engineering) has total liabilities which possibly exceed the total value of the assets, and certainly exceeds the value of the assets which aren't needed to keep the railway running. They probably have no option but for at least some of the organisation to go bump. However rather than lose the assets of the trust they are letting the PLC go under, losing any assets it has, and thus escaping all the liabilities - this is to a certain extent a tactical decision, the ability to do which goes back to when the PLC was created. One of the reasons a lot of railways use this structure is to shield their assets in the trust from the results of commercial failure.
     
    已获得MellishR, ross, jnc另外3人的支持.
  11. Thompson1706

    Thompson1706 Part of the furniture

    注册日期:
    2007-11-19
    帖子:
    2,523
    支持:
    1,886
    性别:
    职业:
    Retired
    所在地:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A note to all of the doom-mongers out there. The track is safe and the railway should be able to operate within a couple of months. The L.R.O. and T.W.A.O. held by the Trust allows the railway to operate Any donations to the Trust will be gratefully received, as will any new volunteers.

    Bob.
     
    已获得mdewell, GWR4707, ghost另外17人的支持.
  12. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A quick look suggests that monies going to the Trust should be okay. They don't appear to be a guarantor of the plc.
    (however, as at the end of 2019 they did owe the plc money, if that is still the case the receivers may choose to collect it)
     
  13. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Yep, it is the Trust that owns the trackbed etc;
    https://find-and-update.company-inf.../03040336/charges/AjSdcu_5yGA6qfD-h3u4rhTGiTg
     
  14. Great Western

    Great Western Member

    注册日期:
    2009-11-22
    帖子:
    327
    支持:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From a number of forums, ive asked the question once prior to this message.

    How do we know the trust isn’t going to be dragged into this mess, or is in trouble as well?
     
  15. Great Western

    Great Western Member

    注册日期:
    2009-11-22
    帖子:
    327
    支持:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Doom mongers or realists, “should be able to operate” ?

    I think potential donators have a right to be worried in the light of other railways who have been on the edge or have rather loose understanding of how to run a happy and financially sound business, note business not private train set.
     
  16. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    It is the plc's bank that have called in the receivers.
    NOT the plc or the Trust.

    Tactical would be the plc calling in administrators
     
    已获得GWR4707Sheff的支持.
  17. Monkey Magic

    Monkey Magic Part of the furniture

    注册日期:
    2018-01-06
    帖子:
    3,498
    支持:
    6,845
    所在地:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wasn't one of the directors the GM so surely someone who should have had their eye on the ball about what was going on day in day out on the line?
     
  18. Pmorgan_cym

    Pmorgan_cym Member

    注册日期:
    2006-08-08
    帖子:
    268
    支持:
    3
    It was reported as the PLC asking the bank to call in the receivers.
     
    已获得jnc的支持.
  19. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
  20. RichardBrum

    RichardBrum Member

    注册日期:
    2019-04-16
    帖子:
    262
    支持:
    335
    性别:
    所在地:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's a phrase they are told to use by the bank, so as to make it appear it isn't the bank taking the action.

    "Usually the bank (bizarrely) requires the directors to "request the bank to appoint a receiver". This is face-saving, and designed to deflect criticism from the bank to the directors."
    https://www.companyrescue.co.uk/guides-knowledge/what-is/what-is-receivership/
     
    已获得jncGreenway的支持.

分享此页面