If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Llangollen Railway

本贴由 14xx Lover2010-01-04 发布. 版块名称: Heritage Railways & Centres in the UK

  1. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To what end precisely? AFAIK, there's no suggestion of malfeasance and given what's happened, it seems unlikely those on whose shift this occurred would be appointed to similar positions elsewhere. From my own "outsiders perspective", based purely on what has come to light, the failure would appear to be one of management oversight, perhaps placing too much faith in people and/or processes that were clearly not up to the task.

    If there's a lesson to be learned, I'd venture to suggest, it's by those pining for those long vanished and in any case, often apocryphal days when everything happened on a wing and a prayer, without "procedures" and all that pesky official paperwork which comes with them.
     
    已获得Herald, marshall5, jnc另外4人的支持.
  2. Andy Moody

    Andy Moody Member

    注册日期:
    2007-07-09
    帖子:
    549
    支持:
    379
    职业:
    Retired
    所在地:
    71B ex 71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    +1
    Also known as being made a scapegoat!
     
    已获得Matt37401jnc的支持.
  3. johnofwessex

    johnofwessex Resident of Nat Pres

    注册日期:
    2015-04-06
    帖子:
    9,748
    支持:
    7,859
    性别:
    职业:
    Thorn in my managers side
    所在地:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wont suggest retribution, however what experience suggests elsewhere is the importance of Due Diligence in Senior Appointments.
     
    已获得35BMonkey Magic的支持.
  4. richards

    richards Part of the furniture

    注册日期:
    2008-10-01
    帖子:
    4,708
    支持:
    2,083
    性别:
    所在地:
    London
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But doesn't that also depend on who is doing the due diligence?

    How would this situation have been avoided?
     
  5. Herald

    Herald Member

    注册日期:
    2015-03-30
    帖子:
    311
    支持:
    581
    性别:
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There are several useful threads on here explaining the difficulties of specifying and delivering repair of heritage assets where inevitably unexpected extras arise during the strip down and inspection phases and things which it had been hoped to reuse prove to be beyond repair. It is also likely that contractors may have problems with customers unable to quickly meet additional costs when such items arise. So I would suggest the "due diligence" works at many levels:
    1) Does the specification and contract properly define requirements on both parties and how unforeseen items will be quickly resolved.
    2) Does the customer have effective supervision and the contractor a means of quickly obtaining authority for changes which will inevitably arise?
    3) Does the customer have adequate contingency to cover additional items or alternatively the contractor sufficient financial resource to await late payments so workflow can be maintained?
    4) Does the contractor have an appropriate management accounting and job costing mechanism in place?

    Sadly I suspect the vast majority of failures in this sort of business are down to optimism and the basic flaw of tender processes seeking lowest price which discourage the inclusion of adequate contingency funds and reduced efficiency as jobs stop and start due to customers with inadequate funds.

    The role of independent non executive Directors able to ask difficult questions should not be overlooked as it is inevitable that staff at the sharp end may be reluctant to admit difficulties at an early stage and optimistic about overcoming these which a truly independent assessment might not support.
     
    已获得bluetrain, The Dainton Banker, jnc另外1人的支持.
  6. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    28,732
    支持:
    28,659
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All true, but there's a bigger issue here - the role of engineering within the entire Llangollen set-up - which is I think at the core of the questions asked by Martin and others. The answer to that question is about experience and judgment, not structure. When directors were appointed, what were their skills and qualifications? How did the board and management operate their oversight of the operations of the railway? Were they open to alternative interpretations of events?

    Reading between the lines, I suspect that it's a combination of these factors that combined with events - staff changes, problems with engineering quality, Covid - to bring about the insolvency, not one big event. I'm very conscious in the voluntary roles I do that it's a world of "there but for the grace of God go I", as limited resources and reliance on those volunteers who are willing to give up their free time can easily leave gaps in which problems can develop.

    Those who were at the helm as the Llangollen drifted will be known by those who need to know, and their reputations will be affected accordingly.
     
    已获得bluetrainjnc的支持.
  7. D1039

    D1039 Guest

    A very good recent example in a Beamish blog: "Once the assessment work had been completed, we were now reasonably well informed as to the condition. However, there were some nasty surprises still awaiting us."
    http://beamishtransportonline.co.uk/2021/05/dunrobin-ten-years-on/

    Patrick
     
  8. Bikermike

    Bikermike Well-Known Member

    注册日期:
    2020-03-11
    帖子:
    1,814
    支持:
    2,045
    性别:
    所在地:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's not possible to agree with this enough times. It is the weakness of pretty much all purchasing organisations to properly understand, manage and price for risk.

    All businesses take risk. Sometimes they come home to roost, if they all come home at once, the business goes bump. The question for the counterparty is balancing that risk against the cost of not undertaking the transaction.
     
    已获得35B的支持.
  9. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A major failing at the Llangollen workshops that no-one seems to have addressed in the preceding posts appears to have been quality control. The Patriot progress logs detailed a number of failings and the SRPS photos of the "Morayshire" flue tubes provide a number of examples of poor workmanship that should simply not have been passed if an adequate in-house inspection and reporting regime had been in place. It's a point that many railways who are not doing contract work would also do well to pick up on. I suspect that most rely on their skilled employees to know what they are doing (in other words, carry out self-regulation), but even the most skilled ones might have an off day and do something that is substandard. Our industry as a whole probably needs to up its game - or at the very least examine how it provides its quality assurance.
     
    已获得jnc, RLinkinS, johnofwessex另外1人的支持.
  10. Bikermike

    Bikermike Well-Known Member

    注册日期:
    2020-03-11
    帖子:
    1,814
    支持:
    2,045
    性别:
    所在地:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The interesting question was how much was the QC work "value-engineered" out? It's LL Plc's risk (up to any cap on liability agreed), but if the purchaser had "saved" on the QC, then they have got a poor bargain...

    One issue with QC is the lack of documented process - see the discussion on split pins elsewhere. Lots of people had strong opinions on the "right" way to do them, but no-one could point to a document that set them out. It's hard to say if it's done properly unless you have a definition of "proper"
     
    已获得jnc的支持.
  11. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,674
    支持:
    18,699
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, although even I could see what was wrong with the D49's boiler without anyone needing to explain it to me, and I know very little about that sort of thing!
     
  12. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    At the risk of splitting hairs, , how to go about opening a split pin should be a documented process, in the form of a standard operating procedure (SOP), whereas a quality inspection should document that the SOP has been followed. If selling services, though, documentation is key to avoiding strife-free contracts and I'm sure that it will become more prevalent.
     
  13. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    注册日期:
    2005-09-12
    帖子:
    10,146
    支持:
    9,777
    性别:
    所在地:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    if you have dropped a massive hoolie and show absolutely no remorse nor acknowledge the part you play then whilst it may seem unsavoury and unpleasant you get what you deserve
     
  14. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    注册日期:
    2005-09-12
    帖子:
    10,146
    支持:
    9,777
    性别:
    所在地:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    so this weekend we went to North Wales , heading to the coast . both ways we just drove past llangollen , breaking our journey elsewhere . We admired the lines views and could see Corwen and the new station . It did make me think that this is maybe the railways challenge , we all pass through so how many stop
     
    已获得toplight35B的支持.
  15. Alan Kebby

    Alan Kebby Well-Known Member

    注册日期:
    2019-09-18
    帖子:
    1,192
    支持:
    1,249
    性别:
    所在地:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’ve driven past several times over the years, and ashamed to say never had the opportunity to stop. It’s not a particularly touristy area and so relies on people making the effort to travel, rather than passing trade.

    However I think the same could be said of many other heritage lines, and they manage ok. The likes of Swanage and Paignton are lucky to be in tourist hot spots, but others such as the the Mid Hants and Bluebell are more off the normal tourist track.

    I suppose what doesn’t help is the remoteness of Llangollen, whilst Mid Hants and Bluebell etc can attract visitors from large towns and cities not too far away.
     
  16. std tank

    std tank Part of the furniture

    注册日期:
    2005-09-20
    帖子:
    3,927
    支持:
    1,070
    性别:
    职业:
    Retired
    所在地:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Llangollen not touristy, who are you trying to kid. It has at least ten hotels in the immediate area. Just up the road are the Cities of Chester, Liverpool and Manchester. Llangollen might not have a sandy beach, but there are many visitor attractions in the area.
     
    已获得60017, MattA, The Dainton Banker另外10人的支持.
  17. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,729
    支持:
    11,847
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Its 64 miles from the centre of Manchester to Llangollen, a bit less than the distance between Leeds and the Yorkshire east coast resorts. That doesn't stop thousands of people making the journey every day in summer. Liverpool and the Merseyside conurbation is even nearer That's a pretty large potential visitor audience.
     
    已获得Bluenosejohn, 2392, std tank另外1人的支持.
  18. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    注册日期:
    2008-07-24
    帖子:
    7,762
    支持:
    5,890
    I wonder if the parking in Llangollen plays a part in stopping off en-route to somewhere else. If you have young children it’s a bit of a walk, compared to many other railways which do have parking on site.
     
  19. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For us railway minded folks, unless there's something of interest being staged, Llangollen is a bit off the beaten track, but don't forget, gricers are but one target customer base.

    Believe it or not, Llangollen does have other attractions. Cultural events are big business locally, as is trade from canal traffic and the 'outdoors activities' brigade. It hardly needs saying that the past year hasn't been the easiest and when you add in the woes specific to the LR, the line (along with many others) does have a mountain to climb, but it occurs to me that the principal challenge is now one of effectively marketing both the area and the line.

    Better news is that, by definition, this means the railway isn't the only local attraction seeking to get the punters back. It'd be both unexpected and disheartening to learn there's no concerted tourist drive going on. As I've stated elsewhere, none of our heritage lines exist in splendid isolation. All are part of the wider community and now, more than ever, underlines just how vital that obvious truth is.
     
  20. bluetrain

    bluetrain Well-Known Member

    注册日期:
    2019-03-03
    帖子:
    1,561
    支持:
    1,584
    性别:
    所在地:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Some very wise words above, that cannot be repeated often enough. I seem to recall that the Treasury introduced formal procedures to correct "optimism bias" in government projects (for IT, military equipment, etc), but still without solving problems of under-estimating project resource and timescale requirements, and not allowing enough for "unforeseen difficulties".

    Back to the Llangollen Railway, their 2019 annual report and accounts lamented that "engineering again showed a substantial loss due to two contracts being massively underquoted." It did not identify which contracts these were, and I have no idea whether this was the complete cause of the Llangollen problems.

    https://s3.eu-west-2.amazonaws.com/...f59541cf04e8143dc1ee55e5887412432b75db7605a7d

    I see that the Companies House web-site now includes a "Joint Administrators Report & Statement of Proposals", dated 30 Apr but only posted on 17 May 2021. This is a lengthy and detailed document that is best examined by people with more business and accounting knowledge than me. But a few points did stick out.
    - Total liabilities are at the high end of estimates given in this thread.
    - The cost of administration is itself estimated at £146K.
    - Previous directors had provided £160K in loans to keep the company afloat, something that showed commitment and should be borne in mind by those who want to lynch people who perhaps made errors of business judgement in the lead-up to the company's insolvency.
    - The administrators had estimated the value of rolling stock and plant at £261K, but realised approximately £500K in the auction.

    https://s3.eu-west-2.amazonaws.com/...f83db1a6bf5f79e784021ba6725db7384728b9e958a04

    PS: Sorry for these long web addresses - I just hope that they work!
     
    已获得The Dainton BankerjncGreenway的支持.

分享此页面