If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

本贴由 Leander's Shovel2007-10-20 发布. 版块名称: Steam Traction

  1. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,636
    支持:
    2,903
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    The unexpected can always happen...that's simple fact...whether boiler tubes or life in general...
     
    已获得240P15的支持.
  2. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,874
    支持:
    3,191
    性别:
    所在地:
    Chester le Street County Durham
    I think it would be unfair to sensationalise some of the more juicy snippets that were mentioned today, suffice to say, the pictures say a thousand words.....
     
    已获得Sheff60017osprey的支持.
  3. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,552
    支持:
    11,961
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They can! And they have! And not just with 60163 either.
     
  4. 61624

    61624 Part of the furniture

    注册日期:
    2006-09-27
    帖子:
    5,294
    支持:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think there were pictures of newly installed tubes on "Morayshire" that provided for more evidence of how the installation of tubes could go badly wrong.....
     
    已获得5944的支持.
  5. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ...And hasn't yet re-entered service.

    Richard.
     
    已获得Sheff的支持.
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,423
    支持:
    12,626
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Clearly what might have been acceptable once isnt now, does DB have different sets of standards that applies to locomotive boilers on its tracks, to what our insurance company's expect, I'm trying to get my head round it, I'm assuming the firebox end tubes are rolled then welded is that where the problem lies, as in this country, we prefer to expand then roll to ensure a watertight seal, and then they are welded, but only at the firebox end, did the german boilersmiths just weld them?
     
  7. Johnb

    Johnb Nat Pres stalwart

    注册日期:
    2014-12-03
    帖子:
    15,678
    支持:
    18,650
    性别:
    职业:
    Retired, best job I've ever had
    所在地:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s down to the boiler inspector not the TOC and for what’s been disclosed the current state of the boiler is below the standard required
     
    已获得green five, Sheff, Matt37401另外1人的支持.
  8. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    注册日期:
    2015-10-02
    帖子:
    8,186
    支持:
    6,856
    性别:
    所在地:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why not if "modern" designed things such as SWR 701's or B737 Max have issues then why should not "old" technology suffer the same fate?
     
    已获得60017的支持.
  9. twr12

    twr12 Well-Known Member

    注册日期:
    2007-09-02
    帖子:
    1,663
    支持:
    830
    It beggars belief that these problems only came to light after the boiler had been carted from Germany to Britain. Surely the A1 Trust’s boiler inspection outfit would have sent a surveyor to to the overhauler a few times during the overhaul?
    It can be surmised from comments on this thread that there is more than one issue in question. There could have been opportunities to correct problems and set standards.
     
    已获得John MerrySheff的支持.
  10. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,636
    支持:
    2,903
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    We simply don't know the full facts..until we do it's pure speculation.
     
    已获得Richard Roper的支持.
  11. twr12

    twr12 Well-Known Member

    注册日期:
    2007-09-02
    帖子:
    1,663
    支持:
    830
    Indeed. But it doesn’t look good for someone!
     
    已获得osprey的支持.
  12. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,987
    支持:
    9,517
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From reading comments elsewhere, it appears they didn't send anyone to inspect it or keep an eye on proceedings while it was being overhauled or tested. Certainly not the previous boiler inspector who made several visits to Germany when the boiler was originally built. You'd think after all the problems they've had over the years they would've been more thorough.
     
    已获得SheffMatt37401Johnb的支持.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,423
    支持:
    12,626
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I bet that they will when the time comes to have theP2's boiler shipped, i would not be surprised if it comes over as a bare boiler ,completed, but minus tubes and the tube are inserted and done at Darlington that would make most sence if the boiler inspector is not happy with the standard of work.
     
  14. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,636
    支持:
    2,903
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    Originally yes. So presumably the procedures...EU .. (CE)....were acceptable.
    Again this is all speculative. I don't who placed the order..the charitable trust or the limited company..I assume the latter...so I suggest we all reserve our comments.
     
  15. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,636
    支持:
    2,903
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    You're not obviously informed of CE standards..
     
  16. osprey

    osprey Resident of Nat Pres

    注册日期:
    2007-10-03
    帖子:
    10,636
    支持:
    2,903
    职业:
    semi-retired, currently doing R&D for my patents
    所在地:
    Halifax
    Having read your post again, are you privy to the contract?
     
  17. guycarr360

    guycarr360 Part of the furniture

    注册日期:
    2005-10-04
    帖子:
    4,874
    支持:
    3,191
    性别:
    所在地:
    Chester le Street County Durham
    Wrong, look back at the A1 communication cord, and they visited many times, as per last rebuilds.
     
    已获得osprey的支持.
  18. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,818
    支持:
    12,016
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When I was involved with industrial boilers UK practice (BS2790) was to expand the tubes before welding them to the tube plate followed by a light re-rolling. German practice was to simply weld the tubes in place with no prior expanding. Other problems could be cracking of the tubes if they were expanded prior to welding which would result in leaks on hydraulic testing and the way some tube suppliers are marking the tubes to identify them which is frowned on in the UK. I’ve no idea if any of this is relevant to the problem but they are examples of how problems could easily arise.
     
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,423
    支持:
    12,626
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That was the point i was making, that ways of doing things, and accepted practice can differ between countries, What might be perfectly acceptable in Germany, might not be here in the UK, One thing that possibly might be an issue is the spec of the material the tubes are drawn from, is it common across the industry, or does the UK, spec differ from what is used on the continent ? as the method of securing them differs also,
     
  20. Sheff

    Sheff Resident of Nat Pres

    注册日期:
    2006-04-21
    帖子:
    8,084
    支持:
    3,148
    性别:
    职业:
    Retired Engineer & Heritage Volunteer
    所在地:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was a video doing the rounds of the boiler under hydraulic test in Germany where you could see water weeping down the tube plate. It has since mysteriously disappeared. It’s possible that further work was done subsequently, but that’s not what I hear.
     

分享此页面