If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Gav106, 8 май 2010.

  1. ilvaporista

    ilvaporista Part of the furniture

    Дата регистрации:
    16 янв 2006
    Сообщения:
    4.356
    Симпатии:
    5.456
    Пол:
    Мужской
    Род занятий:
    C.Eng
    Адрес:
    On the 45th!
    I see that the bridge fund has hit £730k, so almost at three quarters of the target. Well done to all. Just the last bit to go...
     
  2. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.997
    Симпатии:
    5.922
    The website says "Revised bridge design now chosen, using a single span, allowing reclaimed ex Reading bridge decks to be used elsewhere in reunification." Is that single span also being re-used from somewhere else? If it's to be brand new doesn't it push the price up, relative to re-using the two spans from Reading? Or does eliminating the middle pier save a lot?
     
  3. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.857
    Симпатии:
    1.655
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If there were 'down time' and or overtime charges from NR to factor in whilst that Pier was built maybe a big saving to be made...
    Having a Single span lifted into place is going to take some Monster Cranes though...
     
  4. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.443
    Симпатии:
    1.749
    More for the deck, but less for earthworks/construction (no centre pier) and also saves moving a Network Rail signal. And without the centre pier the bridge can be placed on a better alignment too, apparently. Also the Reading decks can be used elsewhere along the 'gap' which will save money on the next stage. So overall a good decision, I think.
     
  5. b.oldford

    b.oldford Member

    Дата регистрации:
    29 сен 2009
    Сообщения:
    245
    Симпатии:
    55
    Пол:
    Мужской
    Адрес:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thinking ahead somewhat I have to ask; how are the two railways going to merge their various SMSs and rulebooks etc? Are they going to dilute the better one by finding a compromise between their two standards or are they going to "cherry-pick" from that with the higher/lower standard?
     
  6. Enterprise

    Enterprise Part of the furniture

    Дата регистрации:
    9 сен 2005
    Сообщения:
    5.487
    Симпатии:
    3.320
    A false antithesis that has led inter alia to unnecessarily restrictive legislation throughout Europe.
     
  7. b.oldford

    b.oldford Member

    Дата регистрации:
    29 сен 2009
    Сообщения:
    245
    Симпатии:
    55
    Пол:
    Мужской
    Адрес:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I cannot totally disagree with you; however any differences in standards needs to be resolved well before the first train bridges the gap.

    Operating Rule Book to one side such standards could extend to include brake block wear limits and cleanliness of toilets. All of which are important to the paying punters.
     
    Last edited: 23 янв 2015
  8. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.818
    Симпатии:
    12.016
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I can't help thinking that the physical aspect of bridging the gap is a mere molehill compared with the mountain of integrating the two into a single entity. My take on it is that the southern party principally wants the the gap filling for the NR connection. The northern party probably doesn't really need or want anything additional that can be gained.
     
    NickPreston нравится это.
  9. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Дата регистрации:
    15 апр 2006
    Сообщения:
    16.552
    Симпатии:
    7.905
    Адрес:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know the ins and outs of the politics between the two lines but I am sure that they all want a nice long line to run their trains on.
     
  10. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
  11. Hurricane

    Hurricane Member

    Дата регистрации:
    1 ноя 2013
    Сообщения:
    823
    Симпатии:
    307
    Пол:
    Мужской
    Адрес:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not to mention the link will pretty much demolish the current engine/restoration shed and yard at Loughborough!
     
  12. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Дата регистрации:
    15 апр 2006
    Сообщения:
    16.552
    Симпатии:
    7.905
    Адрес:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There will be, nominally, a city at each end, but the stations are a long way from the centres.
     
  13. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
    I believe that provision for a single track line bypassing the shed but allowing it to continue operating has been made.
     
  14. frazoulaswak

    frazoulaswak Member

    Дата регистрации:
    25 мар 2009
    Сообщения:
    804
    Симпатии:
    2.210
    Пол:
    Мужской
    Род занятий:
    Retired (at last!)
    Адрес:
    Hartford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To take a leaf out of the GWR station naming book, after reunification will Leicester North be renamed Leicester Road and Ruddington become Nottingham Road...?
     
    Bramblewick нравится это.
  15. Flipper

    Flipper New Member

    Дата регистрации:
    3 фев 2012
    Сообщения:
    69
    Симпатии:
    19
    Both parties bring something to the table. I'm sure the Ruddington based group will enjoy having access to a fully signalled, double-track railway. Or do you think they would be much happer sticking with what they've got ?
     
  16. Flipper

    Flipper New Member

    Дата регистрации:
    3 фев 2012
    Сообщения:
    69
    Симпатии:
    19
    Perhaps in the short term, to allow for construction traffic . . .
     
  17. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.818
    Симпатии:
    12.016
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think the idea of a fully signalled double track railway excites everybody. I have no involvement with either organisation but I do have conversations with people from time to time and listen with interest.....
     
  18. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.857
    Симпатии:
    1.655
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well it excites me, but clearly the double track bit isn't going to happen North of the bridge in a hurry.
    If the two continue to exist as separate entities will there be an exchange Station ?
    If Merged will the industrials be re allocated to the new Branchline ?
    How long will it take ( at 25mph with several station stops) to do a full line return...?
    Interesting times...?
     
  19. NickPreston

    NickPreston Member

    Дата регистрации:
    10 мар 2013
    Сообщения:
    215
    Симпатии:
    48
    Out of interest, How is this going to work at the Ruddington end? A train cannot run from GCR directly into Ruddington, it's a reverse manoeuvre for the last half mile or so which GCR(N) manage by topping and tailing. There's no room to run around, and surely this would not be practical anyway part way through every journey along the line anyway. I can't imagine every loco from Leicester topping and tailing, so the only option I can see without trackworks (if there's space) is to have a spare loco to take over the back of the train (which becomes the front) to take it into Ruddington.
    Sounds complicated, or I'm not explaining it very well, the map is here http://www.gcrn.co.uk/about/our-line/
    You'll see what I mean.

    Nick
     
  20. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.818
    Симпатии:
    12.016
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whitby? Dorchester South? It happened there. No doubt there were others. Mind you, that was a long time ago, now.
     

Поделиться этой страницей